Recovery Act Projects
Note: Speadsheet contains link to some contract documents, more will be added over time.
Town |
Project Name |
Agency |
Type |
Contractor |
ARRA Funds |
Project Status |
Expended -as 8/4/10 |
Hartford |
MDC - Homestead Avenue Interceptor Extension |
DEP |
Clean Water |
NE Remsco Construction |
$22,889,625 |
Underway |
|
Hartford |
MDC - Tower Avenue Area - North Sewer Separation |
DEP |
Clean Water |
CB Utility Company |
$5,769,523 |
Underway |
|
Hartford |
MDC - Burton Street Drain Separation |
DEP |
Clean Water |
Baltazar |
$7,828,680 |
Underway |
|
Hartford |
MDC - Granby Street Area Sewer Separation |
DEP |
Clean Water |
Manafort Brothers |
$0 |
Underway |
|
Hartford |
MDC - Green Infrastructure - incinerator #3 |
DEP |
Clean Water |
Banton Construction |
$9,602,060 |
Underway |
|
New Haven |
Port of New Haven Truck Stop Electrification |
DEP |
Diesel |
City of New Haven/Laydon |
$380,256 |
Underway |
|
Statewide |
Retrofit DOT Trucks |
DEP |
Diesel |
Cummins Power |
portion of $510,000 |
Completed |
|
Statewide |
Retrofit Transportation Construction Equipment |
DEP |
Diesel |
Cummins Power |
portion of $510,000 |
Underway |
|
Seymour |
Tingue Dam Bypass Channel |
DEP |
Habitat |
|
$2,500,000 |
In design |
|
Hartford |
Pittman Property |
DEP |
Underground Tanks |
Loureiro Engineering |
$200,000 |
Underway |
|
Mansfield |
Hammer Property |
DEP |
Underground Tanks |
Loureiro Engineering |
$165,000 |
Underway |
|
New Haven |
Pitts Chapel Property |
DEP |
Underground Tanks |
Loureiro Engineering |
$125,000 |
Underway |
|
Stratford |
2350 Stratford Avenue Property |
DEP |
Underground Tanks |
Loureiro Engineering |
$300,000 |
Underway |
|
Terryville |
Fuller Property |
DEP |
Underground Tanks |
Loureiro Engineering |
$200,000 |
Underway |
|
Waterbury |
Monti Property |
DEP |
Underground Tanks |
Loureiro Engineering |
$80,000 |
Underway |
|
Waterbury |
Renner Property |
DEP |
Underground Tanks |
Loureiro Engineering |
$25,000 |
Underway |
|
Windsor Locks |
Reconstruction of Runway 15-33 @ Bradley Airport |
DOT |
Aviation |
Tilcon Connecticut, Inc. |
$7,500,000 |
Completed |
|
Mystic/Stonington |
Mystic Streetscape improvements |
DOT |
Enhancement |
Milton C. Beebe & Sons |
$905,760 |
Underway |
$507,160 |
Darien |
Noroton Heights Station Improvements |
DOT |
Enhancement |
Blakeslee Arpaia Chapman |
$499,600 |
Underway |
$6,879 |
Stratford |
Housatonic River Greenway |
DOT |
Enhancement |
TBD |
$750,000 |
Summer 2010 |
$4,253 |
East Hartford/Manchester |
I-84/I-384 Trail |
DOT |
Enhancement |
American Industries |
$766,866 |
Underway |
$9,242 |
Mansfield |
Birch Road Bikeway |
DOT |
Enhancement |
TBD |
$300,000 |
Summer 2010 |
|
New Fairfield |
Town Center Streetscape |
DOT |
Enhancement |
Reliable Excavating |
$338,000 |
Underway |
$3,922 |
Torrington |
Sue Grossman Stillwater Greenway |
DOT |
Enhancement |
Schultz Construction |
$900,000 |
Completed |
$822,662 |
Burlington |
Burlington Trail to Farmington Trail |
DOT |
Enhancement |
Mastrobattisto |
$249,219 |
Summer 2010 |
$786 |
Southington |
Linear Park |
DOT |
Enhancement |
Schultz Construction |
$1,902,990 |
Underway |
$356,265 |
Redding |
Georgetown Village Streetscape |
Regional MPO |
Enhancement |
M. Rondano |
$552,000 |
Summer 2010 |
|
Enfield |
Rt 5 over I-91 Bridge Rehabilitation, Enfield |
DOT |
Highway/Bridge |
Arborio Corp. |
$6,657,600 |
Underway |
$3,976,313 |
Trumbull/Fairfield |
Rt 15 Resurf., Safety; Trumbull/Fairfield |
DOT |
Highway/Bridge |
O&G Industries, Inc. |
$70,745,000 |
Underway |
$31,988,428 |
Ashford |
Rt. 89 Superstructure Replacement. |
DOT |
Highway/Bridge |
Milton C. Beebe & Sons |
$1,272,600 |
Underway |
$622,767 |
Various |
Distr. 2 Traffic Control Signals |
DOT |
Highway/Bridge |
Electrical Contractors, Inc. |
$2,201,050 |
Underway |
$894,359 |
Various |
Distr. 1 Traffic Control Signals and Revisions |
DOT |
Highway/Bridge |
AM Rizzo |
$1,362,070 |
Underway |
$762,114 |
Various |
Replacement of Bridge Deck Joints Dist IV |
DOT |
Highway/Bridge |
Mohawk |
$5,734,200 |
Completed |
$4,989,609 |
Old Saybrook |
Replacement of Bridge Deck Joints on Baldwin Bridge |
DOT |
Highway/Bridge |
Blakeslee |
$2,851,300 |
Completed |
$2,305,444 |
Branford |
Reconstruction of Bridge No. 00340 (Amtrak R.R. over US 1) |
DOT |
Highway/Bridge |
JF White/Empire |
$70,815,491 |
Underway |
$6,670,585 |
Various |
Traffic Control signal installations and revisions, District 3 |
DOT |
Highway/Bridge |
NYCONN Corp. |
$1,599,887 |
Underway |
$866,559 |
Westport |
Hales Road Bridge |
DOT |
Highway/Bridge |
Loureiro Contractors Inc. |
$4,192,758 |
Underway |
$1,852,710 |
Statewide |
Replacement of Overhead Sign Supports |
DOT |
Highway/Bridge |
ADF Industries |
$5,575,600 |
Underway |
$1,397,939 |
Various |
District 4 Traffic Control Signs |
DOT |
Highway/Bridge |
NYCONN Corp. |
$788,940 |
Underway |
$231,885 |
Rocky Hill/Wethersfield |
I-91 Pavement Preservation |
DOT |
Highway/Bridge |
Empire Paving |
$4,748,987 |
Completed |
$4,018,719 |
Seymour/Beacon Falls/Naugatuck |
Route 8 Pavement Preservation |
DOT |
Highway/Bridge |
Tilcon Connecticut, Inc. |
$3,932,474 |
Completed |
$2,943,822 |
Colchester |
Route 2 Pavement Preservation |
DOT |
Highway/Bridge |
Empire Paving |
$3,802,792 |
Completed |
$3,188,965 |
Various |
Statewide Pavement Preservation |
DOT |
Highway/Bridge |
Costello Industries |
$2,204,907 |
Completed |
$1,791,498 |
District 1 |
Interstate Epoxy Pavement Markings - Long Lines |
DOT |
Highway/Bridge |
Safety Marking |
$189,000 |
Completed |
$139,004 |
District 2 |
Interstate Epoxy Pavement Markings - Long Lines |
DOT |
Highway/Bridge |
Safety Marking |
$189,000 |
Completed |
$124,430 |
District 3 |
Interstate Epoxy Pavement Markings - Long Lines |
DOT |
Highway/Bridge |
Safety Marking |
$245,000 |
Completed |
$219,641 |
District 4 |
Interstate Epoxy Pavement Markings - Long Lines |
DOT |
Highway/Bridge |
Safety Marking |
$77,000 |
Completed |
$47,305 |
District 1 |
Non-interstate Epoxy Pavement Markings - Long Lines |
DOT |
Highway/Bridge |
Safety Marking |
$368,000 |
Completed |
$300,353 |
District 2 |
Non-interstate Epoxy Pavement Markings - Long Lines |
DOT |
Highway/Bridge |
Safety Marking |
$464,000 |
Completed |
$390,362 |
District 3 |
Non-interstate Epoxy Pavement Markings - Long Lines |
DOT |
Highway/Bridge |
Safety Marking |
$416,000 |
Underway |
|
District 4 |
Non-interstate Epoxy Pavement Markings - Long Lines |
DOT |
Highway/Bridge |
Safety Marking |
$352,000 |
Underway |
|
District 1 |
Intersection Epoxy Pavement Markings |
DOT |
Highway/Bridge |
Highway Safety Systems |
$220,340 |
Summer 2010 |
$9,368 |
District 2 |
Intersection Epoxy Pavement Markings |
DOT |
Highway/Bridge |
Safety Marking |
$213,420 |
Underway |
$7,972 |
District 3 |
Intersection Epoxy Pavement Markings |
DOT |
Highway/Bridge |
Safety Marking |
$567,740 |
Summer 2010 |
$5,577 |
District 4 |
Intersection Epoxy Pavement Markings |
DOT |
Highway/Bridge |
Highway Safety Systems |
$237,740 |
Summer 2010 |
$5,756 |
East Lyme, Waterford and Montville |
I-395 Pavement Preservation |
DOT |
Highway/Bridge |
Empire Paving |
$4,134,146 |
Underway |
$2,817,586 |
Rocky Hill/Cromwell |
I-91 Pavement Preservation SB |
DOT |
Highway/Bridge |
American Industries |
$3,928,740 |
Underway |
$196,137 |
Various |
Interstate Epoxy Pavement Markings - I-95 N - District 2 |
DOT |
Highway/Bridge |
|
$250,000 |
Summer 2010 |
|
Various |
Non-interstate Crack Sealing - Districts 1 and 4 |
DOT |
Highway/Bridge |
|
$545,000 |
Summer 2010 |
|
Washington |
Replacement of Concrete Crib |
Regional MPO |
Highway/Bridge |
|
$300,000 |
Summer 2010 |
|
Various |
Installation of STC Traffic Signals - District 2 |
DOT |
Highway/Bridge |
|
$650,000 |
Summer 2010 |
|
Newington |
Rte 173 and Rte 529 Safety Improvements |
Regional MPO |
Highway/Bridge |
|
$1,400,000 |
Summer 2010 |
|
Various |
Installation of STC Traffic Signals - District 3 |
DOT |
Highway/Bridge |
|
$1,100,000 |
Summer 2010 |
|
Mansfield |
Bypass at Birch Rd and Cedar Swamp Rd |
Regional MPO |
Highway/Bridge |
|
$141,000 |
Summer 2010 |
|
Statewide |
Bus Procurement - 35' and 40' buses (37 diesel/31 hybrid) |
DOT |
Transit |
New Flyer |
$31,176,010 |
Underway |
$24,522,988 - combined bus expenditures |
Statewide |
Bus Procurement - 60' articulated buses (25 diesel/6 hybrid) |
DOT |
Transit |
Nova |
$20,354,125 |
Underway |
$24,522,988 - combined bus expenditures |
Statewide |
Bus Procurement - 45' commuter buses (33) |
DOT |
Transit |
MCI |
$17,312,559 |
Underway |
$24,522,988 - combined bus expenditures |
Norwalk |
Transit Security Improvements - Pulse Point |
DOT |
Transit |
Waters Construction |
$1,500,000 |
Spring 2010 |
|
Statewide |
Park and Ride Lot Improvements |
DOT |
Transit |
Empire Paving |
$2,237,778 |
Underway |
$4,111 |
Bridgeport |
Bus Engine Repowering |
DOT |
Transit |
Cummins Power |
$2,800,000 |
Underway |
|
Multiple Locations |
New Haven Line Improvements - Phase A |
DOT |
Transit |
Lawrence Bronoli |
$5,945,416 |
Underway |
$947,278 |
Multiple Locations |
New Haven Line Improvements - Phase B |
DOT |
Transit |
Rizzo Corporation |
$4,054,584 |
Underway |
|
Multiple Locations |
Danbury CTC |
DOT |
Transit |
Metro-North Railroad |
$30,000,000 |
Underway |
|
Branford |
Shoreline East RR Station Parking |
DOT |
Transit |
Guerrera Construction |
$5,400,000 |
Underway |
$1,615,901 |
New Haven |
Rail Yard Component Shop |
DOT |
Transit |
O&G Industries, Inc. |
$29,927,641 |
Summer 2010 |
$11,584,057 |
Norwich |
Norwich Public Utilities - Fairview Storage Tank - Storage tank repair & painting, pump station upgrades |
DPH |
Drinking Water |
Amstar of Western New York, Inc.; Electrical Energy System Corp. |
$750,000 |
Completed |
$78,872 |
Norwich |
Norwich Public Utilities - Richard Brown Dr. Storage Tank - Storage tank repair & painting, pump station upgrades |
DPH |
Drinking Water |
Amstar of Western New York, Inc. |
$750,000 |
Completed |
$296,637 |
Plainfield |
CTWC - Gallup Water Service - Harrington MHP interconnection |
DPH |
Drinking Water |
TBD |
$300,000 |
Completed |
$192,195 |
Ridgefield |
Barlow Mountian and Scotland Elementary School water main |
DPH |
Drinking Water |
Anthony Julian Railroad Construction Company, Inc |
$1,500,000 |
Underway |
|
Putnam |
Putnam Water Pollution Control Authority - Park Street well field |
DPH |
Drinking Water |
TBD |
$2,800,000 |
Underway |
$738,074 |
Brookfield |
Water main - Silvermine Road |
DPH |
Drinking Water |
TBD |
$1,706,184 |
Underway |
$1,167,442 |
East Lyme |
East Lyme Water & Sewer Commission - System-wide Chlorine Disinfection |
DPH |
Drinking Water |
C.H. Nickerson & Co |
$1,241,000 |
Underway |
$542,130 |
Tolland |
Water Department - Torrey Road |
DPH |
Drinking Water |
Catco Construction, LLC |
$175,000 |
Underway |
$145,480 |
Hartford |
MDC - Meter Systems |
DPH |
Drinking Water |
Itron, Inc. |
$5,950,000 |
Underway |
$5,168,136 |
Hartford |
MDC - Franklin Ave/George St. main |
DPH |
Drinking Water |
TBD |
$242,650 |
Underway |
|
Hartford |
MDC - Tower Avenue water main |
DPH |
Drinking Water |
TBD |
$597,666 |
Underway |
|
Woodbury |
Woodlake Tax District - New wells |
DPH |
Drinking Water |
TBD |
$495,650 |
Underway |
$334,203 |
Manchester |
Hercules Drive Booster Pump Station |
DPH |
Drinking Water |
TBD |
$750,000 |
Underway |
|
Rocky Hill |
Veterans' Home |
DPW/DVA |
Veterans' Affairs |
TBD |
$5,934,500 |
Final Design Phase |
|
Bridgeport |
Bullard Haven Vocational/Technical High School |
OPM/DPW |
State Energy Program |
TBD |
$192,449 |
Completed |
|
Farmington |
UConn Health Center - Kane Street - Lighting |
OPM/DPW |
State Energy Program |
TBD |
$150,856 |
Completed |
|
Farmington |
UConn Health Center - Munson Road - Lighting |
OPM/DPW |
State Energy Program |
|
$536,042 |
Completed |
|
Hartford |
410-470 Capitol Avenue |
OPM/DPW |
State Energy Program |
TBD |
$862,900 |
Underway |
|
Uncasville |
Uncas-on-Thames |
OPM/DPW |
State Energy Program |
TBD |
$264,006 |
Completed |
|
Hartford |
25 Sigourney Street Garage |
OPM/DPW |
State Energy Program |
TBD |
$179,493 |
Completed |
|
Danbury |
Danbury Courthouse |
OPM/DPW |
State Energy Program |
TBD |
$320,000 |
Completed |
|
Danbury |
Western Connecticut State University - Litchfield Hall |
OPM/DPW |
State Energy Program |
TBD |
$79,884 |
Completed |
|
Milford |
Milford Courthouse |
OPM/DPW |
State Energy Program |
TBD |
$674,900 |
Underway |
|
Statewide |
Fish Hatcheries - Burlington/Kensington |
OPM/DPW |
State Energy Program |
TBD |
$16,993 |
Completed |
|
Hartford |
165 Capitol Avenue - State Office Building |
OPM/DPW |
State Energy Program |
TBD |
$320,000 |
Summer 2010 |
|
Hartford |
79 Elm Street - DEP HQ |
OPM/DPW |
State Energy Program |
TBD |
$818,775 |
Underway |
|
Rocky Hill |
Old Main Street Pavement Rehabilitation |
Regional MPO |
Highway/Bridge |
J. Iapaluccio Inc. |
$1,952,000 |
Completed |
$1,154,748 |
Danbury |
Backus Avenue Bridge Replacement |
Regional MPO |
Highway/Bridge |
Hemlock Construction |
$504,686 |
Underway |
$8,567 |
New Fairfield |
Paving Town Park and Ride Lot for HART/Metro North Shuttle |
Regional MPO |
Highway/Bridge |
A&J Construction |
$220,000 |
Completed |
$204,368 |
Naugatuck |
Rubber Avenue Bridge |
Regional MPO |
Highway/Bridge |
Dayton Construction |
$1,168,891 |
Underway |
$11,762 |
Montville |
Old Colchester Road Bridge Repair |
Regional MPO |
Highway/Bridge |
Mastrobattisto |
$2,002,000 |
Underway |
$7,762 |
South Windsor |
Buckland Road Pavement Rehabilitation |
Regional MPO |
Highway/Bridge |
Tilcon Connecticut, Inc. |
$2,200,000 |
Completed |
$912,824 |
Berlin |
Paving/Reconstruction of Episcopal Road |
Regional MPO |
Highway/Bridge |
General Paving Construction |
$498,786 |
Completed |
$14,894 |
Manchester |
Slater Street Intersection Improvements |
Regional MPO |
Highway/Bridge |
NYCONN Corp. |
$270,000 |
Completed |
$3,751 |
Manchester |
Buckland Hills Drive/Hale Road Pavement |
Regional MPO |
Highway/Bridge |
Mather Corp. |
$3,410,000 |
Underway |
$102,341 |
Windsor |
Day Hill Road Pavement Rehabilitation |
Regional MPO |
Highway/Bridge |
Spazzarini Construction |
$2,200,000 |
Completed |
$727,240 |
Middlebury |
Long Meadow Road Bridge Replacement |
Regional MPO |
Highway/Bridge |
Black and Warner |
$171,285 |
Underway |
$167,700 |
New Haven |
Reconstruction of Quinnipiac Avenue |
Regional MPO |
Highway/Bridge |
Empire Paving |
$7,300,000 |
Underway |
$30,676 |
New Haven |
Congress Avenue Pavement Rehabilitation |
Regional MPO |
Highway/Bridge |
TBD |
$843,700 |
Summer 2010 |
|
Bethel |
Milling and Paving of Old Hawleyville Road |
Regional MPO |
Highway/Bridge |
A&J Construction |
$581,000 |
Summer 2010 |
|
Bridgeport |
Pavement Rehabilitation of Iranistan Ave. and Capitol Ave. |
Regional MPO |
Highway/Bridge |
Mark IV Construction |
$2,100,000 |
Summer 2010 |
$4,885 |
Bridgeport |
Congress Street Bridge demolition - phase 1 |
Regional MPO |
Highway/Bridge |
S&R Corporation |
$1,200,000 |
Underway |
$446,170 |
Barkhamsted |
Hillcrest Drive - cracksealing and overlay |
Regional MPO |
Highway/Bridge |
|
$177,000 |
|
$557 |
Colebrook |
Riverton Road - crack sealing and chip seal |
Regional MPO |
Highway/Bridge |
All States Asphalt |
$126,000 |
Underway |
$511 |
Canton |
Farmington River Trail Phase III |
Regional MPO |
Highway/Bridge |
S. Carpenter Construction |
$2,200,000 |
Summer 2010 |
$45 |
Coventry |
Main St. Sidewalk, Paden Rd. to 1000’ North of Route 275 |
Regional MPO |
Highway/Bridge |
VMS Construction |
$663,000 |
Underway |
$293 |
Danbury |
Milling and Paving of White Street, Franklin Street, and Franklin Street Extension |
Regional MPO |
Highway/Bridge |
A&J Construction |
$2,175,000 |
Underway |
$2,461 |
Darien |
Pavement Resurfacing of Hollow Tree Ridge Road, West Ave., and Leroy Ave. |
Regional MPO |
Highway/Bridge |
Burns Construction |
$975,000 |
Underway |
|
Derby |
Milling and Overlay of Elizabeth Street |
Regional MPO |
Highway/Bridge |
Cocchiola Paving |
$650,000 |
Summer 2010 |
$944 |
East Hartford |
Pavement Rehabilitation of Portions of Main St. and School St. |
Regional MPO |
Highway/Bridge |
JSL Asphalt |
$2,260,000 |
Underway |
|
Fairfield |
Black Rock Turnpike intersection improvement at Commerce Drive |
Regional MPO |
Highway/Bridge |
|
$1,125,000 |
Summer 2010 |
|
Litchfield |
White Wood Road Overlay |
Regional MPO |
Highway/Bridge |
Waters Construction |
$165,000 |
Underway |
$446 |
Mansfield |
Paving of Mansfield City Road |
Regional MPO |
Highway/Bridge |
Tilcon Connecticut, Inc. |
$243,000 |
Underway |
|
Middletown |
Paving of Industrial Park Rd. |
Regional MPO |
Highway/Bridge |
American Industries |
$1,043,373 |
Summer 2010 |
|
Monroe |
Cross Hill Rd. Strategic Paving Project |
Regional MPO |
Highway/Bridge |
|
$1,050,000 |
Summer 2010 |
|
Morris |
Crack Sealing and Microsurfacing of Alain White Road |
Regional MPO |
Highway/Bridge |
New England Asphalt Services |
$140,000 |
Summer 2010 |
$509 |
New Canaan |
Pavement Resurfacing of Old Norwalk Road, Farm Road, West Road, and Weed Road |
Regional MPO |
Highway/Bridge |
FGB Construction |
$975,000 |
Summer 2010 |
|
New Hartford |
Crack Sealing and Microsurfacing of West Hill Road |
Regional MPO |
Highway/Bridge |
The Gorman Group |
$165,000 |
Summer 2010 |
|
New Haven |
Rehabilitation of Quinnipiac Avenue- Phase 2, City of New Haven |
Regional MPO |
Highway/Bridge |
Laydon Industries |
$2,700,000 |
Summer 2010 |
|
New Haven |
Traffic Control Signal Controllers |
Regional MPO |
Highway/Bridge |
Republic Intelligent Transportation Services |
$3,258,000 |
Summer 2010 |
|
New London |
Montauk Ave. Improvements - Phase 1 |
Regional MPO |
Highway/Bridge |
Cherry Hill Construction |
$707,000 |
Underway |
|
New Milford |
Milling and Paving of Boardman Road and Grove St. |
Regional MPO |
Highway/Bridge |
Cocchiola Paving |
$918,000 |
Underway |
$1,289 |
Newtown |
Milling and Paving of Castle Hill Rd. full depth reclamation and paving of Castle Meadow Rd. |
Regional MPO |
Highway/Bridge |
A&J Construction |
$635,000 |
Summer 2010 |
|
Norwalk |
Paving of Dr. Martin King Jr. Dr., Belden Hill Rd., Butler St., Harbor Ave. |
Regional MPO |
Highway/Bridge |
Empire Paving |
$1,901,000 |
Summer 2010 |
|
Plainfield |
Route 12 sidewalks from SR 647 to School St. and from RR Avenue to Academy Hill Rd. |
Regional MPO |
Highway/Bridge |
New England Concrete Service |
$1,113,000 |
Underway |
$44,816 |
Plainville |
Reconstruction and Paving of Camp St. |
Regional MPO |
Highway/Bridge |
Red Technologies |
$439,000 |
Summer 2010 |
|
Plymouth |
Mill and Overlay Harwington Ave., Route 6 to Armbruster Rd. |
Regional MPO |
Highway/Bridge |
Cherry Hill Construction |
$307,000 |
Summer 2010 |
$1,417 |
Prospect |
Resurfacing of Straitsville Road |
Regional MPO |
Highway/Bridge |
|
$311,000 |
Summer 2010 |
|
Putnam |
Church St.Pavement Preservation |
Regional MPO |
Highway/Bridge |
|
$654,000 |
Summer 2010 |
|
Ridgefield |
Milling and Paving of Farmingville Rd. and Old Stagecoach Rd. |
Regional MPO |
Highway/Bridge |
Guerrera Construction |
$679,000 |
Summer 2010 |
|
Scotland |
Station Road Bridge (Br. #4768) Repair |
Regional MPO |
Highway/Bridge |
Barr, Inc. |
$350,000 |
Underway |
$472 |
Seymour |
Pavement Rehabilitation of Derby Ave. |
Regional MPO |
Highway/Bridge |
|
$650,000 |
Summer 2010 |
|
Shelton |
Constitution Boulevard pavement rehabilitation |
Regional MPO |
Highway/Bridge |
|
$650,000 |
Summer 2010 |
|
Southington |
Mill and Overlay South End Rd. and Mount Vernon Rd. |
Regional MPO |
Highway/Bridge |
Quality Associates |
$1,039,000 |
Summer 2010 |
|
Stratford |
Repaving Bruce Ave. |
Regional MPO |
Highway/Bridge |
Cherry Hill Construction |
$300,000 |
Summer 2010 |
|
Torrington |
Mill and Overlay Litchfield St., Winthrop St., and Water St. |
Regional MPO |
Highway/Bridge |
Pierce Builders |
$1,173,000 |
Underway |
|
Trumbull |
Resurface Whitney Ave. |
Regional MPO |
Highway/Bridge |
Waters Construction |
$950,000 |
Summer 2010 |
|
Waterford |
Intersection Improvements at Route 32, Lathrop Rd., and Maple Rd. |
Regional MPO |
Highway/Bridge |
Cherry Hill Construction |
$1,052,000 |
Underway |
$1,074 |
Watertown |
Resurfacing of French Street |
Regional MPO |
Highway/Bridge |
|
$731,000 |
Summer 2010 |
$555 |
Westbrook |
Milling and Paving McVeagh Road from Route 153 to Pond Meadow Road |
Regional MPO |
Highway/Bridge |
Charles Pasteryak, Jr. |
$660,000 |
Underway |
|
Weston |
Old Hyde Raod Pavement Preservation |
Regional MPO |
Highway/Bridge |
A&J Construction |
$290,000 |
Underway |
$1,306 |
Winchester |
Wetmore Avenue Overlay |
Regional MPO |
Highway/Bridge |
Cherry Hill Construction |
$400,000 |
Summer 2010 |
$404 |
Ansonia |
Resurfacing of Ford St. and Beaver St. |
Regional MPO |
Highway/Bridge |
Cocchiola Paving |
$650,000 |
Summer 2010 |
|
Brookfield |
Gray's Bridge Rd. Milling and Paving |
Regional MPO |
Highway/Bridge |
Cocchiola Paving |
$581,000 |
Summer 2010 |
|
East Hampton |
Haddam Neck Rd. Resurfacing |
Regional MPO |
Highway/Bridge |
Charles Pasteryak, Jr. |
$236,000 |
Completed |
|
Enfield |
Post Office Rd. Reconstruction |
Regional MPO |
Highway/Bridge |
Spazzarini Construction |
$3,822,000 |
Underway |
|
Greenwich |
Pavement Reconstruction and Overlay of Field Point Rd., Dearfield Dr., Brookside Dr., West Elm St., Railroad Ave., Prospect St. and Horseneck Lane |
Regional MPO |
Highway/Bridge |
FGB Construction |
$1,300,000 |
Underway |
$10,955 |
Hartford |
Improvements on Park St. from Laurel St. to I-84/Pope Park Highway #4 |
Regional MPO |
Highway/Bridge |
|
$3,770,000 |
Summer 2010 |
|
Killingly |
Reconstruction of a Portion of Lake Road |
Regional MPO |
Highway/Bridge |
American Industries |
$559,000 |
Summer 2010 |
$310 |
New Britain |
Mill and Overlay Corbin Ave., East St., and Stanley St. |
Regional MPO |
Highway/Bridge |
Colossale Concrete |
$1,735,000 |
Underway |
|
Bristol |
Mix Street Reconstruction and Normalization of Intersection with Maltby Street |
Regional MPO |
Highway/Bridge |
Martin Laviero Construction |
$1,500,000 |
Underway |
|
Cheshire |
Paving of West Johnson Road |
Regional MPO |
Highway/Bridge |
Empire Paving |
$708,000 |
Summer 2010 |
|
Cromwell |
Paving Geer St. |
Regional MPO |
Highway/Bridge |
Quality Associates |
$303,000 |
Summer 2010 |
|
Durham |
Paving Maiden Lane |
Regional MPO |
Highway/Bridge |
Charles Pasteryak, Jr. |
$136,000 |
Summer 2010 |
|
East Haddam |
Lake Shore Drive Paving |
Regional MPO |
Highway/Bridge |
|
$81,000 |
Summer 2010 |
|
Goshen |
Crack Sealing and Microsurfacing of Goshen East St./East St. North |
Regional MPO |
Highway/Bridge |
|
$339,900 |
Summer 2010 |
$202 |
Groton |
Mystic Streetscape - Phase 2 |
Regional MPO |
Highway/Bridge |
Pettini Contracting Corporation |
$800,000 |
Summer 2010 |
|
Groton |
Bridge Street Streetscape |
Regional MPO |
Highway/Bridge |
Empire Paving |
$1,530,000 |
Summer 2010 |
|
Guilford |
Pavement Preservation of Stepstone Hill Rd. |
Regional MPO |
Highway/Bridge |
American Industries |
$548,000 |
Summer 2010 |
|
Manchester |
Charter Oak Greenway Extension |
Regional MPO |
Enhancement |
King Construction |
$643,000 |
Summer 2010 |
|
Middlefield |
Paving Various Locations |
Regional MPO |
Highway/Bridge |
New England Asphalt Services |
$100,829 |
Summer 2010 |
|
North Canaan |
Membrane and Overlay Bridge #5207 Lower Rd. |
Regional MPO |
Highway/Bridge |
New England Infrastructure |
$337,000 |
Underway |
$667 |
Old Saybrook |
Route 1 Sidewalks |
Regional MPO |
Highway/Bridge |
Colossale Concrete |
$440,000 |
Summer 2010 |
|
Oxford |
Resurfacing of Christian Street |
Regional MPO |
Highway/Bridge |
|
$165,000 |
Summer 2010 |
|
Portland |
Paving of Bartlett St., Collins Hill Rd., High St., and Jobs Pond Rd. |
Regional MPO |
Highway/Bridge |
New England Asphalt Services |
$235,000 |
Underway |
|
Pomfret |
Replace bridge over Mashamoquet Brook |
Regional MPO |
Highway/Bridge |
New England Infrastructure |
$763,000 |
Underway |
|
Roxbury |
Judds Bridge Painting |
Regional MPO |
Highway/Bridge |
|
$233,000 |
Summer 2010 |
|
Salisbury |
Routes 44 and 41, sidewalks and curbing |
Regional MPO |
Highway/Bridge |
Mather Corp. |
$394,000 |
Summer 2010 |
|
Stamford |
Stamford Urban Transitway |
Regional MPO |
Transit |
|
|
|
|
Southbury |
Main St. South Pavement Preservation |
Regional MPO |
Highway/Bridge |
|
$489,000 |
Summer 2010 |
|
Stonington |
Mystic Streetscape Improvement |
Regional MPO |
Highway/Bridge |
GEG Construction |
$500,000 |
Underway |
|
Stratford |
Barnum Avenue Streetscape Project |
Regional MPO |
Highway/Bridge |
G, Pic and Sons Construction |
$1,500,000 |
Summer 2010 |
|
Thomaston |
Pavement Rehabilitation of Old Northfield Road |
Regional MPO |
Highway/Bridge |
Empire Paving |
$171,000 |
Underway |
$276 |
Vernon |
Historic Talcottville Streetscape |
Regional MPO |
Enhancement |
VMS Construction |
$136,118 |
Underway |
|
Waterbury |
Sidewalk Improvements on Cooke St. |
Regional MPO |
Highway/Bridge |
J. Iapaluccio Inc. |
$4,046,000 |
Summer 2010 |
$412 |
Westport |
Resurface Cross Highway, Long Lots Road and Newtown Turnpike |
Regional MPO |
Highway/Bridge |
FGB Construction |
$975,000 |
Underway |
$34,794 |
Windham |
Paving of High Street, Valley St., and Jackson St. |
Regional MPO |
Highway/Bridge |
American Industries |
$575,000 |
Underway |
|
Wolcott |
Paving of Long Swamp Rd. |
Regional MPO |
Highway/Bridge |
Cocchiola Paving |
$495,000 |
Summer 2010 |
|
Content Last Modified on 8/18/2010 9:51:56 AM
|