Note: Speadsheet contains link to some contract documents, more will be added over time.
 
Town Project Name Agency Type Contractor ARRA Funds Project Status Expended -as 8/4/10
Hartford MDC - Homestead Avenue Interceptor Extension DEP Clean Water NE Remsco Construction $22,889,625 Underway  
Hartford MDC - Tower Avenue Area - North Sewer Separation DEP Clean Water CB Utility Company $5,769,523 Underway  
Hartford MDC - Burton Street Drain Separation DEP Clean Water Baltazar $7,828,680 Underway  
Hartford MDC - Granby Street Area Sewer Separation DEP Clean Water Manafort Brothers $0 Underway  
Hartford MDC - Green Infrastructure - incinerator #3 DEP Clean Water Banton Construction $9,602,060 Underway  
New Haven Port of New Haven Truck Stop Electrification DEP Diesel City of New Haven/Laydon $380,256 Underway  
Statewide Retrofit DOT Trucks DEP Diesel Cummins Power portion of $510,000 Completed  
Statewide Retrofit Transportation Construction Equipment DEP Diesel Cummins Power portion of $510,000 Underway  
Seymour Tingue Dam Bypass Channel DEP Habitat   $2,500,000 In design  
Hartford Pittman Property DEP Underground Tanks Loureiro Engineering $200,000 Underway  
Mansfield Hammer Property DEP Underground Tanks Loureiro Engineering $165,000 Underway  
New Haven Pitts Chapel Property DEP Underground Tanks Loureiro Engineering $125,000 Underway  
Stratford 2350 Stratford Avenue Property DEP Underground Tanks Loureiro Engineering $300,000 Underway  
Terryville Fuller Property DEP Underground Tanks Loureiro Engineering $200,000 Underway  
Waterbury Monti Property DEP Underground Tanks Loureiro Engineering $80,000 Underway  
Waterbury Renner Property DEP Underground Tanks Loureiro Engineering $25,000 Underway  
Windsor Locks Reconstruction of Runway 15-33 @ Bradley Airport DOT Aviation Tilcon Connecticut, Inc. $7,500,000 Completed  
Mystic/Stonington Mystic Streetscape improvements DOT Enhancement Milton C. Beebe & Sons $905,760 Underway $507,160
Darien Noroton Heights Station Improvements DOT Enhancement Blakeslee Arpaia Chapman $499,600 Underway $6,879
Stratford Housatonic River Greenway DOT Enhancement TBD $750,000 Summer 2010 $4,253
East Hartford/Manchester I-84/I-384 Trail DOT Enhancement American Industries $766,866 Underway $9,242
Mansfield Birch Road Bikeway DOT Enhancement TBD $300,000 Summer 2010  
New Fairfield Town Center Streetscape DOT Enhancement Reliable Excavating $338,000 Underway $3,922
Torrington Sue Grossman Stillwater Greenway DOT Enhancement Schultz Construction $900,000 Completed $822,662
Burlington Burlington Trail to Farmington Trail DOT Enhancement Mastrobattisto $249,219 Summer 2010 $786
Southington Linear Park DOT Enhancement Schultz Construction $1,902,990 Underway $356,265
Redding Georgetown Village Streetscape Regional MPO Enhancement M. Rondano $552,000 Summer 2010  
Enfield Rt 5 over I-91 Bridge Rehabilitation, Enfield DOT Highway/Bridge Arborio Corp. $6,657,600 Underway $3,976,313
Trumbull/Fairfield Rt 15 Resurf., Safety; Trumbull/Fairfield DOT Highway/Bridge O&G Industries, Inc. $70,745,000 Underway $31,988,428
Ashford Rt. 89 Superstructure Replacement. DOT Highway/Bridge Milton C. Beebe & Sons $1,272,600 Underway $622,767
Various Distr. 2 Traffic Control Signals DOT Highway/Bridge Electrical Contractors, Inc. $2,201,050 Underway $894,359
Various Distr. 1  Traffic Control Signals and Revisions DOT Highway/Bridge AM Rizzo $1,362,070 Underway $762,114
Various Replacement of Bridge Deck Joints Dist IV DOT Highway/Bridge Mohawk $5,734,200 Completed $4,989,609
Old Saybrook Replacement of Bridge Deck Joints on Baldwin Bridge DOT Highway/Bridge Blakeslee $2,851,300 Completed $2,305,444
Branford Reconstruction of  Bridge No. 00340 (Amtrak R.R. over US 1) DOT Highway/Bridge JF White/Empire $70,815,491 Underway $6,670,585
Various Traffic Control signal installations and revisions, District 3 DOT Highway/Bridge NYCONN Corp. $1,599,887 Underway $866,559
Westport Hales Road Bridge DOT Highway/Bridge Loureiro Contractors Inc. $4,192,758 Underway $1,852,710
Statewide Replacement of Overhead Sign Supports DOT Highway/Bridge ADF Industries $5,575,600 Underway $1,397,939
Various District 4 Traffic Control Signs DOT Highway/Bridge NYCONN Corp. $788,940 Underway $231,885
Rocky Hill/Wethersfield I-91 Pavement Preservation DOT Highway/Bridge Empire Paving $4,748,987 Completed $4,018,719
Seymour/Beacon Falls/Naugatuck Route 8 Pavement Preservation DOT Highway/Bridge Tilcon Connecticut, Inc. $3,932,474 Completed $2,943,822
Colchester Route 2 Pavement Preservation DOT Highway/Bridge Empire Paving $3,802,792 Completed $3,188,965
Various Statewide Pavement Preservation DOT Highway/Bridge Costello Industries $2,204,907 Completed $1,791,498
District 1 Interstate Epoxy Pavement Markings - Long Lines DOT Highway/Bridge Safety Marking $189,000 Completed $139,004
District 2 Interstate Epoxy Pavement Markings - Long Lines DOT Highway/Bridge Safety Marking $189,000 Completed $124,430
District 3 Interstate Epoxy Pavement Markings - Long Lines DOT Highway/Bridge Safety Marking $245,000 Completed $219,641
District 4 Interstate Epoxy Pavement Markings - Long Lines DOT Highway/Bridge Safety Marking $77,000 Completed $47,305
District 1 Non-interstate Epoxy Pavement Markings - Long Lines DOT Highway/Bridge Safety Marking $368,000 Completed $300,353
District 2 Non-interstate Epoxy Pavement Markings - Long Lines DOT Highway/Bridge Safety Marking $464,000 Completed $390,362
District 3 Non-interstate Epoxy Pavement Markings - Long Lines DOT Highway/Bridge Safety Marking $416,000 Underway  
District 4 Non-interstate Epoxy Pavement Markings - Long Lines DOT Highway/Bridge Safety Marking $352,000 Underway  
District 1 Intersection Epoxy Pavement Markings DOT Highway/Bridge Highway Safety Systems $220,340 Summer 2010 $9,368
District 2 Intersection Epoxy Pavement Markings DOT Highway/Bridge Safety Marking $213,420 Underway $7,972
District 3 Intersection Epoxy Pavement Markings DOT Highway/Bridge Safety Marking $567,740 Summer 2010 $5,577
District 4 Intersection Epoxy Pavement Markings DOT Highway/Bridge Highway Safety Systems $237,740 Summer 2010 $5,756
East Lyme, Waterford and Montville I-395 Pavement Preservation DOT Highway/Bridge Empire Paving $4,134,146 Underway $2,817,586
Rocky Hill/Cromwell I-91 Pavement Preservation SB DOT Highway/Bridge American Industries $3,928,740 Underway $196,137
Various Interstate Epoxy Pavement Markings - I-95 N - District 2 DOT Highway/Bridge   $250,000 Summer 2010  
Various Non-interstate Crack Sealing - Districts 1 and 4 DOT Highway/Bridge   $545,000 Summer 2010  
Washington Replacement of Concrete Crib Regional MPO Highway/Bridge   $300,000 Summer 2010  
Various Installation of STC Traffic Signals - District 2 DOT Highway/Bridge   $650,000 Summer 2010  
Newington Rte 173 and Rte 529 Safety Improvements Regional MPO Highway/Bridge   $1,400,000 Summer 2010  
Various Installation of STC Traffic Signals - District 3 DOT Highway/Bridge   $1,100,000 Summer 2010  
Mansfield Bypass at Birch Rd and Cedar Swamp Rd Regional MPO Highway/Bridge   $141,000 Summer 2010  
Statewide Bus Procurement - 35' and 40' buses (37 diesel/31 hybrid) DOT Transit New Flyer $31,176,010 Underway $24,522,988 - combined bus expenditures
Statewide Bus Procurement - 60' articulated buses (25 diesel/6 hybrid) DOT Transit Nova $20,354,125 Underway $24,522,988 - combined bus expenditures
Statewide Bus Procurement - 45' commuter buses (33) DOT Transit MCI $17,312,559 Underway $24,522,988 - combined bus expenditures
Norwalk Transit Security Improvements - Pulse Point DOT Transit Waters Construction $1,500,000 Spring 2010  
Statewide Park and Ride Lot Improvements DOT Transit Empire Paving $2,237,778 Underway $4,111
Bridgeport Bus Engine Repowering DOT Transit Cummins Power $2,800,000 Underway  
Multiple Locations New Haven Line Improvements - Phase A DOT Transit Lawrence Bronoli $5,945,416 Underway $947,278
Multiple Locations New Haven Line Improvements - Phase B DOT Transit Rizzo Corporation $4,054,584 Underway  
Multiple Locations Danbury CTC DOT Transit Metro-North Railroad $30,000,000 Underway  
Branford Shoreline East RR Station Parking DOT Transit Guerrera Construction $5,400,000 Underway $1,615,901
New Haven Rail Yard Component Shop DOT Transit O&G Industries, Inc. $29,927,641 Summer 2010 $11,584,057
Norwich Norwich Public Utilities - Fairview Storage Tank - Storage tank repair & painting, pump station upgrades DPH Drinking Water Amstar of Western New York, Inc.; Electrical Energy System Corp. $750,000 Completed $78,872
Norwich Norwich Public Utilities - Richard Brown Dr. Storage Tank - Storage tank repair & painting, pump station upgrades DPH Drinking Water Amstar of Western New York, Inc. $750,000 Completed $296,637
Plainfield CTWC - Gallup Water Service - Harrington MHP interconnection DPH Drinking Water TBD $300,000 Completed $192,195
Ridgefield Barlow Mountian and Scotland Elementary School water main DPH Drinking Water Anthony Julian Railroad Construction Company, Inc $1,500,000 Underway  
Putnam Putnam Water Pollution Control Authority - Park Street well field DPH Drinking Water TBD $2,800,000 Underway $738,074
Brookfield Water main - Silvermine Road DPH Drinking Water TBD $1,706,184 Underway $1,167,442
East Lyme East Lyme Water & Sewer Commission - System-wide Chlorine Disinfection DPH Drinking Water C.H. Nickerson & Co $1,241,000 Underway $542,130
Tolland Water Department - Torrey Road DPH Drinking Water Catco Construction, LLC $175,000 Underway $145,480
Hartford MDC - Meter Systems DPH Drinking Water Itron, Inc. $5,950,000 Underway $5,168,136
Hartford MDC - Franklin Ave/George St. main DPH Drinking Water TBD $242,650 Underway  
Hartford MDC - Tower Avenue water main DPH Drinking Water TBD $597,666 Underway  
Woodbury Woodlake Tax District - New wells DPH Drinking Water TBD $495,650 Underway $334,203
Manchester Hercules Drive Booster Pump Station DPH Drinking Water TBD $750,000 Underway  
Rocky Hill Veterans' Home DPW/DVA Veterans' Affairs TBD $5,934,500 Final Design Phase  
Bridgeport Bullard Haven Vocational/Technical High School OPM/DPW State Energy Program TBD $192,449 Completed  
Farmington UConn Health Center - Kane Street - Lighting OPM/DPW State Energy Program TBD $150,856 Completed  
Farmington UConn Health Center - Munson Road - Lighting OPM/DPW State Energy Program   $536,042 Completed  
Hartford 410-470 Capitol Avenue OPM/DPW State Energy Program TBD $862,900 Underway  
Uncasville Uncas-on-Thames OPM/DPW State Energy Program TBD $264,006 Completed  
Hartford 25 Sigourney Street Garage OPM/DPW State Energy Program TBD $179,493 Completed  
Danbury Danbury Courthouse OPM/DPW State Energy Program TBD $320,000 Completed  
Danbury Western Connecticut State University - Litchfield Hall OPM/DPW State Energy Program TBD $79,884 Completed  
Milford Milford Courthouse OPM/DPW State Energy Program TBD $674,900 Underway  
Statewide Fish Hatcheries - Burlington/Kensington OPM/DPW State Energy Program TBD $16,993 Completed  
Hartford 165 Capitol Avenue - State Office Building OPM/DPW State Energy Program TBD $320,000 Summer 2010  
Hartford 79 Elm Street - DEP HQ OPM/DPW State Energy Program TBD $818,775 Underway  
Rocky Hill Old Main Street Pavement Rehabilitation Regional MPO Highway/Bridge J. Iapaluccio Inc. $1,952,000 Completed $1,154,748
Danbury Backus Avenue Bridge Replacement Regional MPO Highway/Bridge Hemlock Construction $504,686 Underway $8,567
New Fairfield Paving Town Park and Ride Lot for HART/Metro North Shuttle Regional MPO Highway/Bridge A&J Construction $220,000 Completed $204,368
Naugatuck Rubber Avenue Bridge Regional MPO Highway/Bridge Dayton Construction $1,168,891 Underway $11,762
Montville Old Colchester Road Bridge Repair Regional MPO Highway/Bridge Mastrobattisto $2,002,000 Underway $7,762
South Windsor Buckland Road Pavement Rehabilitation Regional MPO Highway/Bridge Tilcon Connecticut, Inc. $2,200,000 Completed $912,824
Berlin Paving/Reconstruction of Episcopal Road Regional MPO Highway/Bridge General Paving Construction $498,786 Completed $14,894
Manchester Slater Street Intersection Improvements Regional MPO Highway/Bridge NYCONN Corp. $270,000 Completed $3,751
Manchester Buckland Hills Drive/Hale Road Pavement Regional MPO Highway/Bridge Mather Corp. $3,410,000 Underway $102,341
Windsor   Day Hill Road Pavement Rehabilitation Regional MPO Highway/Bridge Spazzarini Construction $2,200,000 Completed $727,240
Middlebury Long Meadow Road Bridge Replacement Regional MPO Highway/Bridge Black and Warner $171,285 Underway $167,700
New Haven Reconstruction of Quinnipiac Avenue Regional MPO Highway/Bridge Empire Paving $7,300,000 Underway $30,676
New Haven Congress Avenue Pavement Rehabilitation Regional MPO Highway/Bridge TBD $843,700 Summer 2010  
Bethel Milling and Paving of Old Hawleyville Road Regional MPO Highway/Bridge A&J Construction $581,000 Summer 2010  
Bridgeport Pavement Rehabilitation of  Iranistan Ave. and Capitol Ave. Regional MPO Highway/Bridge Mark IV Construction $2,100,000 Summer 2010 $4,885
Bridgeport Congress Street Bridge demolition - phase 1 Regional MPO Highway/Bridge S&R Corporation $1,200,000 Underway $446,170
Barkhamsted Hillcrest Drive - cracksealing and overlay Regional MPO Highway/Bridge   $177,000   $557
Colebrook Riverton Road - crack sealing and chip seal Regional MPO Highway/Bridge All States Asphalt $126,000 Underway $511
Canton Farmington River Trail Phase III Regional MPO Highway/Bridge S. Carpenter Construction $2,200,000 Summer 2010 $45
Coventry Main St. Sidewalk, Paden Rd. to 1000’ North of Route 275 Regional MPO Highway/Bridge VMS Construction $663,000 Underway $293
Danbury Milling and Paving of White Street, Franklin Street, and Franklin Street Extension Regional MPO Highway/Bridge A&J Construction $2,175,000 Underway $2,461
Darien Pavement Resurfacing of Hollow Tree Ridge Road, West Ave., and Leroy Ave. Regional MPO Highway/Bridge Burns Construction $975,000 Underway  
Derby Milling and Overlay of Elizabeth Street Regional MPO Highway/Bridge Cocchiola Paving $650,000 Summer 2010 $944
East Hartford Pavement Rehabilitation of Portions of Main St. and School St. Regional MPO Highway/Bridge JSL Asphalt $2,260,000 Underway  
Fairfield Black Rock Turnpike intersection improvement at Commerce Drive Regional MPO Highway/Bridge   $1,125,000 Summer 2010  
Litchfield White Wood Road Overlay Regional MPO Highway/Bridge Waters Construction $165,000 Underway $446
Mansfield Paving of Mansfield City Road Regional MPO Highway/Bridge Tilcon Connecticut, Inc. $243,000 Underway  
Middletown Paving of Industrial Park Rd. Regional MPO Highway/Bridge American Industries $1,043,373 Summer 2010  
Monroe Cross Hill Rd. Strategic Paving Project Regional MPO Highway/Bridge   $1,050,000 Summer 2010  
Morris Crack Sealing and Microsurfacing of Alain White Road Regional MPO Highway/Bridge New England Asphalt Services $140,000 Summer 2010 $509
New Canaan Pavement Resurfacing of Old Norwalk Road, Farm Road, West Road, and Weed Road Regional MPO Highway/Bridge FGB Construction $975,000 Summer 2010  
New Hartford Crack Sealing and Microsurfacing of West Hill Road Regional MPO Highway/Bridge The Gorman Group $165,000 Summer 2010  
New Haven Rehabilitation of Quinnipiac Avenue- Phase 2, City of New Haven Regional MPO Highway/Bridge Laydon Industries $2,700,000 Summer 2010  
New Haven Traffic Control Signal Controllers Regional MPO Highway/Bridge Republic Intelligent Transportation Services $3,258,000 Summer 2010  
 New London  Montauk Ave. Improvements - Phase 1 Regional MPO Highway/Bridge Cherry Hill Construction $707,000 Underway  
New Milford Milling and Paving of Boardman Road and Grove St. Regional MPO Highway/Bridge Cocchiola Paving $918,000 Underway $1,289
Newtown Milling and Paving of Castle Hill Rd. full depth reclamation and paving of Castle Meadow Rd. Regional MPO Highway/Bridge A&J Construction $635,000 Summer 2010  
Norwalk Paving of Dr. Martin King Jr. Dr., Belden Hill Rd., Butler St., Harbor Ave. Regional MPO Highway/Bridge Empire Paving $1,901,000 Summer 2010  
Plainfield Route 12 sidewalks from SR 647 to School St. and from RR Avenue to Academy Hill Rd. Regional MPO Highway/Bridge New England Concrete Service $1,113,000 Underway $44,816
Plainville Reconstruction and Paving of Camp St. Regional MPO Highway/Bridge Red Technologies $439,000 Summer 2010  
Plymouth Mill and Overlay Harwington  Ave., Route 6 to Armbruster Rd. Regional MPO Highway/Bridge Cherry Hill Construction $307,000 Summer 2010 $1,417
Prospect Resurfacing of Straitsville Road Regional MPO Highway/Bridge   $311,000 Summer 2010  
Putnam Church St.Pavement Preservation Regional MPO Highway/Bridge   $654,000 Summer 2010  
Ridgefield Milling and Paving of Farmingville Rd. and Old Stagecoach Rd. Regional MPO Highway/Bridge Guerrera Construction $679,000 Summer 2010  
Scotland Station Road Bridge (Br. #4768) Repair Regional MPO Highway/Bridge Barr, Inc. $350,000 Underway $472
Seymour Pavement Rehabilitation of Derby Ave. Regional MPO Highway/Bridge   $650,000 Summer 2010  
Shelton Constitution Boulevard pavement rehabilitation Regional MPO Highway/Bridge   $650,000 Summer 2010  
Southington Mill and Overlay South End Rd. and Mount Vernon Rd. Regional MPO Highway/Bridge Quality Associates $1,039,000 Summer 2010  
Stratford Repaving Bruce Ave. Regional MPO Highway/Bridge Cherry Hill Construction $300,000 Summer 2010  
Torrington Mill and Overlay Litchfield St., Winthrop St., and Water St. Regional MPO Highway/Bridge Pierce Builders $1,173,000 Underway  
Trumbull Resurface Whitney Ave. Regional MPO Highway/Bridge Waters Construction $950,000 Summer 2010  
Waterford Intersection Improvements at Route 32, Lathrop Rd., and Maple Rd. Regional MPO Highway/Bridge Cherry Hill Construction $1,052,000 Underway $1,074
Watertown Resurfacing of French Street Regional MPO Highway/Bridge   $731,000 Summer 2010 $555
Westbrook Milling and Paving McVeagh Road from Route 153 to Pond Meadow Road Regional MPO Highway/Bridge Charles Pasteryak, Jr. $660,000 Underway  
Weston Old Hyde Raod Pavement Preservation Regional MPO Highway/Bridge A&J Construction $290,000 Underway $1,306
Winchester Wetmore Avenue Overlay Regional MPO Highway/Bridge Cherry Hill Construction $400,000 Summer 2010 $404
Ansonia Resurfacing of Ford St. and Beaver St. Regional MPO Highway/Bridge Cocchiola Paving $650,000 Summer 2010  
Brookfield Gray's Bridge Rd. Milling and Paving Regional MPO Highway/Bridge Cocchiola Paving $581,000 Summer 2010  
East Hampton Haddam Neck Rd. Resurfacing Regional MPO Highway/Bridge Charles Pasteryak, Jr. $236,000 Completed  
Enfield Post Office Rd. Reconstruction Regional MPO Highway/Bridge Spazzarini Construction $3,822,000 Underway  
Greenwich Pavement Reconstruction and Overlay of Field Point Rd., Dearfield Dr., Brookside Dr., West Elm St., Railroad Ave., Prospect St. and Horseneck Lane Regional MPO Highway/Bridge FGB Construction $1,300,000 Underway $10,955
Hartford Improvements on Park St. from Laurel St. to I-84/Pope Park Highway #4 Regional MPO Highway/Bridge   $3,770,000 Summer 2010  
Killingly Reconstruction of a Portion of Lake Road Regional MPO Highway/Bridge American Industries $559,000 Summer 2010 $310
New Britain Mill and Overlay Corbin Ave., East St., and Stanley St. Regional MPO Highway/Bridge Colossale Concrete $1,735,000 Underway  
Bristol Mix Street Reconstruction and Normalization of Intersection with Maltby Street Regional MPO Highway/Bridge Martin Laviero Construction $1,500,000 Underway  
Cheshire Paving of West Johnson Road Regional MPO Highway/Bridge Empire Paving $708,000 Summer 2010  
Cromwell Paving Geer St. Regional MPO Highway/Bridge Quality Associates $303,000 Summer 2010  
Durham Paving Maiden Lane Regional MPO Highway/Bridge Charles Pasteryak, Jr. $136,000 Summer 2010  
East Haddam Lake Shore Drive Paving Regional MPO Highway/Bridge   $81,000 Summer 2010  
Goshen Crack Sealing and Microsurfacing of Goshen East St./East St. North Regional MPO Highway/Bridge   $339,900 Summer 2010 $202
Groton Mystic Streetscape - Phase 2 Regional MPO Highway/Bridge Pettini Contracting Corporation $800,000 Summer 2010  
Groton Bridge Street Streetscape Regional MPO Highway/Bridge Empire Paving $1,530,000 Summer 2010  
Guilford Pavement Preservation of Stepstone Hill Rd. Regional MPO Highway/Bridge American Industries $548,000 Summer 2010  
Manchester Charter Oak Greenway Extension Regional MPO Enhancement King Construction $643,000 Summer 2010  
Middlefield Paving Various Locations Regional MPO Highway/Bridge New England Asphalt Services $100,829 Summer 2010  
North Canaan Membrane and Overlay Bridge #5207 Lower Rd. Regional MPO Highway/Bridge New England Infrastructure $337,000 Underway $667
Old Saybrook Route 1 Sidewalks Regional MPO Highway/Bridge Colossale Concrete $440,000 Summer 2010  
Oxford Resurfacing of Christian Street Regional MPO Highway/Bridge   $165,000 Summer 2010  
Portland Paving of Bartlett St., Collins Hill Rd., High St., and Jobs Pond Rd. Regional MPO Highway/Bridge New England Asphalt Services $235,000 Underway  
Pomfret Replace bridge over Mashamoquet Brook Regional MPO Highway/Bridge New England Infrastructure $763,000 Underway  
Roxbury Judds Bridge Painting Regional MPO Highway/Bridge   $233,000 Summer 2010  
Salisbury Routes 44 and 41, sidewalks and curbing Regional MPO Highway/Bridge Mather Corp. $394,000 Summer 2010  
Stamford Stamford Urban Transitway Regional MPO Transit        
Southbury Main St. South Pavement Preservation Regional MPO Highway/Bridge   $489,000 Summer 2010  
 Stonington  Mystic Streetscape Improvement Regional MPO Highway/Bridge GEG Construction $500,000 Underway  
Stratford Barnum Avenue Streetscape Project Regional MPO Highway/Bridge G, Pic and Sons Construction $1,500,000 Summer 2010  
Thomaston Pavement Rehabilitation of Old Northfield Road Regional MPO Highway/Bridge Empire Paving $171,000 Underway $276
Vernon Historic Talcottville Streetscape Regional MPO Enhancement VMS Construction $136,118 Underway  
Waterbury Sidewalk Improvements on Cooke St. Regional MPO Highway/Bridge J. Iapaluccio Inc. $4,046,000 Summer 2010 $412
Westport Resurface Cross Highway, Long Lots Road and Newtown Turnpike Regional MPO Highway/Bridge FGB Construction $975,000 Underway $34,794
Windham Paving of High Street, Valley St., and Jackson St. Regional MPO Highway/Bridge American Industries $575,000 Underway  
Wolcott Paving of Long Swamp Rd. Regional MPO Highway/Bridge Cocchiola Paving $495,000 Summer 2010  
 
 