Document Name |
# |
Type |
Date |
AMENDMENT TO CONTRACT |
213 |
F |
06/08/07 |
ARCHITECT'S CONTRACT FOR STUDIES |
205 |
F |
07/03/07 |
CA FOR DESIGN AND CONSTRUCTION PHASES |
258 |
F |
07/03/07 |
CA FOR DESIGN PHASE CONTRACT |
257 |
F |
07/03/07 |
COMMISSION LETTER ENERGY INCENTIVES |
264 |
F |
12/13/07 |
COMMISSION LETTER STANDARD |
265 |
F |
12/13/07 |
COMMISSION LETTER SURVEY AND BORINGS |
266 |
F |
12/13/07 |
CONSTRUCTION ADMINISTRATION |
214 |
F |
03/11/08 |
CONTRACT COMMISSION LETTER LOG |
267 |
F |
01/08/07 |
DPW CONTRACT ADMINISTRATION CONTRACT FORM |
200 |
F |
08/30/07 |
ON-CALL TASK LETTER DESIGN (revised) |
269 |
F |
05/20/09 |
|
273 |
F |
12/13/07 |
ON-CALL TASK LETTER ROOFING (revised) |
270 |
F |
05/20/09 |
ON-CALL TASK LETTER SPACE PLANNER |
271 |
F |
12/13/07 |
ON-CALL TASK LETTER STUDY |
275 |
F |
12/13/07 |
ON-CALL TASK LETTER THRESHOLD LIMIT |
272 |
F |
12/13/07 |
OPM GENERAL LETTER NO. 97-1 |
|
|
11/21/1996 |
PROPOSAL LETTER FROM FIRMS FOR ARCH TASK LETTERS (new) |
|
|
04/02/09 |
PROPOSAL LETTER FROM FIRMS FOR ENGINEER TASK LETTERS (new) |
|
|
04/03/09 |
|
260 |
F |
07/01/09 |
SPRB APPROVAL MEMO CONTRACT (new) |
261 |
F |
07/01/09 |
SPRB CONTRACT CHECKLIST |
263 |
L |
02/26/08 |
STANDARD FIXED-FEE ENGINEER |
203 |
F |
07/03/07 |
TERMS AND CONDITIONS ARCHITECT |
202 |
F |
05/03/07 |
|
|
|
|