Specifications and Standards |
Form 816/Form 817 (Standard Specifications) with Supplements
|
Standard Drawings
|
Plans, Policies, Regulations
|
Connecticut Bicycle and Pedestrian Plan
|
Connecticut State Rail Plan
|
Locally Coordinated Public Transit Human Services Transportation Plan
|
Long Range Transportation Plan
|
Strategic Highway Safety Plan
|
Transportation Infrastructure Capital Improvement Plan
|
Consultant Engineer’s General Memoranda
|
Procedure Manual for New or Revised Interstate Access Approval in Connecticut
|
Policy and Procedures for Property Maps
|
Public Service Facility Policy and Procedures for Highways
|
Office of State Traffic Administration Regulations
|
Engineering & Construction - Policy & Planning Directives
|
Environmental Review Request (ECPPD-2017-1)
Assignment of Coordinated Environmental Roles (ECPPD-2017-2)
|
Engineering & Construction - Policy & Planning Bulletins
|
Interagency Coordination Meeting Guidance (ECPPB-2017-1)
|
Engineering and Construction Directives
|
Framework for Guidance and Direction (2015-1-EC)
|
Consulting Engineer Staff Wage Rate Changes Cost Plus Fixed Fee Agreement (2015-2-EC)
|
Standard Specifications Committee and Specifications (2015-3-EC)
|
Alternative Project Delivery Advisory Committee (2015-4-EC)
|
Release of CAD Files (2015-5-EC) SUPERCEDED BY Electronic Engineering Data Delivery, Phase 1 (ECD-2017-4)
|
Proprietary Products in Construction Contracts (ECD-2016-1)
|
Plans-In-Hand Review (ECD-2016-2)
|
Online Stormwater Discharge Permit Registration System (ECD-2016-3)
|
Coding FHWA Participating and Non-Participating Costs (ECD-2016-4)
|
Minimum Daily Liquidated Damage Rates (ECD-2016-5)
|
Design Issue Procedure (ECD-2016-6)
|
Construction Contract Time Determination (ECD-2016-7)
|
Delegation of Authority (ECD-2016-8)
|
Use of All-Inclusive Drainage Items in Contract (ECD-2017-1)
|
Implementation of Smart Work Zones Guide (ECD-2017-2)
Conversion to Digital Contractor Submissions (ECD-2017-3)
Electronic Engineering Data Delivery, Phase 1 (ECD-2017-4)
Emergency Declaration Procedures (ECD-2018-1)
Penetrating Sealer Protective Compound (ECD-2018-2)
Revised Minimum Daily Liquidated Damage Rates (ECD-2019-1)
|
Engineering and Construction Bulletins |
Mileage Reimbursement Rate (ECB-2016-1)
|
Revised Special Provisions, Construction Field Office/Furnishings and Equipment (ECB-2016-2)
|
Implementation of Standard Specifications, Form 817 (ECB-2016-3)
|
Cost of Living Adjustments - Cost Plus Fixed Fee Consulting Engineer Agreements (ECB-2016-4)
|
Buy America Clarification and Guidance (ECB-2016-5)
|
Bituminous Concrete Specifications, Sections 4.06 and M.04 (ECB-2016-6)
|
Revised Special Provision Control and Removal of Invasive Vegetation (ECB-2017-1)
Membership Change, Alternative Project Delivery Advisory Committee (ECB-2017-3)
Channel Bottom Material Updates (ECB-2017-4)
Owned Special Provisions Sections 6.03 (Structural Steel) and M.06 (Metals) (ECB-2018-1)
New and Revised Interstate Access Approval (ECB-2018-2)
Electronic Engineering Data Delivery Extended Goal (ECB-2018-3)
Equipment Watch Access (ECB-2018-4)
Incidental Cost Percentages (2018) (ECB-2018-5)
Update of Stewardship Implementation Manual (May 2018) (ECB-2018-6)
Revised Bituminous Concrete Specifications, Sections 4.06 and M.04 (ECB-2018-7) Public Involvement for FHWA Categorical Exclusion Projects Quick Reference Guide (ECB-2018-8) (Updated 01/02/2019)
|
Engineering Directives
|
Development, Approval, and Use of Standard Sheets and Guide Sheets/Details (2015-1-E)
|
Revised Standard Sheets Issued (2015-2-E)
|
Revised Traffic Engineering Guide Sheets Available (2015-3-E)
|
Digital Review of Design Submissions (2015-4-E)
|
Use of "Safety and Public Convenience" Special Provision (2015-5-E)
|
State Funded Municipal Projects, Requirements for Right of Way Acquisitions (2015-6-E)
|
Use of "PDF Checker" Software (2015-7-E)
|
Design Phase Scheduling (2015-8-E)
|
Employee Expectations Meeting (ED-2016-1) SUPERCEDED BY Employee
Expectations Meeting (2018 Update) (ED-2018-2)
|
Advertising-Phase Activities (ED-2016-2)
|
Type D Portable Impact Attenuation System (ED-2016-3)
|
DBE Participation in Engineering Agreements (ED-2016-4)
|
Employee Time Record Keeping and Project Billings (ED-2016-5)
|
Consultant Design Administration Manual (ED-2016-6)
MASH Implementation: Additional Information, Phase One (ED-2017-1)
Storing Engineering Project Documents in Projectwise (ED-2017-2)
Consolidating Contract Plan Discipline Subsets (ED-2018-1)
Employee Expectations Meeting (2018 Update) (ED-2018-2)
Revised Connecticut Bicycle and Pedestrian Travel Needs Assessment Form (ED-2018-3)
Fencing at Bridges (ED-2018-4)
|
Engineering Bulletins
|
Revised Traffic Engineering Standard Sheets Issued (EB-2015-1)
|
Precipitation Frequency Estimates (EB-2015-2)
|
2016 Cost Estimating Guidelines (EB-2016-1)
|
Fiscal Year 2017 Local Bridge Program Manual (EB-2016-2)
|
Local Transportation Capital Improvement Program (LOTCIP) Guidelines (EB-2016-3)
|
Availability and Use of Bridge Load Rating Manual (EB-2016-4)
|
Change in Cutoff Time for Submitting Pre-Bid Questions through Web Page (EB-2016-5)
|
Update of Design-Phase Schedule Template (EB-2016-6)
|
Superpave Traffic Level Information in Contract Documents (EB-2016-7)
|
Revisions to the Bridge Inspection Manual (EB-2016-8)
|
2017 Cost Estimating Guidelines (EB-2017-1)
|
Revisions to Bridge Inspection Manual (May 2017) (EB-2017-2)
|
Interim Guidance: MASH Implementation, Roadside Barriers (EB-2017-3)
|
Revised Highway Standard Sheets Issued (June 2017) (EB-2017-4)
|
Revised Traffic Sheets Issued (June 2017) (EB-2017-5)
Accelerated Bridge Construction Decision Matrix (EB-2017-6)
Information Requirements, Environmental Compliance Task 100 Reports (EB-2018-1)
Revised Bridge Load Rating Manual (EB-2018-2)
Revised Traffic Guide Sheets (EB-2018-3)
Revised Traffic Standard Sheets Issued (EB-2018-4)
Process for Obtaining a Waiver of Right-Of-Way (ROW) Activities (EB-2018-5)
Revised Highway Standard & Guide Sheets Issued (EB-2019-1) |
Construction Directives |
Construction Procedure for Internal use of Electronic Signatures (CD-2016-1)
|
Work Zone Safety, Rolling Road Block Procedure (CD-2016-2)
|
Reporting on Project Milestones and Key Dates (CD-2016-3)
|
Task-Based Consultant Services, Construction Engineering Inspection (CD-2016-4)
|
Construction Division Use of Projectwise for Storage of Project Documents (CD-2016-5)
|
Project Summary Reports (CD-2016-6)
|
Construction Employee Time Record Keeping and Project Billings (CD-2017-1)
|
Construction Manual Update/Version 3.0 January 2017 (CD-2017-2)
|
Revised Contractor Performance Evaluation Form and Guide (2017) (CD-2017-3)
|
Construction Engineering and Inspection Pamphlet for Consultant Engineers, Feb. 2017 Edition (CD-2017-4)
|
Revised Construction Order Processing and Documentation Requirements for FTA-Funded Projects (CD-2017-5)
Project Modifications and Contingency Management (CD-2017-6)
ProjectWise Credential Requests for Construction Engineering and Inspection (CEI) Consultants (CD-2017-7)
Consultant Solicitation Request for the Office of Construction (CD-2017-8)
Policies and Procedures for the Acquisition and Management of CTDOT-Purchased Computing Devices (CD-2017-9)
Construction Division Procedures for the Use of Electronic and Digital Signatures (CD-2017-10)
Overtime Use and Approval (CD-2018-1)
Construction Division Procedures for the Use of Electronic and Digital Signatures (CD-2018-2)
|
Construction Bulletins |
Revisions to Extension of Time Approval Memorandum (CB-2016-1)
|
eConstruction (CB-2016-2)
|
Field Office Device Order Form and Field Office Date line Setup Form (CB-2016-3)
|
2015 OOC Performance Record (CB-2016-4)
|
Revised Construction Site Environmental Inspection Report (CB-2016-5)
|
Guidance for the Visual Inspection of Foreign Steel (CB-2017-1)
New CLA-12 - Request to Subcontract Form (Rev 07-2018) (CB-2018-1)
Post Construction Reviews (PCRs) – Updated Guidance (CB-2018-2)
|
Manuals
|
Bridge Design Manual
|
Bridge Inspection Manual
|
Bridge Load Rating Manual
|
Construction Contract Bidding & Award Manual
|
Consultant Design Administration Manual
|
Digital Project Development Manual
|
Drainage Manual
|
Geotechnical Manual
|
Highway Design Manual
|
Local Bridge Program Manual
|
Location Survey Manual
|
Professional Services, Consultant Selection Procedures Manual
|
Public Involvement Guidance Manual
|
Stormwater Quality Manual
|
Traffic Control Signal Design Manual
|
Utility Accommodation Manual
|
Guides
|
Constructability Review Program
|
Cost Estimating Guidelines
|
Digital Design Environment Guide
|
Guidelines, Advertising-Phase Activities
|
Guidelines for Soil Erosion and Sediment Control
|
Guidelines for the New Local Transportation Capital Improvement Program
|
InRoads V8i Guide
|
Price Adjustment (Asphalt, Fuel) Guidance
|
Programmatic Agreement for Certain Categorical Exclusions and Fact Sheet rev. September 2015
|
Project Development Guide
|
Public Involvement Procedures
|
Value Engineering Program
Public Involvement for FHWA Categorical Exclusions Quick Reference Guide
|
Other Information
|
AASHTOWare Product information
|
Collision Analysis System Reports
|
Connecticut Coordinate System
|
Consulting Engineer General Memoranda
|
Department District Boundaries (Map)
|
Functional Classification Maps
|
Highway Log
|
Maps (Transportation Related)
|
National Highway System (Connecticut) Map
|
Pavement-related Documents
|
Performance Measures (Department)
|
Posted Speeds, Town Roads
|
Qualified Product List
|
Roadside Safety
|
Specifications for Aerial Photography and Photogrammetric Mapping
Stewardship Agreement (Joint Stewardship & Oversight Agreement)
|
|
Traffic Engineering Special Provisions
|
Traffic Log (Volumes on State Maintained Highway Network)
|