Request to Waiver CON Requirements for the Replacement of an Existing 1.5 Tesla Strength MRI Scanner with a 1.5 Tesla-Strength MRI Scanner in Southbury
Date:
October 28, 2009
Summary:
Diagnostic Imaging of Southbury, LLC’s request for waiver has been Approved.
Request to Waive CON Requirements for the Replacement of an Existing Mobile-Based, 1.0 Tesla-Strength MRI Scanner with a Fixed-Based, 1.5 Tesla-Strength MRI Scanner in Southbury.
Date:
October 28, 2009
Summary:
Housatonic Valley Radiological Associates, P.C’s request for waiver has been Approved.
Applicant:
Greenwich Radiological Group, PC and Greenwich Radiology Partners, LLC
A request to Establish and Operate Methadone Maintenance and Ambulatory Detoxification Programs for Substance Abuse in Windsor.
Date:
October 27, 2009
Summary:
Windsor Dispensary Clinic, Inc.’s request to establish and operate methadone maintenance and ambulatory detoxification programs has not been approved and a Certificate of Need has been DENIED.
Establish Three Imaging Operating Rooms: One Room with and Intraoperative Magnetic Resonance Imaging Scanner; a Second Room with Biplane Angiography Equipment; and a Third Room with Single-plane Robotic Angiography Equipment.
Date:
October 19, 2009
Summary:
Yale-NewHavenHospital’s request to establish three imaging operating rooms has been approved and a Certificate of Need has been GRANTED.
Proposal to combine the GE LightSpeed CT unit and the GE Advance PET unit into the integrated Discovery LS PET/CT.
Date:
October 21, 2009
Summary:
Robert D. Russo M.D. & Associates Radiology P.C.'s proposal to combine the GE LightSpeed CT unit and the GE PET unit as an integrated PET/CT unit is hereby approved.
A request to modify the CON authorized under Docket Number 08-31262-CON requesting that OHCA vacate Condition #3 from the Agreed Settlement in order to allow the Hospital to continue to operate the existing Linear Accelerator after the new unit is operational.
Date:
September 15, 2009
Summary:
MiddlesexHospital’s request for a modification of a previous authorized Certificate of Need under Docket Number 08-31662 has not been Approved.
Applicant:
HealthCenter Imaging of FairfieldCounty, LLC d/b/a HealthCenter Imaging
A Request to modify Docket Number 02-545 under which OHCA authorized a Certificate of Need for the establishment of a dedicated cardiac PET-CT imaging center in Trumbull, Connecticut.
Date:
September 15, 2009
Summary:
HealthCenter Imaging of FairfieldCounty, LLC d/b/a HealthCenter Imaging’s request for a modification of a previous authorized Certificate of Need under Docket Number 02-545 has not been Approved.
Proposal to Establish a Fixed-Based PET/CT Service from a Mobile-Based PET/CT Service that will be Located at the Norwalk Radiology and MammographyCenter in Norwalk, CT.
Date:
September 3, 2009
Summary:
NorwalkHospital’s request to establish a Fixed-Based PET/CT Services has been approved and a Certificate of Need has been GRANTED.
Applicant:
David C. Goyette, Current Owner, d/b/a VernonWalk-InMedicalCareCenter
Change of Ownership of VernonWalk-InMedicalCareCenter.
Date:
August 27, 2009
Summary:
David C. Goyette, Current Owner, d/b/a VernonWalk-InMedicalCareCenter's request for change in ownership has been approved and a Certificate of Need has been GRANTED.
Request to Waive CON Requirements for the Replacement of an Existing 0.23 Tesla-Strength Open MRI Scanner with a New 0.70 Tesla-Strength Open MRI Scanner in Milford.
Date:
August 25, 2009
Summary:
S.B.D.I. Holding LLC, d/b/a Diagnostic Imaging of Milford’s request for waiver of CON requirements has been Approved.
Request to Waive CON Requirements for the Replacement of an Existing 0.3 Tesla Strength MRI Scanner with a New 1.5 Tesla-Strength MRI Scanner in Orange.
Date:
August 25, 2009
Summary:
Advanced Radiology Consultants, LLC’s request for waiver of CON requirements has been Approved.
Request to Waive CON Requirements for the Replacement of an Existing 0.7 Tesla Strength Open MRI Scanner with a New 1l5 Tesla-Strength MRI Scanner in Hamden.
Date:
August 25, 2009
Summary:
Southern Connecticut Imaging Centers, LLC’s request for waiver of CON requirements has been Approved.
Request to Waive CON Requirements for the Replacement of an Existing 1.0 Tesla-Strenght Closed MRI Scanner with a New 1.5 Tesla-Strength Closed MRI Scanner in Enfield.
Date:
August 24, 2009
Summary:
Radiology Associates of Hartford, PC request for waiver of CON requirements has been Approved.
A request to modify a previous Certificate of Need authorization in order to extend the CON expiration date from July 15, 2009 to July 15, 2010
Date:
August 6, 2009
Summary:
Yale-New Haven Hospital’s request to modify a previous Certificate of Need authorized under 08-31082 has been approved and a modification has been GRANTED.
Request to Waive CON requirements for the Replacement of an Existing 0.7 Tesla-Strength Open MRI Scanner with a New 1.2 Tesla-Strength Open MRI Scanner in Southington.
Date:
August 6, 2009
Summary:
The Hospital of Central Connecticut’s request for waiver has been Approved.
Request to Waive CON Requirements for the replacement of an Existing 1.0 Tesla Strength Extremity MRI Scanner with a 1l5 Tesla-Strength Full Body MRI Scanner in Hamden
Date:
July 21, 2009
Summary:
Connecticut Orthopaedic Specialists, PC’s request meets the requirements for waiver of the CON process and has been APPROVED.
Applicant:
GreenwichHospital and GreenwichEndoscopyCenter, LLC
GreenwichHospital and GreenwichEndoscopyCenter, LLC’s request for a modification of the Certificate of Need authorization issued under Docket Number 06-30864-CON, as was previously modified for a time extension under Docket Number 08-30864-MDF and 08-30864-MD2 The termination of services by GreenwichHospital at The Endoscopy Center of Greenwich Hospital and for the establishment and operation of
a freestanding gastroenterology center by GreenwichEndoscopyCenter, LLC
.
Date:
July 17, 2009
Summary:
GreenwichHospital and GreenwichEndoscopyCenter, LLC’s request for modification of a previous CON authorized under Docket Number 06-30864-CON has not been approved and modification has been DENIED
A request to modify Docket Number 06-30828-CON in order to increase the authorized capital expenditure
Date:
July 16, 2009
Summary:
The StamfordHospital’s request for modification of a previous CON authorized under Docket Number 06-30828-CON has been approved and modification has been GRANTED.
Acquisition and Operation of a Fonar Upright Magnetic Resonance Imaging (MRI) Scanner in Farmington, CT.
Date:
July 9, 2009
Summary:
Capitol Upright MRI, LLC’s request for the Acquisition and Operation of a Fonar Upright MRI Scanner has not been approved and a Certificate of Need has been DENIED.
Establishment of Multi-Specialty Rehabilitation Outpatient Clinic in Norwalk
Date:
June 29, 2009
Summary:
Forme’ Rehabilitation of Connecticut, Inc.’s request to establish a multi-specialty rehabilitation outpatient clinic in Norwalk has not been approved and a Certificate of Need has been DENIED.
Applicant:
Jeffrey T. Koslowski, D.D.S. d/b/a Koslowski Orthodontics, P.C.
Purchase of an Existing Radiation Therapy Practice and Acquisition of a Replacement Linear Accelerator to Establish a Hospital Satellite Radiation Therapy Facility in Trumbull.
Date:
June 25, 2009
Summary:
BridgeportHospital’s request has been approved and a Certificate of Need has been GRANTED.
Establish an Elective Angioplasty and Open Heart Surgery Program at StamfordHospital
Date:
June 11, 2009
Summary:
The StamfordHospital’s request for modification of a previous CON authorized under Docket Number 04-30374-CON, as previously modified by Docket Number 07-30374-MDF has been approved and a modification has been GRANTED.
Applicant:
GreenwichHospital and GreenwichAmbulatorySurgeryCenter, LLC
A request to modify a previous Certificate of Need authorization in order to increase the authorized capital cost, by $1,503,990 from $8,552,992 to $10,056,982
Date:
June 11, 2009
Summary:
GreenwichHospital and GreenwichAmbulatorySurgeryCenter, LLC’s request for modification of a previous CON authorized under Docket Number 06-30813-CON has been approved and a modification has been GRANTED.
Applicant:
Meriden Imaging Center, Inc. d/b/a Radiology Associates, Inc.
Acquisition of a 16-Slice CT Scanner in Wallingford.
Date:
June 9, 2009
Summary:
Meriden Imaging Center, Inc., d/b/a Radiology Associates, Inc.’s request to acquire a 16-slice computed tomography (“CT”) scanner to replace an existing 4-slice CT scanner in Wallingford has been approved and a Certificate of Need has been GRANTED.
A request to modify a previous Certificate of Need authorization in order to extend the CON expiration date by one year to December 1, 2010.
Date:
June 4, 2009
Summary:
GreenwichHospital’s request for a modification of a previous CON authorized under Docket Number: 07-31057 has been approved and Modification has been GRANTED.
A modification of a previous Certificate of Need authorization in order to allow the Applicant to enter into a contractual arrangement with The Charlotte Hungerford Hospital for CHH to utilize COH’s existing position emission tomography scanner one day a week until December 31, 2009.
Date:
June 5, 2009
Summary:
Connecticut Oncology & Hematology, LLP’s request for a modification of a previous CON authorized under Docket Number 05-30510-CON has been approved and modification has been GRANTED.
A request to modify a previous Certificate of Need authorization in order to extend the CON expiration date and to increase the authorized capital expenditure.
Date:
May 28, 2009
Summary:
Lawrence and MemorialHospital’s request to modify a previous Certificate of Need authorized under 06-30742-CON has been approved and Modifications to conditions #1, #2 and #3 have been GRANTED.
Acquisition of a Second Linear Accelerator with Image-Guided Radiation Therapy at MiddlesexHospital
Date:
May 12, 2009
Summary:
MiddlesexHospital’s request has been modified, denying their request for an additional linear accelerator and approving a replacement of the existing linear accelerator by an AGREED SETTLEMENT.
Change in Ownership of Mountainside Foundation, Inc., Owner and Operator of Mountainside Lodge, an Inpatient Substance Abuse Treatment Facility, to Artemis Partners, LLC.
Date:
May 18, 2009
Summary:
Mountainside Foundation, Inc. d/b/a Mountainside Lodge and Artemis Partners, LLC d/b/a Artemis Partners request for change in ownership has been approved and a Certificate of Need has been GRANTED.
Proposal to Acquires a Philips Brilliance 16-Slice CT Scanner to Replace an Existing Single-slice Philips PQ-2000.
Date:
May 18, 2009
Summary:
Saint Mary’s Hospital’s request to acquire a Philips Brilliance CT Scanner to Replace an Existing Scanner has been approved and a Certificate of Need has been GRANTED.
Terminate Psychiatric Services at the Behavioral Health Outpatient Clinic in Avon
Date:
May 18, 2009
Summary:
The Jewish Family Services of Greater Hartford Request to Terminate Psychiatric Services in Avon has been Approved and a Certificate of Need has been GRANTED.
Request to Waive CON Requirements for the Replacement of an Existing 4-Slice CT Scanner with a 32-Slice CT Scanner in New Britain
Date:
May 11, 2009
Summary:
The Hospital of Central Connecticut meets the requirements for wavier of the CON process for the Replacement of an Existing Scanner and Certificate of Need has been GRANTED.