ConnDOT: Bridge Standard Practices
Bridges and Facilities

Bridge Standard Practices


Accelerated Bridge Construction (ABC) Decision Process 
 
The Accelerated Bridge Construction (ABC) Decision process is used to assess the viability of
accelerated bridge construction methodology during the preliminary design phase of all projects involving bridge deck replacement, superstructure replacement or entire bridge replacement.  The results of the accelerated bridge construction assessment for any project should not be considered to be absolute as other factors not included in the decision matrix may be significant. However, accelerated bridge construction design  methodology should be very strongly considered where the results of the analysis are favorable for accelerated bridge construction.  It is anticipated that the ABC decision process will be updated from time to time as the Departmentís experience grows in this relatively new construction methodology.




Content Last Modified on 12/29/2016 3:40:09 PM