The project consists of the complete replacement of all existing pavement markings on several interstate routes throughout the state. The project is one of several projects awarded to multiple contractors for the replacement of pavement markings throughout the state on both interstate and secondary roadways. Many of the edge/shoulder lines and skip lines being replaced will be recessed into a machined groove to increase visibility during all weather conditions and to extend the service life of the markings. This project covers the following areas: Interstate 84 both directions from Southington to Union Interstate 91 both directions from Meriden to East Windsor Interstate 291 in Windsor and Manchester Interstate 691 in Cheshire DOT Project no. 0171-0361 was awarded to Safety Markings Inc. at a cost of $1,974,470.00 on April 19, 2013 and is scheduled to be completed in May 2014 LANE CLOSURE INFO The majority of the work will be performed at night and will be a moving operation with intermittent closures of lanes and portions of ramps to complete the work. Please use caution around this operation as these vehicles will be moving slower than posted speeds and when possible move over to provide them a buffer lane during work activity. |
2800 Berlin Turnpike, Newington, CT 06111 / Phone: 860-594-2000 Home | CT.gov Home | Send Feedback | Login | Register State of Connecticut Disclaimer, Privacy Policy, and Web Site Accessibility Policy. Copyright © 2002-2018 State of Connecticut. |
![]() |