DEP: Wastewater Discharges Fact Sheet
CT.GOV
Connecticut Department of Environmental Protection
/DEP Website

Permits & Licenses
Air, Waste, Water and Land Use
Professional & Occupational
Recreational & Natural Resources
Compliance Assistance
Enforcement
Laws & Regulations
Permits & Licenses Main Page
DEP Main Menu
{ }

Haitian Relief Effort

Department of
Environmental Protection
79 Elm Street
Hartford, CT 06106-5127
 
Phone:
(860) 424-3000
Voice/TTY
 
 

{e-Alerts}
Receive DEP news updates by e-mail.
Subscribe now or update your e-Alerts

{Login}

Wastewater Discharges
An Environmental Permitting Fact Sheet

Program Overview

This permit program, administered by the Bureau of Waste Management and Compliance Assurance Permitting Division, regulates discharges to waters of the state, including all surface waters, ground waters and Publicly Owned Treatment Works (POTW) (i.e., sewage treatment plants).

DEP uses both individual and general permits to regulate discharge activities. Individual permits are issued directly to an applicant, whereas general permits are permits issued to authorize similar minor activities by one or more applicants. Authorization of an activity under a general permit is governed by that general permit. Since the general permit process may be quicker and less costly, be sure to check the List of General Permits fact sheet (DEP-FS-004) in order to determine whether any of your discharges may be eligible for authorization under a general permit before applying for an individual permit. Other short processes such as Emergency and Temporary Authorizations may apply to your proposed activity. Consult the Short Permit Processes fact sheet (DEP-FS-003) or call our Permitting staff at 860-424-3018 for further information.

DEP issues discharge permits in three major categories. While the process for each is similar, specific application requirements may vary.

  • The Surface Water Discharge Permit Program, also known as the National Pollutant Discharge Elimination System (NPDES) under federal law, regulates discharges into surface waters (either directly or through municipal storm sewer drainage systems, or through other drainage systems such as wetlands or swales).

  • The Ground Water Discharge Permit Program regulates discharges to ground water from any source, including but not limited to large septic systems, agricultural waste management systems, and all waste landfills.

  • The Pre-treatment Permit Program regulates discharges to a POTW, through municipal sanitary sewer drainage systems, or through combined storm and sanitary sewer systems. All wastewaters (excluding domestic sewage) that are hauled directly to a POTW will require either a pre-treatment permit or will be regulated under the POTW's permit. Domestic sewage hauled directly to a POTW is regulated by the CT Department of Public Health.

In making a decision on a permit application, DEP must determine that the proposed discharges will not cause pollution to the waters of the state. In doing this, staff review the potential for: 1) any adverse effects on existing and designated uses of the waters of the state as defined in Connecticut's Water Quality Standards and Criteria; 2) any interference with or adverse effects upon the operation of a POTW; and 3) any systems and methodologies proposed to counteract such adverse effects and to minimize the discharge of pollutants.

Authorizing Statutes

Sections 22a-416 through 22a-438 of the Connecticut General Statutes (CGS)

Regulations

Sections 22a-430-1 through 22a-430-7 of the Regulations of Connecticut State Agencies (RCSA)

Who Must Apply

Any person or municipality that discharges water, substances, or materials into the waters of the state is required to obtain a permit prior to commencing the discharge. Waters of the state include all surface and ground waters, sanitary and storm sewers. Subsurface discharges of domestic sewage which are not community sewer systems and which have a volume of less than 5,000 gallons per day (gpd) are regulated solely by local health departments in accordance with the Connecticut Department of Public Health.

Required Application
Documents

Permit Application for Wastewater Discharges (DEP-PED-APP-100), including supporting documents such as a USGS topographic quadrangle map (8 ½" x 11" copy or original), Site Plans, Operation and Maintenance Plans of a Treatment System, Spill Control Plans, Description and Plans of Collection and Treatment Facilities, Discharge Analyses; Permit Application Transmittal Form (DEP-APP-001); Applicant Compliance Information (DEP-APP-002);  and all other attachments required for your specific application.

Fees

Fees are based on wastewater categories and the volume of wastewater discharged. See sections 22a-430-6 and 22a-430-7 RCSA for the schedule of wastewater categories and the associated fees based on the volume of wastewater discharged.

An initial application fee of $1300.00 is required with each application for an individual permit. The balance of the fee is calculated and billed upon completion of the preliminary review of the application.

Review and Processing

Upon receipt of the application package, the initial application fee and, if applicable, the certified copy of the Notice of Application, a preliminary review of the application is conducted for sufficiency and general consistency with applicable standards and criteria. The permit fee for the proposed activity is calculated and any balance due is billed. A detailed technical review is conducted to determine the extent of any adverse impacts on the waters of the state, including any adverse impacts upon the operation of a POTW. This review will include consideration of any treatment systems or other control technology proposed to counteract or mitigate any adverse impacts. Upon completion of this technical review, a tentative determination to grant or deny the permit application will be made by the Commissioner. Where applicable, a Notice of Tentative Determination will be published in a newspaper having general circulation in the affected area and public comments will be solicited on the tentative determination. In some cases, a public hearing may be held. After completion of the technical review and consideration of any public comments and subsequent to the close of any hearing, DEP will issue a final decision on the permit application. Should the applicant receive a final decision from DEP to grant the permit, DEP will require final construction plans and specifications for any collection and/or treatment system to be submitted for approval prior to initiating construction and/or any discharges.

Unique Processing Features

For discharges to surface water, an applicant will be required to conduct a Discharge Toxicity Evaluation (DTE).

For discharges to a POTW, an applicant may be required to receive prior approval from the affected POTW. For large discharges to a POTW an applicant may be required to assess the hydraulic, organic and toxic loading impacts upon the affected POTW.

For discharges of domestic sewage to ground water from land treatment systems, site testing is required prior to submission of an application.

For discharges to ground water, an applicant will be required to evaluate the hydraulic characteristics of the site.

On a case by case basis, the application may be subject to additional review by DEP's Fisheries Division. If the project has the potential to impact any endangered or threatened species, or species of special concern, or their essential habitats, the application will require additional review by the staff of the Natural Diversity Data Base program. Other specific information may be required for certain discharge categories.

Public Participation

The applicant is responsible for publishing a Notice of Application when the application is submitted to DEP. Once this notice is published, the applicant must send a copy of the notice to the Chief Elected Official of the municipality in which the regulated activity is proposed, and send a copy of the notice, along with the Certification of Notice Form – Notice of Application (DEP-APP-005A), to DEP. After the technical review, DEP will publish Notice of the Tentative Determination to grant or deny the permit (These public notices are not required for certain minor discharges. See exemptions from public notice in RCSA Section 22a-430-2(b)). After this notice, a thirty day comment period is provided where written comments may be submitted and a public hearing may be requested. A hearing will be held upon receipt of a petition signed by at least twenty-five persons and may also be held at DEP's initiative.

DEP may require an applicant to post a sign on the site or to provide any other reasonable form of notice necessary to apprise the public and abutting landowners of the proposed activity.

Average Processing Time

Preliminary Sufficiency Determination
Secondary Sufficiency Determination
Tentative Determination

60 days
30 days
120-180 days

Permit Duration

Most discharge permits expire after a five year period. For some discharges, DEP may issue a permit valid for a period of up to ten years. To renew a permit, the permittee must submit a sufficient renewal application at least 180 days prior to the permit expiration date.

Modifications

A permittee must notify DEP of a facility or process modification prior to implementing such change and either receive written notification from DEP indicating that permit modification is unnecessary, or obtain a permit modification in accordance with regulatory requirements.

Transfer

A permit may not be transferred without prior written approval from DEP. To request a permit transfer, a Permit Transfer Form (DEP-APP-006) must be submitted, with all required supporting documents, thirty days prior to the proposed transfer.

Contact Information

PERMITTING AND ENFORCEMENT DIVISION
BUREAU OF MATERIALS MANAGEMENT AND COMPLIANCE ASSURANCE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
79 ELM STREET
HARTFORD, CT 06106-5127

860-424-3018

This overview is designed to answer general questions and provide basic information. You should refer to the appropriate statutes and regulations for the specific regulatory language of the different permit programs. This document should not be relied upon to determine whether or not an environmental permit is required. It is your responsibility to obtain and comply with all required permits.

Fact Sheet DEP-PED-FS-100
Content Last Updated October, 2009

Users Guide to Environmental Permits








Home | CT.gov Home | Send Feedback

State of Connecticut Disclaimer and Privacy Policy.  Additional DEP Disclaimer
Copyright © 2002, 2003, 2004, 2005, 2006, 2007, 2008
and 2009 State of Connecticut.