DEEP: Beach Pond Boat Launch

Beach Pond Boat Launch
Voluntown

A 2 foot drawdown will commence on or about October 30, 2017; During this time, the boat launch area may be shallow. The lake is scheduled to be refilled by April 2, 2018.
However, there is always a risk that refilling may not be achieved by the target date due to unusually dry weather conditions.
 
{A view from the Beach Pond boat launch.}

Site Sketch of the Beach Pond Boat Launch (PDF)

Type: Trailered
Season: Year round
Address: 205 North Shore Road, Voluntown
Directions: On north side of pond. Route 165, north on Forge Hill Road, right on North Shore Road to the launch.
Lake Area: 393.3 Acres
Regulations: No water-skiing within 800 feet of the dam.
Docks: None
Toilets: Chemical (Seasonal)
Parking Spaces: 25
Parking Surface: Paved
Access Road Surface: Paved
Ramp Surface: Concrete Plank
ADA Accessible: No
Additional Info:
Schedule of Marine Events and Fishing Tournaments (Note: tournaments are not open to the general public)

Boat Launches in Connecticut

Content Last Updated on October 26, 2017.