| Federal Citation |
SIP Revisions |
Support Documents |
Status |
| Clean Air Act, Sec. 110 (a) (1) & (2) |
Infrastructure SIP Revision for the 2010 NO2 NAAQS |
Final SIP Submittal |
Submitted to EPA January 2, 2013 |
| Clean Air Act, Sec. 110 (a) (1) & (2) |
Infrastructure SIP Revision for the 2008 Ozone NAAQS |
Final SIP Submittal |
EPA Completeness Determination |
| 40 CFR 51 |
Repeal of two Air Quality Regulations |
SIP Revision |
Submitted to EPA November 21, 2012 |
| Clean Air Act Section 183 |
Reasonably Available Control Technology Update |
Control Measures Guidance Documents |
Submitted to EPA November 21, 2012 |
| Clean Air Act, Sec. 110 (a) (1) & (2) |
EPA PM2.5 Infrastructure SIP Approval |
Federal Register Notice |
Conditional Approval
October 16, 2012 |
| Clean Air Act, Sec. 110 (a) (1) & (2) |
NSR SIP revision with regard to PM2.5 |
Letter to EPA with NSR Revisions |
Submitted to EPA
October 9, 2012 |
| 50 CFR Part 51.102 |
|
|
Submitted to EPA November 1, 2012 |
| Clean Air Act Sections 107(d)(3)(E) and 175A |
Fine Particulate Matter (PM2.5) Redesignation Request and Maintenance SIP |
Information provided within SIP Revision link to the left |
Submitted to EPA
June 22, 2012 |
|
40 CFR 51.102 &
R.C.S.A. Sec. 22a-174-22 & 32 |
Final Submission NOx & VOC Orders |
Submission Package (PDF) |
Submitted to EPA
November 23, 2011 |
| Clean Air Act Section 110(a)(1) and (2) |
Adequacy Determination of the Connecticut State Implementation Plan with Regard to for the 2008 Lead NAAQS (PDF) |
Information provided within SIP Revision link to the left |
Submitted to EPA October 14, 2011 |
| 40 CFR 51.308(b) & (e) |
|
|
Submitted to EPA November 18, 2009 |
| EPA Control Techniques Guidelines |
|
Control Measures Guidance Documents |
Submitted to EPA April 29, 2010 |
|
Clean Air Act, Sec. 172(c) & 110 (a)(1)&(2) |
|
Information provided within SIP Revision link to the left |
Submitted to EPA November 18, 2008
|
|
Clean Air Act, Sec. 110 (a)(1)&(2) |
|
Information provided within SIP Revision link to the left |
October 23, 2008 |
| Clean Air Act, Sec. 172 (c) & 182(a)(3) |
2002 Periodic Ozone and Carbon Monoxide Emissions Inventory (PDF, 4.1 MB) |
Information provided within SIP Revision link to the left |
Submitted to EPA February 1, 2008 |
| Clean Air Act, Sec. 172 (b) & 182(b) |
8-hour Ozone Attainment Demonstration |
Information provided within SIP Revision link to the left |
Submitted to EPA February 1, 2008 |
| Clean Air Act, Sec. 110 (a) (1) & (2) |
Program Infrastructure Adequacy Determination (of the CT SIP for the 8-Hr Ozone NAAQS) (PDF) |
Information provided within SIP Revision link to the left |
|
|
40 CFR 51 Subpart S |
Final 2007 Inspection and Maintenance Program SIP Revision (PDF, 14 MB) |
Information provided within SIP Revision link to the left |
|
|
40 CFR
51.123(a)(2) & (ee) |
(PDF, 8.22 MB)
|
|
|
| Clean Air Act, Sec. 110(a)(2)(D) |
Transport SIP Revision |
|
|
| 69 FR 40028 & 70 FR 24280 |
Final Early PM2.5 Transportation Conformity Emission Budgets SIP Revision (PDF) |
(PDF) |
|
|
40 CFR 51.102 &
R.C.S.A. Sec. 22a-174-32 |
Final Submission VOC RACT Orders |
Submission Package (PDF, 239MB) |
Submitted to EPA
June 23, 2007 |
|
40 CFR 51.102 |
CT- NOx and VOC RACT |
|
Submitted to EPA December 8, 2006 |
|
40 CFR 51.102 |
CT- Revisions to Record Keeping, Monitoring and Visible Emissions Rule |
|
Submitted to EPA December 1, 2004 |
|
40 CFR 51.102 |
CT- Single Source NOx Credits for RACT |
|
Submitted to EPA December 2, 2002 |