Connecticut Siting Council
Oct 27, 2016

Energy/telecommunications meeting in New Britain

DATE:             October 20, 2016

TO:                  Council Members

FROM:             Robert Stein, Chairman

RE:                   Connecticut Siting Council Energy/Telecommunications Meeting

 

An Energy/Telecommunications meeting of the Connecticut Siting Council will be held on October 27, 2016 at 1:00 p.m. in Hearing Room Two, Ten Franklin Square, New Britain, Connecticut.

AGENDA

 

1.       Minutes of October 13, 2016

2.       DOCKET NO. 466 - The Connecticut Light & Power Company d/b/a Eversource Energy Certificate of Environmental Compatibility and Public Need for the Frost Bridge to Campville 115-kilovolt (kV) electric transmission line project that traverses the municipalities of Watertown, Thomaston, Litchfield, and Harwinton, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 10.4 miles between Eversource’s existing Frost Bridge Substation in the Town of Watertown and existing Campville Substation in the Town of Harwinton; (b) related modifications to Frost Bridge Substation and Campville Substation; and (c) reconfiguration of a 0.4 mile segment of two existing 115-kV electric transmission lines across the Naugatuck River in the Towns of Litchfield and Harwinton within the same existing right-of-way as the new 115-kV electric transmission line. Independent Environmental Inspector.

 

3.       DOCKET NO. 468 - The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Southwest Connecticut Reliability Project that traverses the municipalities of Bethel, Danbury, and Brookfield, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 3.4 miles between Eversource’s existing Plumtree Substation in the Town of Bethel to its existing Brookfield Junction in the Town of Brookfield; (b) reconfiguration of two existing 115-kV double-circuit electric transmission lines at Eversource’s existing Stony Hill Substation in the Town of Brookfield; and (c) related substation modifications. Draft Findings of Fact.

 

4.       PETITION NO. 1218 – PSEG Power Connecticut LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a new 485 megawatt (MW) dual fuel combined-cycle electric generating facility at the existing Bridgeport Harbor Station located at 1 Atlantic Street, Bridgeport, Connecticut. Development and Management Plan – Phase I.

5.       PETITION NO. 1238 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the 1779 transmission line traversing the municipalities of Hartford, East Hartford, and South Windsor, Connecticut, and related transmission line structure improvements. Decision.


6.       PETITION NO. 1251 – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed rebuilding and reconductoring of approximately 3.8 miles of its existing No. 900 69-kV transmission line within existing right of way between Skungamaug Substation and Mansfield Junction in Coventry, Connecticut, and related transmission line structure improvements. Decision.

7.       PETITION NO. 1253 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of an existing commercial building located at 99 Hamilton Avenue, Stamford, Connecticut.  Decision.

8.       Administrative Matters.  

·         Regular Items

>        Upcoming Calendar Events:

 

·         Tuesday, November 1, 2016, public hearing beginning with a 2:00 p.m. public field review, a 3:00 p.m. evidentiary session, and a 7:00 p.m. public comment session for Docket No. 463A at the East Lyme Town Hall, Upper Meeting Room, 108 Pennsylvania Avenue, Niantic, Connecticut.

·         Thursday, November 3, 2016, evidentiary hearing session beginning at 11:00 a.m. for Docket No. 470 at the Connecticut Siting Council, Hearing Room 1, 10 Franklin Square, New Britain, Connecticut.

·         Thursday, November 10, 2016, beginning at 1:00 p.m. Energy/Telecommunications meeting, in Hearing Room Two, Ten Franklin Square, New Britain, Connecticut.

·         Tuesday, November 15, 2016, evidentiary hearing session beginning at 11:00 a.m. for Docket No. 470 at the Connecticut Siting Council, Hearing Room 1, 10 Franklin Square, New Britain, Connecticut.

Location: New Britain, CT
This event is 217 miles from you (17603).

1 PM

Input your zip code to calculate the distance to the event:
Go Back

CSC Calendar of Events