Connecticut Siting Council
Sep 14, 2017

Energy/telecommunications meeting in New Britain

DATE:  September 7, 2017

TO:     Council Members

FROM: Robert Stein, Chairman

RE:      Connecticut Siting Council Energy/Telecommunications Meeting


An Energy/Telecommunications meeting of the Connecticut Siting Council will be held on September 14, 2017, at 1:00 p.m. in Hearing Room Two, Ten Franklin Square, New Britain, Connecticut.

AGENDA

  1. Minutes of August 31, 2017

  2. DOCKET NO. 468 - The Connecticut Light & Power Company d/b/a Eversource Energy Certificate of Environmental Compatibility and Public Need for the Southwest Connecticut Reliability Project that traverses the municipalities of Bethel, Danbury, and Brookfield, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 3.4 miles between Eversource’s existing Plumtree Substation in the Town of Bethel to its existing Brookfield Junction in the Town of Brookfield; (b) reconfiguration of two existing 115-kV double-circuit electric transmission lines at Eversource’s existing Stony Hill Substation in the Town of Brookfield; and (c) related substation modifications. Independent Environmental Inspector.

  3. DOCKET NO. 471 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Hamden Tax Assessor’s Map 2826, Block 24, 208 Kirk Road (a/k/a 1075 Paradise Avenue), Hamden, Connecticut. Draft Findings of Fact.

  4. DOCKET NO. 473 - Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 515 Morehouse Road, Easton, Connecticut. Draft Findings of Fact, Opinion, Decision and Order.

  5. DOCKET NO. 477 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 46 Cemetery Road, Canterbury, Connecticut. Completeness Review, Schedule, Deposition of Transcript.

  6. PETITION NO. 1312 - Candlewood Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 20 megawatt AC (26.5 megawatt DC) solar photovoltaic electric generating facility located on a 163 acre parcel at 197 Candlewood Mountain Road and associated electrical interconnection to Eversource Energy’s Rocky River Substation on Kent Road in New Milford, Connecticut. Request Party/Intervenor Status.

  7. PETITION NO. 1317 - Broad Street Fuel Cell, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 1.4 megawatt customer-side combined heat and power fuel cell facility to be located adjacent to and south of the Ferris Athletic Center at Trinity College, 300 Summit Street, Hartford, Connecticut. Decision.

  8. PETITION NO. 1318 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 3039 Main Street, Glastonbury, Connecticut. Decision.

  9. TS-T-MOBILE-011-170818 - T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 7 Hoskins Road, Bloomfield, Connecticut. Decision.

  10. TS-T-MOBILE-028-170818 - T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 600 Old Hartford Road, Colchester, Connecticut. Decision.

  11. TS-CING-043-170821 - New Cingular Wireless PCS, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 100 Sunset Ridge, East Hartford, Connecticut. Decision.

  12. Administrative Matters.

Regular Items:

Upcoming Calendar Events:

Petition No. 1310, Tuesday, September 19, 2017, public hearing beginning with a 1:30 p.m. public field review, a 3:00 p.m. evidentiary session, and a 6:30 p.m. public comment session at the Brooklyn Community Center Main Room, 31 Tiffany Street, Brooklyn, Connecticut.

Petition No. 1312, Tuesday, September 26, 2017, public hearing beginning with a 1:30 p.m. public field review, a 3:00 p.m. evidentiary session, and a 6:30 p.m. public comment session at the Roger Sherman Town Hall, E. Paul Martin Room, 10 Main Street, New Milford, Connecticut.

Energy/Telecommunications meeting, Thursday, September 28, 2017, beginning at 1:00 p.m., in Hearing Room Two, Ten Franklin Square, New Britain, Connecticut.