CSC: Docket No. 466 - Frost Bridge to Campville Project

Docket No. 466 - Frost Bridge to Campville Project

The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Frost Bridge to Campville 115-kilovolt (kV) electric transmission line project that traverses the municipalities of Watertown, Thomaston, Litchfield, and Harwinton, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 10.4 miles between Eversourceís existing Frost Bridge Substation in the Town of Watertown and existing Campville Substation in the Town of Harwinton; (b) related modifications to Frost Bridge Substation and Campville Substation; and (c) reconfiguration of a 0.4 mile segment of two existing 115-kV electric transmission lines across the Naugatuck River in the Towns of Litchfield and Harwinton within the same existing right-of-way as the new 115-kV electric transmission line.

Application
Volume 1  -    Description of the Proposed Project and Alternatives Analysis 
Volume 2  -    Wetlands and Watercourses Report 
Volume 3  -    Environmental
Volume 4  -    Planning 
Volume 5-1 -  Project Maps and Drawings  
Volume 5-2 -  Project Maps and Drawings    
Volume 5-3 -  Project Maps and Drawings   
Volume 5-4 -  Project Maps and Drawings    
Volume 5-5 -  Project Maps and Drawings  

Bulk Filing#1:
Frost Bridge to Campville Municipal Consultation Filing:
Part 1   Part 2   Part 3   Part 4   Part 5-1   Part 5-2   
Part 5-3   Part 5-4   Part 5-5   Part 5-6   Part 5-7   

Bulk Filing #2
From Treeland to Shrubland Video - available to view in Council's Office

PROCEDURAL CORRESPONDENCE

STATE AGENCY COMMENTS

MUNICIPAL COMMENTS

PUBLIC OFFICIAL COMMENTS

HEARING INFORMATION
         Proposed Hearing Procedure

      Schedule
      Schedule, 1/21/16

      Service List
      

      Hearing Programs

      Transcripts

PARTIES AND INTERVENORS

      Applicant

         Exhibits

         Correspondence

         Motions and Objections
            Signed Protective Order, 2/23/16

         Post Hearing Briefs and Draft Findings of Fact
          
Applicant's Proposed Findings of Fact 3/24/16
 
 
      Party - Office of Consumer Counsel

         Exhibits

         Correspondence

         Motions and Objections

         Post Hearing Briefs and Draft Findings of Fact

DRAFT FINDINGS OF FACT

FINAL DECISION
         Corrected Opinion Document

DEVELOPMENT & MANAGEMENT PLAN
 
   
  

______________________________________     

 
If you are interested in becoming a party or intervenor in this proceeding, click here for more information.
 
If you would like to make a limited appearance statement (public comment), click here.
______________________________________

Once an application is approved the applicant then must file what is known as a Development & Management (D&M) Plan, which addresses several details including construction, design, etc., for Council approval prior to construction.

The Council often receives public comment letters with regard to a proceeding. These files are open for public viewing in the Councilís office during normal business hours.