PETITION NO.  1 - Connecticut Light and Power Company petition for reconductoring of a section of existing 115-kV transmission line in Norwich.  Staff Report.  Approved 9/8/72

PETITION NO.  2 - Hartford Electric Light Company petition for replacement of structures on a section of the existing Manchester -South Meadow 115-kV transmission line extending approximately 1.5 miles from the vicinity of the Manchester - East Hartford town line westerly to Route 15.  Staff Report.  Approved 10/13/72

PETITION NO.  3 - The Connecticut Light and Power Company petition for reconductoring a portion of an existing 115-kV line between Trumbull Junction and Norwalk Substation and a 115-kV line on same right of way between Old Town Substation and Norwalk Substation and crossing facilities of Penn Central Transportation Company, the Southern New England Telephone Company, and the United Illuminating Company in Trumbull, Bridgeport, Fairfield, Easton, Weston, Wilton, and Norwalk. Approved 10/13/72

PETITION NO.  4 - The City of Groton petition for the construction of 2.94 miles of a 115 kV transmission line and 115/34 kV receiving substation Groton. Withdrawn

PETITION NO.  5 - The Connecticut Yankee Atomic Power Company petition for changes to various systems involved in the collection and treatment of radioactive wastes at the Connecticut Yankee Nuclear Power Station in Haddam.  Staff Report.  Approved 10/13/72

PETITION NO.  6 - United Illuminating Company petition for replacing double circuit, steel lattice structures with double circuit, steel monopole structures, reconductoring, and temporarily rerouting sections of an existing 115-kV transmission line from Derby Substation, Roosevelt Drive, Derby to a Connecticut Light and Power Company tap, off Route 108, Shelton. Tabled 12/4/72 Denied 1/26/73

PETITION NO.  7 - Connecticut Light and Power Company petition for reconductoring and replacing the structures of two existing 69-kV transmission lines in Lebanon to Mansfield Substation off North Eagleville Road in Mansfield.  Staff Report.  Approved 12/15/72

PETITION NO.  8 - Northeast Utilities Service Company petition for reconductoring two existing 115-kV transmission line circuits extending approximately 4.9 miles from Berlin Substation off Beckley Road, Berlin to Reservoir Road Junction off Reservoir Road, New Britain.  Approved 12/11/72

PETITION NO.  9 - Northeast Utilities Service Company petition for relocating and replacing single circuit, double wood pole structures with single circuit, single load monopole structures along sections of an existing 69-kV transmission line near Gray’s Bridge Road, Brookfield and between Route 133 and Silvermine Road, in Brookfield.  Staff Report.  Approved 12/1/72

PETITION NO.  10 - Connecticut Light and Power Company petition for the changes to the existing 69-kV line from Rocky River hydroelectric plant to the Bulls Bridge hydro electric plant in Brookfield.  Staff Report.  Approved 12/1/72

PETITION NO.  11 - Connecticut Light and Power Company petition for reinsulating existing sections of 69-kV line from Brookfield Junction and from West Brookfield Junction northerly to the Rocky River hydro plant in New Milford.  Staff Report.  Approved 12/1/72

PETITION NO. 12 - Connecticut Light and Power Company petition for reconductoring and replacing the structures on the two existing 69-kV circuits from the Carmel Hill Substation in Woodbury westerly to the Rocky River Substation in New Milford. (Washington)  Staff Report.  Approved 1/26/73

PETITION NO.  13 - Algonquin Gas Transmission Company petition for the construction of an underground natural gas transmission pipeline in Wallingford and New Haven. Approved 4/27/73

PETITION NO.  14 - Northeast Utilities Service Company petition for the replacement of double circuit wood pole structures with double circuit steel monopole structures and the reconductoring of two 115-kV circuits extending approximately 6.16 miles from Southington Substation, Southington to Forestville Substation, Bristol, and about 0.8 miles from Forestville Junction, Southington to Bristol Substation, Bristol.  Staff Report.  Approved 2/23/73

PETITION NO.  15 - Connecticut Light and Power Company, Hartford Electric Light Company and Western Massachusetts Electric Company petition for a reinforced concrete building at Millstone Nuclear Power Station, Unit 1, in Waterford.  Staff Report.  Approved 4/27/73

PETITION NO.  16 - Hartford Electric Light Company petition for reconductoring one circuit, removing the second circuit and replacing supporting structures on the 115-kV transmission line from Berlin Substation northeasterly to Rocky Hill Substation in Rocky Hill and Berlin.  Staff Report.  Approved 11/27/73

PETITION NO.  17 - Hartford Electric Light Company petition to construct an underground 115-kV transmission line between South Meadow generating station and a proposed new substation at New Park Avenue and Kane Street in Hartford. Approved 6/24/73

PETITION NO.  18 - Connecticut Light and Power Company petition for the construction of a double-circuit 115-kV underground transmission line from the Triangle Substation, on Triangle Street, northerly and westerly to the proposed Middle River Substation, on Middle River Road in Danbury.  Staff Report.  Approved 7/27/73

PETITION NO.  19 - Northeast Utilities Service Company petition for replacing existing steel lattice structures with steel monopole structures and reconductoring two existing 115-kV circuits extending about 5.3 miles from North Bloomfield Substation, Duncaster Road, to Bloomfield Tap Point near Blue Hills Avenue, in Bloomfield. Approved 9/14/73

PETITION NO.  20 - Connecticut Light and Power Company petition for the installation of a 115-kV circuit on an existing double circuit single steel pole line from the Massachusetts -Connecticut state line to Scitico Substation, in Enfield.  Staff Report.  Approved 10/26/73

PETITION NO.  21 - City of Groton, Department of Utilities petition for the construction of a single circuit 115-kV transmission line  from the Groton-Ledyard town line to Buddington Substation, in Groton.  Staff Report.  Approved 11/30/73

PETITION NO.  22 - Connecticut Light and Power Company petition for the construction of a single circuit 115-kV transmission line from the Groton town line to Whipple Junction substation in Ledyard.  Staff Report.  Approved 11/30/73

PETITION NO.  23 - Hartford Electric Light Company petition for the construction of a single-circuit 115-kV underground transmission line, in Hartford. Approved 11/30/73

PETITION NO.  24 -Connecticut Light and Power Company petition for proposed route changes for an overhead transmission line in the vicinity of Toby Hill Rd and Route 153, in Westbrook. Denied-Application to modify Cert. required. 12/13/73

PETITION NO.  25 - Connecticut Light and Power Company petition for proposed route changes for an overhead transmission line in the vicinity of Jefferson Park Rd in Madison. Denied-Application to modify Cert. reqired. 12/13/73

PETITION NO.  26 - The Hartford Electric Light Company petition for the construction of a 115-kV line crossing facilities of the Connecticut Light and Power Company, Penn Central Transportation Co., and the Southern New England Telephone Company in Canaan, Goshen, Cornwall, and Torrington.  Staff Report.  Approved 3/29/74

PETITION NO.  27 - The Connecticut Light and Power Company petition for construction of a 115-kV line from Frost Bridge Substation to Bunker Hill Substation and crossing facilities of the Penn Central Transportation Company and the Southern New England Telephone Company in Watertown and Waterbury.  Staff Report.  Approved 5/19/74

PETITION NO.  28 - The Hartford Electric Light Company petition for reconductoring and replacing supporting structures in the 115-kV transmission line from Rocky Hill Substation in Rocky Hill to an existing tower north of Hartford Avenue in Wethersfield.  Staff Report.  Approved 6/14/74

PETITION NO.  29 - The Hartford Electric Light Company petition for reconductoring and replacing the structures on the easterly of two existing 115-kV circuits from the Berlin Substation in the Town of Berlin to Newington Substation in the Town of Newington. Approved 10/18/74

PETITION NO.  30 - Northeast Utilities Service Company petition for the purchase of available, privately-owned property section of a proposed transmission line in the Amston section of Hebron. Denied 1/10/75

PETITION NO.  31 - Northeast Utilities Service Company petition for a 115-kV transmission line through the Town of Norwalk, Darien and Stamford.   Staff Report.  Approved 11/10/75 Rev. Approv. 7/13/77

PETITION NO.  32 - Northeast Utilities Service Company petition for replacing existing wood pole tap structures with steel lattice structures to reconnect existing 115-kV transmission line conductors and to temporarily relocate a portion of the line into wood pole structures at Cook Hill Junction in Cheshire.  Staff Report.  Approved 3/11/75

PETITION NO.  33 - Northeast Utilities Service Company petition for the removal of two existing transmission line steel structures, construction of two new steel monopole transmission structures, and installation of a temporary wood pole double circuit extending about 0.4 miles in length along a portion of an existing double circuit 115-kV transmission line between Devon and Norwalk in Trumbull.  Staff Report.  Approved 11/25/75

PETITION NO.  34 - Northeast Utilities Service Company petition for modifications to two 115 kV transmission lines in Newington.  Staff Report.  Approved 2/20/76

PETITION NO.  35 - Northeast Utilities Service Company petition for construction of a 120-foot by 120-foot warehouse building with attached 60-foot long by 30-foot wide exterior platform, a new 54-foot by 42-foot guard house, and a fish diversion and trench deflection structure at an existing circulating water intake in the Connecticut River, at Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 9/3/76

PETITION NO.  36 - The Connecticut Light and Power Company petition for construction of a double circuit 115-kV line at the Mianus River, in Greenwich.  Staff Report.  Approved  5/15/77 Rev. Approv. 1/11/80

PETITION NO.  37 -Connecticut Light and Power Company petition for the construction of a 69-kV line to supply the Skungamaug Substation crossing facilities of the Southern New England Telephone Company, in Coventry. Approved 6/23/77  Staff Report.  Rev. Approv. 9/25/77

PETITION NO.  38 - Connecticut Light and Power Company petition for construction of a 27.6-kV line capable of operation at 115-kV from Enfield Substation to Windsor Locks, crossing facilities of the Consolidated Rail Corporation (Conrail) and the National Railroad Passenger Corporation (Amtrak), in Enfield and Windsor Locks.  Staff Report.  Approved 9/28/77

PETITION NO.  39 - Hartford Electric Light Company petition to construct a 115-kV line from Canton Substation, in Canton to North Bloomfield Substation, in Bloomfield, crossing facilities of the Southern New England Telephone, in Canton, Simsbury, and Bloomfield.  Staff Report.  Approved 12/13/77

PETITION NO.  40 - United Illuminating Company petition for modifications to UI’s electric generating station on the west shore of Bridgeport Harbor, in Bridgeport.  Staff Report.  Approved 11/16/77

 PETITION NO.  41 - The Connecticut Light and Power Company petition for a Microwave Telecommunication Tower on Aunt Patty’s Lane, in Bethel.  Denied 11/29/77 - SEE DOCKET 13

PETITION NO.  42 - Northeast Utilities petition for the installation of one wood pole structure and minor conductor additions required to tap an existing 115-kV line and supply the proposed Brooklyn Substation, in Brooklyn.  Staff Report.  Approved 5/17/78

PETITION NO.  43 - Town of Wallingford petition for the retro fitting of three coal-fired furnaces with four low-excess air oil burners in four steam generators at Alfred L. Pierce Station, East St., in Wallingford. Approved 9/25/78

PETITION NO.  45 - Haystack Cable Vision petition for the construction of a tower, in Salisbury. Approved - No Certificate Required 12/1/78

PETITION NO.  46 - Waterbury Community Antenna, Inc. petition to construct an earth station receiver, on East Aurora St., in Waterbury. Approved 1/8/79

PETITION NO.  47 - National Passenger Corporation (Amtrak) petition for four 100-foot high steel monopole telecommunications towers within Amtrak’s right-of-way located off Hallock Avenue, New Haven; off Whitfield Street, Guilford, east of the Boston Post Road overpass, Old Saybrook; and near Hamilton Street and Smith Street, New London. Denied 11/30/79

PETITION NO.  48 - The Connecticut Light and Power Company petition for installation of wood structures and associated guys along its 115-kV transmission line from East Meriden Substation to Haddam Substation, in Haddam and Middletown.  Staff Report.  Approved 11/30/79

PETITION NO.  49 - Southern New England Telephone Company petition for construction of a replacement microwave tower on Birch Mountain Road, in Glastonbury.  Staff Report.  Approved 1/11/80

PETITION NO.  50 - Coastal Cable TV Company petition to place a receiving dish on the Department of Public Safety’s tower, on Vinegar Hill Road, in Ledyard. Approved 2/22/80

PETITION NO. 51 - Coastal Cable TV Company CTI Towers, Inc. petition for the modification of a tower site, in Stonington to transmit to the State Police tower, in Ledyard. Approved 3/19/80 Notice of Ownership dated 02/28/17

PETITION NO.  52 - Connecticut Light and Power Company petition for the replacement of thirteen transmission line structures with taller structures along sections of the existing Plumtree Substation to Peaceable Substation 115-kV line in Bethel and Redding.  Staff Report.  Approved 3/13/80

PETITION NO.  53 - Connecticut Light and Power Company petition for the installation of 115-kV transmission line conductor, line taps, and associated equipment on an existing lattice steel structure located at Stony Hill Substation, Stony Hill Road, in Brookfield.  Staff Report.  Approved 3/13/80

PETITION NO.  54 - Northeast Cablevision, Inc. petition for the installation of a lattice-type, parabolic signal reflector and microwave receiving antenna at a head-end facility located on Platt Hill, off Route 263. (Winchester)  Staff Report.  Denied 4/10/80

PETITION NO.  55 - Connecticut Department of Transportation petition for the construction of a telecommunications tower, antenna, associated equipment, and equipment building at an existing tower site located on Vinegar Hill off Vinegar Hill Road, in Ledyard.  Staff Report.  Approved 4/18/80

PETITION NO.  56 - Northeast Utilities Service Company petition for the construction of a low-level, radioactive waste storage facility at Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 11/6/80

PETITION NO.  57 - Northeast Utilities Service Company petition for the construction of a 1.1 acre parking area addition to an existing parking lot at the Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 4/18/80

PETITION NO.  58 - Northeast Utilities Service Company petition for the construction of a one-story, concrete Emergency Operations Center building at the Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 6/19/80

PETITION NO.  59 - Northeast Utilities Service Company petition for the construction of a one-story concrete Emergency Operations Center building and parking lot at Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 6/19/80

PETITION NO.  60 - Northeast Utilities Service Company petition for construction of a one-story concrete low-level solidified radioactive waste storage building within Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 11/6/80

PETITION NO.  61 - Connecticut Department of Transportation petition for the construction of a self-supporting lattice tower and antennas to replace an existing tower located at State Police Troop F Barracks, in Westbrook.  Staff Report.  Approved 9/16/80

PETITION NO.  62 - Connecticut Light and Power Company petition for the construction of a steel lattice structure associated equipment and relocation of a portion of an existing 115-kV transmission line at the intersection of a Penn Central railroad right-of-way and Beachside Avenue, in Westport.  Staff Report.  Approved 2/25/81

PETITION NO.  63 - Connecticut Department of Transportation petition for the construction of a telecommunications tower, microwave antenna, and associated equipment to replace an existing tower located on a bus service center building located at 93 Vernon Street, in Hartford.  Staff Report.  Denied 2/25/81

PETITION NO.  64 - Connecticut Department of Transportation petition for the construction of a telecommunications tower, microwave antenna, and associated equipment to replace an existing tower located at 470 James Street, New Haven.  Staff Report.  Denied 2/25/81

PETITION NO.  65 - Connecticut Light and Power Company petition for reconductoring and replacing the supporting structures of the existing 115-kV transmission line from Plumtree Substation, in Bethel to Ridgefield Junction, in Redding.   Staff Report.  Denied 3/11/81

PETITION NO.  66 - Connecticut Department of Transportation petition for the installation of telecommunications antennas on an existing telecommunications tower owned by Northeast Utilities located on Goose Hill ,off Porkorny Road, in Haddam.  Staff Report.  Approved 3/11/81

PETITION NO.  67 - Southern New England Telephone Company petition for the construction of an 80-foot tall square lattice steel tower antenna and associated equipment, concrete equipment building, and fuel storage tank at an existing tower facility in Wolcott; construction of a concrete equipment building and installation of microwave antennas and associated equipment on an existing tower in Waterbury; installation of microwave antennas and associated equipment on existing towers in Meriden; and in Bridgeport, Shelton, and Norwalk.  Staff Report.  Approved 4/1/81

PETITION NO.  68 - Algonquin Gas Transmission Company petition for the installation of a 50-foot tall monopole telecommunications antenna at its Meter Station site on Arch Street, Putnam.  Staff Report.  Approved 5/20/81

PETITION NO.  69 - Connecticut Department of Transportation petition for the installation of a microwave parabolic antenna on an existing telecommunications tower located on West Rock in New Haven and two microwave antennas on an existing telecommunications tower located on Buckley Hill Road, in Colchester.  Staff Report.  Approved 7/2/81

PETITION NO.  70 - Northeast Utilities Service Company petition for the construction of a training facility consisting of a building, parking area, and septic system within Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 7/2/81

PETITION NO.  71 - Southwire Company petition for the construction of a new power house and repairs to an existing hydroelectric facility at the Wyre Wynd Plant, located on the Quinebaug River, in Jewett City.  Staff Report.  Approved 9/27/81

PETITION NO.  72 - Eveready Machinery Company petition for the refurbishment of an existing lowhead hydroelectric plant located on the east bank of the Housatonic River south of the Derby Dam, in Derby.  Staff Report.  Tabled 10/9/81, No Other Record of Action.

PETITION NO.  73 - Connecticut Natural Gas Company petition for the construction of a wood pole telecommunication tower and equipment enclosure at an existing gate station off Dekraft Road, in Greenwich.  Staff Report.  Approved 10/1/81

PETITION NO.  74 - Connecticut State Police petition for proposed modifications to the existing two-way radio communications system, in Westport and Wilton.  Staff Report.  Approved 9/24/81

PETITION NO.  75 - -Storer Communications of Clinton, Inc. CTI Towers , Inc. petition for the construction of an equipment building and additional microwave earth station receiver at an existing CATV telecommunications facility located off Route 81, in Killingworth. Approved 10/22/81 Staff Report.  Notice of Ownership dated 02/28/17

PETITION NO.  75 - Storer Communications of Clinton, Inc. petition for the construction of an equipment building and additional microwave earth station receiver at an existing CATV telecommunications facility located off Route 81, in Killingworth.  Staff Report.  Approved 10/22/81

PETITION NO.  76 - Algonquin Gas Transmission Company petition for the installation of a compressor at its Cromwell regulator station located off Route 3, in Cromwell. Approved 12/10/81

PETITION NO.  77 - Connecticut Light and Power Company petition for the construction of two double circuit steel pole transmission line structures and relocation of a segment of an existing 115-kV transmission line in the Stamford Railroad Station right-of-way, in Stamford.  Staff Report.  Approved 1/28/82

PETITION NO.  78 - Cablevision of Connecticut petition for the installation of CATV microwave antennas and associated head-end equipment on the roof of a building located at 50 Fairview Avenue, in Norwalk.  Approved 3/1/82

PETITION NO.  79 - Southern New England Telephone Company petition for the placement of microwave antennas on the roofs of existing buildings at 85 Main Street, Bristol, and 239 Prospect Street, Torrington, and on an existing telecommunications tower located on Wildcat Hill, off Wildcat Hill Road, in Harwinton.  Staff Report.   Decision LetterApproved 3/1/82

PETITION NO.  80 - Connecticut Light and Power petition for the rebuilding of an 115 kV lattice tower line in the Town of Manchester.  Staff Report.  Approved 3/1/82

PETITION NO.  81HW - McKesson Chemical Company petition for a ruling on the Siting Council’s (HW) jurisdiction under Public Act 81-369 as applied to the 309 State Street plant, in North Haven. Approved 9/8/82

PETITION NO.  82 - The Connecticut Light and Power Company petition for rebuilding and relocating a section of the 115-kV transmission line in the vicinity of Forbes Street, in East Hartford and Spencer Street, in Manchester.  Staff Report.  Approved 5/13/82

PETITION NO.  83 - The Hartford Electric Light Company petition for the relocation of a section of the 115-kV transmission line in the vicinity of Forbes Street and Roberts Street, in East Hartford.  Staff Report.  Approved 4/23/82

PETITION NO.  84 - United Illuminating Company petition for the reconversion of Bridgeport Harbor Station , Unit No. 3, in Bridgeport, for the capability to burn either low sulfur coal or oil.  Staff Report.  DENIED, became Docket No. 27.

PETITION NO.  85 - Century Norwich Corporation petition for the removal of four 40-foot high wooden poles supporting antennas and one 80-foot high CATV tower, and the construction one 300-foot high CATV tower at Plane Hill Road, in Norwich. Denied 6/4/82, became Docket No. 30

PETITION NO.  86 - Hale Manufacturing Company petition for the redevelopment of the Cargill Falls 1.3 MW hydroelectric generating project, in Putnam.  Staff Report.  Approved 8/12/82

PETITION NO.  87 - Southern New England Telephone Company petition for implementation of SNET’s 1983 microwave digital signal plan with improvements to facilities in Canaan and Norfolk.  Staff Report.  Approved 11/5/82

PETITION NO.  88 - Northeast Utilities petition for a proposed 115 kV line modification in Redding.  Staff Report.  Approved 11/12/82

PETITION NO.  89 - The Connecticut Light and Power Company petition for modifications to the 115-kV, Plumtree Substation - Newtown Substation, transmission line in Bethel and Newtown.  Staff Report.  Approved 12/13/82

PETITION NO.  90 - Northeast Utilities petition for modifications to the 115-kV transmission line between Whipple Junction, Mystic Junction, and Mystic Substation in Stonington, Ledyard, and Groton.  Staff Report.  Approved 12/13/82

PETITION NO.  91 - The Connecticut Light and Power Company petition for removal of the de-energized Skungamaug Substation-Rockville Junction, 69-kV transmission line in Vernon, Tolland, and Coventry.  Staff Report.  Approved 12/22/82

PETITION NO.  92 - The Connecticut Light and Power Company petition for modifications and additions to two Schwab Junction-Beseck Junction 115-kV transmission lines to the North Wallingford Substation, in Wallingford.  Staff Report.  Approved 5/24/83

PETITION NO.  93 - The Connecticut Light and Power Company petition for modifications to the Frost Bridge Substation-Southington Substation 345-kV transmission line, in Southington and Wolcott.  Staff Report.  Approved 6/20/83

PETITION NO.  94 - The United Illuminating Company petition for reconstructing a section of the Grand Avenue Substation - Sackett Point Substation 115-kV transmission line in New Haven and North Haven.  Staff Report.  Approved 6/20/83

PETITION NO.  95 - Northeast Utilities Service Company petition for the construction of a simulation training facility building at the Millstone Point nuclear facility, in Waterford.  Staff Report.  Approved 7/12/83

PETITION NO.  96 - Northeast Utilities petition for modifications to sections of the Southington Substation - Wallingford Substation, Southington Substation - Hanover Substation, Southington Substation - East Meriden Substation, 115-kV transmission lines located in Meriden.  Staff Report.  Approved 8/23/83

PETITION NO.  97 - Northeast Utilities petition for the addition of a transformer and associated equipment in the Norwalk Substation, in Norwalk.  Staff Report.  Approved 11/4/83

PETITION NO.  98 - Northeast Utilities petition for modifications to the Frost Bridge Substation-Long Mountain Substation, 345-kV transmission line off Fenn Hill Road, in Watertown.  Staff Report.  Approved 2/10/84

PETITION NO. 99 - The Connecticut Department of Transportation petition for a proposed 60 Hz railroad electrical supply station off Increase La., in Westport.   Staff Report.  Approved 2/10/84

PETITION NO.  100 - Northeast Utilities petition for the addition of a microwave transmitter/receiver at its existing telecommunication facility located off Porkorny Road, in Haddam. Withdrawn 2/6/84

PETITION NO.  101 - Northeast Utilities petition for modifications to the Sasco Creek Substation-Ash Creek Substation (UI) 115-kV transmission line at Sasco Creek Substation, in Westport.  Staff Report.  Approved 2/10/84

PETITION NO.  102 - The Connecticut Light and Power Company petition for the addition of a microwave transmitter/receiver dish and associated equipment at its existing telecommunications facility off Porkorny Road, in Haddam.  Staff Report.  Approved 2/24/84

PETITION NO.  103 - Northeast Utilities petition for additions to the Manchester Substation, in Manchester.  Staff Report.  Approved 3/14/84

PETITION NO.  104 - The United Illuminating Company petition for the residing of its New Haven Harbor generating Station, in New Haven.  Staff Report.  Approved 4/11/84

PETITION NO.  105 - Arco Metals Company petition for hydroelectric project on the Naugatuck River, in Ansonia. Staff Report.  Approved 5/7/84

PETITION NO.  106 - The Southern New England Telephone Company petition for a declaratory ruling that no Certificate is required for its proposed replacement of its microwave tower, in Norfolk.  Staff Report.  Approved 7/24/84

PETITION NO.  107 - The Connecticut Resources Recovery Authority petition for a processing plant within the Mid-Connecticut Refuse-to-Energy project, in Hartford.  Staff Report.  Denied 11/24/84

PETITION NO.  108 - The Connecticut Resources Recovery Authority petition for the repowering of the existing Connecticut Light and Power South Meadows Generating Station, in Hartford.  Staff Report.  Denied 11/24/84

PETITION NO.  109 - The United Illuminating Company petition for an interim alteration in coal transport procedure at Steel Point Station, in Bridgeport. Approved 7/3/84

PETITION NO.  110 - The Department of Environmental Protection petition for a declaratory ruling that no Certificate is required for facilities to be used for automated flood warning in the State of Connecticut. Approved 9/14/84

PETITION NO.  111 - New Milford Cablevision Company petition for a declaratory ruling that no Certificate is required for the modification of CATV headend facility, in New Milford.   Staff Report.  Approved 9/23/84

PETITION NO.  112 - Storer Cable Communications petition for replacement of a CATV tower and expansion of a service building ,off Route 81, in Killingworth.  Staff Report.  Denied 10/9/84

PETITION NO.  113 - The United Illuminating Company petition for fluid filling underground cables at its Grand Avenue to West River Substation, in Bridgeport.  Staff Report.  Approved 10/9/84

PETITION NO.  114 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for reconfiguration of its West River Substation,  in New Haven.  Staff Report.  Approved 10/9/84

PETITION NO.  115 - The United Illuminating Company petition for reconductoring and reinsulating approximately 11.8 miles of 115-kV line between its West River and Baird Substation, excluding the Mildale Substation to Devon Substation section, in New Haven.  Staff Report.  Approved 10/9/84

PETITION NO.  116 - Northeast Utilities Service Company petition for a low-level radioactive waste reduction building at Connecticut Yankee and Millstone Nuclear Power Stations, in Haddam and Waterford respectively.  Staff Report.  Approved 10/9/84

PETITION NO.  117 - Northeast Utilities Company petition for addition of a 47 MVA, 11- to 23-kV transformer and two 23-kV feeders within Enfield 12C Substation, in Enfield.  Staff Report.  Approved 10/9/84

PETITION NO.  118 - Northeast Utilities Service Company petition for declaratory ruling that no Certificate is required for certain additions to the South End 1G Substation, in Stamford.  Staff Report.  Approved 11/16/84

PETITION NO.  119HW - The Hitchcock Gas Engine Company petition regarding storage of hazardous waste oils, in Bridgeport. Denied 11/16/84

PETITION NO.  120HW - CECOS Treatment Corporation petition for the proposed storage of containerized waste on Broderick Road, in Bristol. Approved 12/7/84

PETITION NO.  121 - Haystack Corporation petition for a declaratory ruling that no Certificate is required for modification of CATV head-end facility, in Salisbury.  Staff Report.  Approved 12/20/84

PETITION NO.  122 - Northeast Utilities Service Company petition for an Oil Drum Storage Building at the Montville Generating Station, in Monteville.  Staff Report.  Approved 2/1/85

PETITION NO.  123 - Northeast Utilities Service Company petition for replacement of the Devon Station Unit 10 Emergency Combustion Turbine, in Milford.  Staff Report.  Approved 2/27/85

PETITION NO.  124 - Storer Cable Communications petition for a replacement tower and expansion of a service building at the existing headend structure, off Route 81, in Killingworth.  Staff Report.  Approved 4/12/85

PETITION NO.  125 - Algonquin Gas Transmission Company petition to construct a natural gas transmission line between Cheshire and Farmington. Approved 3/26/85

PETITION NO.  126 - The Connecticut Light and Power Company petition for the addition of a fourth generating unit at the Falls Village hydroelectric project, in Canaan.  Approved 5/29/85

PETITION NO.  127 - 108 Radio Company Limited Partnership petition to place an FM transmission antenna and associated equipment on the existing Unit No. 3 smokestack of the Bridgeport Harbor, United Illuminating Company facility, in Bridgeport.  Staff Report.  Approved 4/12/85

PETITION NO.  128 - Southern New England Telephone Company petition for the proposed addition of an antenna to a microwave tower at 555 Main Street, in Stamford.   Staff Report.  Approved 5/29/85

PETITION NO.  129 - Northeast Utilities Service Company petition for modifications to the Southington-Hanover 115-kV line in Southington and Meriden.  Staff Reports for Petitions 129 - 136.  Approved 8/20/85

PETITION NO.  130 - Northeast Utilities Service Company petition for modifications to the Southington-Wallingford Junction 115-kV line in Southington, Meriden, and Cheshire.  Staff Report.  Approved 8/20/85

PETITION NO.  131 - Northeast Utilities Service Company petition for modification of the Southington-Glen Lake Junction 115-kV line in Southington, Meriden, Wallingford, Cheshire, Hamden, and Bethany.  Staff Report.  Approved 8/20/85

PETITION NO.  132 - Northeast Utilities Service Company petition for modifications to Cook Hill Junction-Devon 115-kV line in Hamden and Orange.  Staff Report. Approved 8/20/85

PETITION NO.  133 - Northeast Utilities Service Company petition for modifications to the Hanover-Devon Substation 115-kV line in Cheshire, Bethany, Woodbridge, Orange, and Milford.  Staff Report.  Approved 8/20/85

PETITION NO.  134 - Northeast Utilities Service Company petition to reconductor the Southington-Schwab Junction 115-kV line in Southington, Cheshire, Meriden, and Wallingford.  Staff Report. Approved 8/20/85

PETITION NO.  135 - Northeast Utilities Service Company petition for the construction of the Southington-Lucchini Junction 115-kV line in Southington, Meriden, Wallingford, and Cheshire.  Staff Report.  Approved 8/20/85

PETITION NO.  136 - Northeast Utilities Service Company petition for modifications to the Hanover Substation, in Meriden.  Staff Report.  Approved 8/20/85

PETITION NO.  137HW - Solvents Recovery Service of New England, Inc. petition to replace and relocate tank storage, replace equipment, reduce storage capacity and install groundwater treatment system, in Southington. Approved 9/26/85

PETITION NO.  138 - Northeast Utilities Service Company petition for modifications to three 115-kV lines, in Wolcott. Staff Report.  Approved 9/9/85

PETITION NO.  139 - The Connecticut Resources Recovery Authority Petition regarding facility status of the Refuse-to-Energy Cogeneration Project, in Wallingford. Approved 8/29/85

PETITION NO.  140HW - United Oil Recovery, Inc. petition regarding proposed modifications to its existing facility, in Meriden.  Staff Report.  Approved 9/26/85

PETITION NO.  141 - The Department of Environmental Protection petition for proposed changes to existing telecommunications facilities in Oxford, Cornwall, Hartford, Sterling, Ledyard, and Colchester.  Staff Report.  Approved 10/8/85

PETITION NO.  142 - Tele-Media Company of Northeastern Connecticut petition for proposed changes to an existing tower at its facility located on Perrin Road in Woodstock.  Staff Report.  Approved 10/8/85

PETITION NO.  143HW - CECOS Treatment Corporation petition for changes to its Connecticut Discharge Permit by lowering waste concentration, in Bristol. Partial Approval 11/26/85

PETITION NO.  144HW - CECOS Treatment Corporation petition for replacement of tanks, processes and equipment and addition of storage capacity, in Bristol. Partial Approval 11/26/85

PETITION NO.  145 - Northeast Utilities Service Company petition for the proposed modification of the Berlin to West Side 115-kV line, in Berlin.  Staff Report.  Approved 12/23/85

PETITION NO.  146 - Northeast Utilities Service Company petition for the proposed modification of the Canton to Weingart Road Junction 115-kV line in Canton, New Hartford, and Harwinton.  Staff Report.  Approved 12/23/85

PETITION NO.  147 - The Connecticut Resources Authority petition for the switchyard and interconnection line of the Refuse-to-Energy Cogeneration Project, in Wallingford.  Staff Report.  Approved 12/23/85

PETITION NO.  148 - Northeast Utilities Service Company petition for proposed modifications to 115-kV lines, in Norwalk.  Staff Report. Approved 1/27/86

PETITION NO.  149 - The Connecticut Light and Power Company petition to add a seventh hydroelectric generating unit to its existing Bulls Bridge Development on the Housatonic River, in Kent.    Approved 1/27/86

PETITION NO.  150 - Northeast Utilities Service Company petition to install two new auxiliary steam boilers at the Montville Generating Station.  Staff Report.  Approved 2/19/86

PETITION NO.  151 - The Connecticut Light and Power Company petition for modifications of the Norwalk-Peaceable 115-kV line, in Norwalk and Wilton.  Staff Report.  Approved 3/12/86

PETITION NO.  152 - Flagg Development Corporation petition for the Hartford Hospital Cogeneration project, in Hartford.  Staff Report.  Denied 2/19/86

PETITION NO.  153 - The Connecticut Light and Power Company petition for modification of the Frost Bridge-Campville 115-kV line in Watertown, Thomaston, Litchfield, and Harwinton.  Staff Report.  Approved 4/9/86

PETITION NO.  154 - The Southern New England Telephone Company (SNET) and SONECOR petition for the proposed addition of cellular antennas to a SNET rooftop facility at 555 Main St., in Stamford.  Staff Report.  Approved 2/14/86

PETITION NO.  155 - The Connecticut Yankee Atomic Power Company petition for the proposed addition to the administration building at Connecticut Yankee Nuclear Power Station, in Haddam. Approved 3/12/86

PETITION NO.  156HW - Envirite Corporation petition to place new tanks and new equipment, construct new waste pits and add temporary container storage.  Staff Report.  Partial Approval 4/9/86

PETITION NO.  157 - Northeast Utilities petition for a proposed addition and associated equipment within Rocky Hill 3R Substation, in Rocky Hill.  Staff Report.  Approved 6/16/86

PETITION NO.  158HW - Uniroyal Chemical petition for use of an existing Elm Street building as a staging area for bulking of packaged waste into larger containers, in Naugatuck. Denied 7/11/86

PETITION NO.  159 - Northeast Utilities petition for the proposed modifications of a 115-kV line substation bus at Southington Substation, in Southington.  Staff Report.  Approved 8/4/86

PETITION NO.  160 - Northeast Utilities Service Company petition for proposed modifications to a 345/115-kV line and a 115-kV line, in Windsor.  Staff Report.  Approved 9/10/86

PETITION NO.  161 - United Illuminating Company petition for a natural gas fired heating boiler system at English Station, in New Haven.  Staff Report.  Approved 10/6/86

PETITION NO.  162 - Northeast Utilities Service Company petition for proposed installation of an Emergency Satellite Office Trailer at Manchester 3A Substation, in Manchester.  Staff Report.  Approved 9/22/86

PETITION NO.  163 - Northeast Utilities Service Company petition for installation of an emergency satellite office trailer and associated equipment within Rocky Hill Substation, in Rocky Hill.  Staff Report.  Approved 9/22/86

PETITION NO.  164 - Northeast Utilities Service Company petition for the addition of a 47-MVA, 110-13.8-kV transformer, a 115-kV circuit breaker, and the replacement of an existing 5.4 MVAR capacitor bank within the Forestville 12A Substation, in Bristol.  Staff Report.  Approved 10/6/86

PETITION NO.  165 - Northeast Utilities Service Company petition for the proposed removal of a 69-kV tower line from New Britain to Bristol.  Staff Report.  Approved 11/10/86

PETITION NO.  166- Northeast Utilities petition for a  proposed addition to the existing Millstone Unit No.3 maintenance shop, in Waterford.  Staff Report.  Approved 11/10/86

PETITION NO.  167 - Cablevision of Connecticut Limited Partnership, petition for the addition of a microwave dish antenna at its head-end facility on Fairview Avenue, in Norwalk.  Staff Report.  Approved 11/10/86

PETITION NO.  168 - Northeast Utilities Service Company petition to construct a new switchgear building at the Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 12/22/86

PETITION NO.  169 - Northeast Utilities petition for proposed outage support facilities at Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 12/22/86

PETITION NO.  170 - CRRA, SCRRA, and American Refuel petition for an electric generating facility fueled by mass-burning municipal solid waste, in Preston. Withdrawn  12/1/86

PETITION NO.  171 - The Connecticut Resources Recovery Authority petition for the Refuse-to-Energy Cogeneration Project, in Wallingford.  Staff Report.  Approved 12/22/86

PETITION NO.  172 - Connecticut Natural Gas Corporation petition for the construction and operation of temporary towers and associated equipment in New Britain, Bloomfield, Glastonbury, and Rocky Hill.   Staff Report.  Denied 1/28/87

PETITION NO.  173 - Northeast Utilities petition to relocate a section of wood pole 34-kV and 115-kV lines around a sanitary landfill, in New Milford.  Staff Report.  Approved 1/12/87

PETITION NO.  174 - Northeast Utilities petition for the addition of equipment to the Newtown 12M substation, in Newtown.  Staff Report.  Approved 2/4/87

PETITION NO.  175 - Northeast Utilities petition for the proposed addition of equipment to the existing 14-kV Substation, in Windsor Locks.  Staff Report.  Approved 2/18/87

PETITION NO.  176 - Cablevision Systems of Southern Connecticut Limited Partnership petition to install additional head-end equipment, at 120 Huntington Turnpike, in Bridgeport.  Staff Report.  Approved 2/18/87

PETITION NO.  177 - Northeast Utilities petition for proposed addition of equipment to the existing Bloomfield 3B Substation, in Bloomfield.  Staff Report.  Approved 3/11/87

PETITION NO.  178 - Iroquois Natural Gas Transmission System petition on Siting Council jurisdiction over the proposed Iroquois pipeline. Council has some jurisdiction 8/4/87

PETITION NO.  179 - The Connecticut Light and Power Company petition for the construction of a 115-kV line tap to an existing transmission line, in Windsor Locks.  Staff Report.  Denied 4/1/87

PETITION NO.  180 - Metro Mobile CTS of Fairfield County, Inc. and Cablevision Systems of Southern Connecticut, Limited Partnership petition for the addition of cellular antennas and related equipment to an existing tower, in Shelton. Withdrawn 4/3/87

PETITION NO.  181HW - Envirite Corporation petition for  the proposed addition of a new pump, five new tanks, and an increase in floor space at their Thomaston facility.  Staff Report.  Approved 5/13/87

PETITION NO.  182 - Connecticut Light and Power Company petition for a proposed addition of a new 115-kV underground cable termination, two 115-kV circuit breakers and associated equipment at Montville Substation, in Montville.  Staff Report.  Approved 5/13/87

PETITION NO.  183 - Connecticut Light and Power Company petition to construct a proposed 115-kV underground line from the AES Thames Cogenerator to Montville Substation, in Montville. See Pet. 185, Denied 5/13/87

PETITION NO.  184 - Connecticut light and Power Company petition for the proposed addition of one 115-kV transformer, two 23-kV feeder positions, and a looped-line arrangement at the Canal 15Q Substation, in Southington.  Staff Report.  Approved 6/19/87

PETITION NO.  185 - Connecticut Light and Power Company petition to construct a proposed 115-kV underground line from the AES Thames Cogenerator to Montville Substation, in Montville.  Staff Report.  Denied 5/13/87

PETITION NO.  186 - Connecticut Light and Power Company petition for proposed modifications to the Thomaston 2B Substation, in Thomaston.  Staff Report.  Approved 6/19/87

PETITION NO.  187 - Connecticut Light and Power Company petition for the addition of transformers associated equipment at Devon 7R Substation, in Milford.  Staff Report.  Approved 6/19/87

PETITION NO.  188 - Connecticut Light and Power Company petition for proposed underground interconnection between the Capitol District Energy Center Cogeneration Project and the existing 115-kV northwest Hartford - Southwest Hartford underground transmission line. Denied 8/4/87

PETITION NO.  189 - Connecticut Light and Power Company petition to relocate two 69-kV lines at Montville Substation, in Montville.  Staff Report.  Approved 8/25/87

PETITION NO.  190 - Northeast Utilities petition for an addition to a 115-kV Glenbrook Substation off Lincoln Ave., in Stamford.  Staff Report.  Approved 9/10/87

PETITION NO.  191 - Northeast Utilities petition for a proposed modification of a mobile transformer position within the West Brookfield Substation, in Brookfield.  Staff Report.  Approved 10/6/87 Rev. Approv. 3/22/88

PETITION NO.  192 - Northeast Utilities petition for a proposed addition of two 115-kV circuit switches within the Cedar Heights Substation, in Stamford.  Staff Report.  Approved 10/6/87

PETITION NO.  193HW - The Connecticut Light and Power Company petition for replacement of a single lined impoundment with a two-cell concrete tank at Norwalk Harbor Station, in Norwalk.  Staff Report.  Approved 10/22/87

PETITION NO.  194 - The Connecticut Light and Power Company petition for the construction on an above ground concrete tank and the closing of a surface impoundment at the Norwalk Harbor Station, in Norwalk.  Staff Report.  Approved 10/22/87

PETITION NO.  195HW - Environmental Waste Resources, Inc., petition for an increase in permitted discharge flows for non-hazardous waste to the Waterbury POTW, in Waterbury.  Staff Report.  Approved 11/5/87

PETITION NO.  196HW - Environmental Waste Resource, Inc., petition for the removal and replacement of existing storage tanks and addition of a new mixer and dryer at their facility, in Waterbury.  Staff Report.  Approved 11/5/87

PETITION NO.  197HW - Environmental Waste Resources, Inc. petition to accept additional types of waste, and accept transformers containing PCB’s for short-term storage at their facility, in Waterbury.  Staff Report.  Approved 11/5/87

PETITION NO.  198 - The United Illuminating Company petition for an alternative coal transport procedure at its Bridgeport Harbor Station No. 3, in Bridgeport.  Staff Report.  Approved 12/16/87

PETITION NO.  199 - Northeast Utilities petition for a proposed addition of a mobile transformer position within the Triangle Substation, in Danbury.  Staff Report.  Approved 1/14/88

PETITION NO.  200 - The Connecticut Light and Power Company petition for modifications to transmission lines between West Side Substation in Middletown through Berlin Substation, to Newington Substation.  Staff Report.  Approved 1/28/88

PETITION NO.  201- The Connecticut Light and Power Company petition for proposed modifications to three 115-kV circuits between Manchester, South Windsor, and Barbour Hill Substations, in Manchester and South Windsor.  Staff Report.  Approved 2/17/88

PETITION NO.  202 - The United Illuminating Company petition for proposed lightning protection at East Shore Substation, in New Haven.  Staff Report.  Approved 3/3/88

PETITION NO.  203HW - The Connecticut Light and Power Company petition for the construction of an aboveground concrete tank at Middletown Station, in Middletown.  Staff Report.  Approved 3/22/88

PETITION NO.  204HW - The Connecticut Light and Power Company petition for the construction of an aboveground concrete tank at Montville Generating Station, in Montville.  Staff Report.  Approved 3/22/88

PETITION NO.  205HW - The Connecticut Light and Power Company petition for replacement of a single lined surface impoundment with a two cell concrete tank at Montville Generating Station, in Montville.  Staff Report.  Approved 3/22/88

PETITION NO.  206HW - Connecticut Light and Power Company petition for changes to existing hazardous waste facility, including replacement of a concrete tank, at Middletown Station, in Middletown.  Staff Report.  Approved 3/22/88

PETITION NO.  207 - The Connecticut Light and Power Company petition for the construction of an aboveground concrete tank and the replacement of a surface impoundment at Devon Station, in Milford.  Staff Report.  Approved 4/27/88

PETITION NO.  208HW - The Connecticut Light and Power Company petition for changes to the existing hazardous waste facility at Devon Station, in Milford.  Staff Report.  Approved 4/27/88

PETITION NO.  209 - Northeast Utilities Service Company petition for a proposed switchyard at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 4/27/88

PETITION NO.  210 - The Connecticut Light and Power Company petition for proposed modifications to two 115-kV lines, in Hartford and East Hartford.  Staff Report. Approved 5/3/88

PETITION NO.  211 - United Illuminating Company petition for a determination that no Certificate is required for the proposed construction of a control building adjacent to its East Main Street Substation and the relocation of 115-kV/13.8-kV transformers, connectors, and associated controls from the Steel Point Generating Plant building to the East Main Street Substation, in Bridgeport.  Staff Report.  Approved 5/19/88

PETITION NO.  212HW - Connecticut Light and Power Company petition for the proposed construction of an aboveground wastewater clarifier at Devon Station, in Milford.  Staff Report.  Approved 7/19/88

PETITION NO.  213HW - Connecticut Light and Power Company petition requesting a determination that no Certificate is required for proposed changes to the existing hazardous waste facility at Devon Substation, in Milford.  Staff Report.  Approved 7/19/88

PETITION NO.  214 - The Connecticut Light and Power Company petition for construction of two above ground steel fuel tanks in a concrete containment area at its Norwalk Harbor Station, in Norwalk.  Staff Report.  Approved 8/19/88

PETITION NO.  215 - The Connecticut Light and Power Company petition for the proposed addition of 345 kv current transformers and motor operators for disconnect switches within the Southing 4C substation, in Southington.  Staff Report.  Approved 8/19/88

PETITION NO.  216 - DENIED 8/19/88 , became Docket No. 96.

PETITION NO.  217 - Northeast Utilities petition for proposed modifications for replacement of the existing 13 MVA, 69- to 13.8-kV transformer within the North Canaan Substation, in North Canaan.  Staff Report.  Approved 9/27/88

PETITION NO.  218 - The Connecticut Light and Power Company petition for modifications to the Barbour Hill-Enfield and Enfield-Windsor Locks 115-kV lines.  Staff Report.  Approved 10/27/88

PETITION NO.  219 - The Stone Paperboard Corporation petition for a proposed 2.2 megawatt steam turbine cogeneration facility to be installed at its manufacturing plant, in Uncasville.  Staff Report.  Approved 11/21/88

PETITION NO.  220 - The Connecticut Yankee Atomic Power Company petition for proposed plant support buildings at Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 11/21/88

PETITION NO.  221HW - Statewide Environmental Services petition for short-term storage of polychlorinated biphenyl contaminated electrical capacitors at a proposed “White Goods” scrap decontamination center located in New Haven County.  Staff Report.  Approved 11/21/88

PETITION NO.  222 - The Connecticut Light and Power Company petition for the removal of four lattice towers and conductors from the Rocky Hill to Middletown 69-kV lines, in Rocky Hill.  Staff Report.  Approved 11/21/88

PETITION NO.  223 - The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment within Manchester Substation, in Manchester.  Staff Report.  Approved 12/19/88

PETITION NO.  224 - The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment within North Bloomfield Substation, in Bloomfield.  Staff Report.  Approved 12/29/88

PETITION NO.  225 - The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment within Plumtree Substation, in Bethel.  Staff Report.  Approved 12/19/88

PETITION NO.  226 - The Connecticut Light and Power Company petition for proposed changes to the fuel, stack height, and project schedule at Montville Generating Station, in Montville.  Staff Report.  Approved 12/19/88

PETITION NO.  227 - The Connecticut Light and Power Company petition for proposed additions to Windsor Locks Substation, in Windsor Locks.  Staff Report.  Approved 12/19/88

PETITION NO.  228 - The Connecticut Light and Power Company petition for proposed additions at Uncasville 1Q Substation, in Montville.  Staff Report.  Approved 2/14/89

PETITION NO.  229 - The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment at the Frost Bridge Substation, in Watertown.  Staff Report.  Approved 3/27/89

PETITION NO.  230 - Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment, in Berlin.  Staff Report.  Approved 4/24/89

PETITION NO.  231HW - The United Industrial Services petition that no Certificate is required for proposed changes at its hazardous waste facility, in Meriden.  Staff Report.  Approved 4/24/89

PETITION NO.  232 - The United Illuminating Company petition for modification to an electric generating facility at Ansonia Copper & Brass, in Ansonia.  Staff Report.  Approved 5/15/89

PETITION NO.  233 - The Connecticut Light and Power Company petition for an addition to an existing 115-kV Substation on Stony Hill Road, in Brookfield.  Staff Report.  Approved 5/15/89

PETITION NO.  234 - Connecticut Light and Power Company and O’Brien Energy Systems, Inc. petition for the proposed 115-kV underground electric transmission line interconnecting the Hartford Steam Company Cogeneration Project and CL&P’s existing South Meadow-Southwest Hartford 115-kV line as a “transmission line tap”, in Hartford. Staff Report.  Approved 6/5/89

PETITION NO.  235 - Northeast Utilities Service Company petition for the proposed construction of an east access building at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 7/6/89

PETITION NO.  236 - Killingly Energy Limited Partnership (KELP) petition for a proposed interconnection line from the KELP facility to the Connecticut Light and Power Company electrical system, in Killingly.  Staff Report.  Approved 11/22/89

PETITION NO.  237 - The Connecticut Light and Power Company petition that General Statute 16-50z does not apply to electric substations.  Staff Report.  Approved 7/25/89

PETITION NO.  238 - The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment to Norwalk Substation, in Norwalk.  Staff Report.  Approved 10/3/89

PETITION NO.  239 - Metro Mobil petition to dismiss SNET Doc. 119 application without prejudice. Dismissed 11/22/89 (See Doc 119.)

PETITION NO.  240 - Metro Mobil petition to dismiss SNET Doc. 127 application without prejudice. Dismissed 11/22/89 (See Doc 127.)

PETITION NO.  241 - Aetna Life & Casualty Company petition to install four 1.25 MW emergency generators off Addison Road, in Windsor.  Staff Report.  Approved 3/12/90

PETITION NO.  242 - The Connecticut Light and Power Company petition for the proposed addition of a 69 to 27.6-kV transformer and associated equipment within Rockville Substation, in Vernon.  Staff Report.  Approved 12/13/89

PETITION NO.  243 - The United Illuminating Company petition for the proposed installation of four transmission shunt capacitor banks at substations in North Haven and New Haven.  Staff Report.  Approved 1/16/90

PETITION NO.  244 - Connecticut Natural Gas Corporation petition for a proposal to install, own, and operate a natural gas line in Bloomfield, West Hartford, and Hartford.  Findings of Fact.  Opinion.  Decision and Order. Approved 5/30/90

PETITION NO.  245 - The Connecticut Light and Power Company petition for modifications of a 115-kV transmission lines from its Barbour Hill Substation to Windsor Locks Junction, to Enfield Substation .   Staff Report.  Approved 2/26/90

PETITION NO.  246 - The Connecticut Light and Power Company petition for proposed modifications to the Frost Bridge-Stevenson 115-kV line in Watertown, Waterbury, Middlebury, Oxford, and Monroe.  Staff Report.  Approved 3/26/90

PETITION NO.  247 - The Connecticut Light and Power Company petition for proposed modifications to the Connecticut River crossing of the South Meadow-Manchester and South Meadow-East Hartford 115-kV transmission lines in Hartford, and East Hartford.  Staff Report.  Approved 3/26/90

PETITION NO.  248 - The Connecticut Light and Power Company petition for proposed modifications to the Montville-Dudley-Bean Hill 115-kV lines, in Montville and Norwich.  Staff Report.  Approved 2/25/91

PETITION NO.  249 - The Connecticut Light and Power Company petition for the proposed addition of a second 115-kV to 23-kV, 47 MVA transformer, and associated equipment within Hopewell 22R Substation, in Glastonbury.  Staff Report.  Approved 3/26/90

PETITION NO.  250 - The City of Norwich Department of Public Utilities petition for proposed modifications within the Tenth Street Substation, in Norwich.  Staff Report.  Approved 4/30/90

PETITION NO.  251 - Northeast Nuclear Energy Company petition for a steam generator replacement project building at Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 4/30/90

PETITION NO.  252 - The South Norwalk Electric Works petition for an electric generator at its State Street facility, in South Norwalk.  Staff Report.  Approved 5/21/90

PETITION NO.  253 - United Illuminating Company petition for a proposed addition at Pequonnock Substation, in Bridgeport.  Staff Report.  Approved 7/25/90

PETITION NO.  254 - Connecticut Yankee Atomic Power Company petition for the proposed reconstruction of a boat dock at Connecticut Yankee Nuclear Power Station, in Haddam.   Staff Report.  Approved 7/25/90

PETITION NO.  255 - The Connecticut Light and Power Company petition for a proposed addition to its 4C Substation, in Southington.  Staff Report.  Approved 8/22/90

PETITION NO.  256 - The Connecticut Light and Power Company petition for an addition to the 3R Substation, in Rocky Hill.  Staff Report.  Approved 8/22/90

PETITION NO.  257 - The Windham Energy Recovery Facility petition whether changes in operation would constitute a “modification” requiring a Certificate, in Windham. Voted not to Rule. 9/5/90

PETITION NO.  258 - The Connecticut Light and Power Company petition for proposed modifications to the Horton Cove Crossing of the Montville-Whipple Junction 115-kV transmission line, in Montville.  Staff Report.  Approved 9/26/90

PETITION NO.  259 - United Illuminating Company petition for temporary transformer installation project at Mix Avenue Substation, in Hamden.  Staff Report.  Approved 11/14/90

PETITION NO.  260 - Metro Mobile CTS of the Northeast, Inc., Metro Mobile CTS of Hartford, Inc., Metro Mobile CTS of New London, Inc., Metro Mobile CTS of New Haven, Inc., and Metro Mobile CTS of Fairfield County, Inc. petition to amend Section 16-50j-72 (c) of the Regulations of Connecticut State Agencies.  Staff Report.  Denied 11/14/90

PETITION NO.  261 - The Connecticut Light and Power Company petition for proposed modifications to the Glenbrook - South End - Waterside 115-kV transmission lines, in Stamford.  Staff Report.  Approved 11/14/90

PETITION NO.  262HW - Safety-Kleen Corp. petition for short-term storage of containerized hazardous waste on Community Avenue, in Plainfield.  Staff Report.  Approved 1/10/91

PETITION NO.  263 - The Connecticut Light and Power Company petition for modifications to the Sasco Creek Substation to Ely Avenue Junction 115-kV line, in Westport.  Staff Report.  Approved 2/15/91

PETITION NO.  264 - The Connecticut Light and Power Company petition for modifications to the Ely Avenue Junction of Glenbrook Substation 115-kV line, in Norwalk, Stamford, and Darien.  Staff Report.  Approved 3/11/91

PETITION NO.  265 - The Connecticut Light and Power Company petition for removal of 69-kV lattice towers in Rocky Hill, Cromwell, Berlin, and Middletown.  Staff Report.  Approved 2/11/91

PETITION NO.  266 - The Connecticut Light and Power Company petition for modifications to the Brookfield Junction to Stony Hill Substation 115-kV line, in Brookfield.  Staff Report.  Approved 3/11/91

PETITION NO.  267 - Northeast Nuclear Energy Company petition for two proposed Steam Generator Replacement Project Buildings at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 4/1/91

PETITION NO.  268 - The Connecticut Light and Power Company petition for a proposed addition to the Tomac Substation and an associated modification to a 115-kV transmission line, in Greenwich.  Staff Report.  Approved 4/18/91

PETITION NO.  269 - The Connecticut Light and Power Company petition for proposed modifications to Meekville Junction to South Windsor Junction 115-kV transmission line, in South Windsor.  Staff Report.  Approved 5/13/91

PETITION NO.  270HW - Ballast Disposal Incorporated petition for storage of fluorescent light ballasts and small electrical capacitors containing PCB’s, in Waterbury.   Staff Report.  Approved 5/13/91

PETITION NO.  271HW - Clean Harbors Inc. petition for a proposed transloading facility, in Plainfield. Withdrawn 7/24/91

PETITION NO.  272 - Northeast Utilities Service Company petition for proposed modifications to Barbour Hill Substation, Rockville Substation, and a 115-kV circuit from Barbour Hill Substation to Rockville Substation, in South Windsor and Vernon.  Staff Report.  Approved 7/16/91

PETITION NO.  273 - Yankee Gas Services Company petition for the proposed construction of natural gas regulating facilities associated with the Iroquois Gas Transmission System, L.P. sales meter station site at the intersection of Old Coram Road and Murphy’s Lane, in Shelton.  Staff Report.  Approved 7/31/91

PETITION NO.  274 - The Connecticut Light and Power Company petition for proposed modifications at two pole locations east of Circle Drive and two pole locations west of the intersection of Route 5 and Route 71, in conjunction with connecting the new Colony Substation to and existing CL&P Hanover to North Wallingford 115-kV transmission line, in Wallingford. Approved 9/18/91

PETITION NO.  275 - The Connecticut Light and Power Company petition for proposed modification at four pole locations, along two existing 115-kV transmission lines from Manchester Substation to Northwest Hartford Substation and Bloomfield Substation to Northwest Substation (circuits 1751 and 1756), west of Goodman Street and Lincoln Terrace on Cottage Grove Road, in Bloomfield.  Staff Report.  Approved 9/18/91

PETITION NO.  276 - Northeast Utilities Service Company petition for a transmission line interconnection between the Lisbon Resource Recovery facility, located on a 276 acre parcel owned by Philip C. Armetta, approximately 1,000 feet east of the intersection of Route 97 and 169, and an existing Connecticut Light and Power Company 115-kV electrical transmission line, in Lisbon.  Staff Report.  Approved 6/23/92

PETITION NO.  277 - The Connecticut Light and Power Company petition for the removal of unused 69-kV lattice steel towers along nine miles of right-of-way, in Thomaston and Litchfield.  Staff Report.  Approved 11/20/91

PETITION NO.  278 - Northeast Utilities Service Company and the City of Groton Department of Utilities petition for proposed modifications to existing 69-kV transmission lines and substations, in Montville, Ledyard, Preston, and Groton.  Staff Report.  Approved 1/6/92

PETITION NO.  279 - The Connecticut Light and Power Company petition for proposed modifications to a 115-kV transmission line from the Branford Substation to the North Haven Substation, in North Branford.  Staff Report.  Approved 12/11/91

PETITION NO.  280 - The United Illuminating Company petition for the proposed Bridgeport Viaduct Transmission Line Relocation Project, in Bridgeport.  Staff Report.  Approved 10/28/92

PETITION NO.  281 - Northeast Utilities Service Company petition for proposed modifications to the southwest Hartford-northwest Hartford 115-kV underground electric transmission line, for the Connecticut Department of Transportation to realign Route 44 (Albany Ave.) and Scarborough Street, in Hartford.  Staff Report.  Approved 4/1/92

PETITION NO.  282 - Concerned Citizens of Lisbon petition regarding wether the Certificate issued in Docket 110 to the Lisbon Resource Recovery facility, in Lisbon, remains applicable. Certificate remains applicable. 7/15/92

PETITION NO.  283 - Metro Mobile CTS of Hartford, Inc. petition for the installation of telecommunications antennas and other equipment on top of an existing building located at 155 Myrtle Street, in New Britain.  Staff Report.  Approved 6/23/92

PETITION NO.  284 - Metro Mobile CTS of Fairfield County, Inc. petition for the installation of cellular telecommunications antennas and associated equipment on an existing water tank located at 177 West Rocks Road, in Norwalk.  Staff Report.  Approved 7/15/92

PETITION NO.  285 - The Connecticut Light and Power Company (CL&P) petition for the proposed modification of an existing CL&P 345-kV line adjacent to the New Milford landfill west of Route 7, in New Milford.  Staff Report.  Approved 9/4/92

PETITION NO.  286 - The Connecticut Light and Power Company petition for proposed modifications to one 345-kV and one 115-kV line along Interstate Highway 291, in South Windsor and Manchester.  Staff Report.  Approved 9/4/92

PETITION NO.  287HW - Connecticut Treatment Corporation petition for proposed improvements at an existing hazardous waste facility located on Broderick Road, in Bristol.  Staff Report.  Approved 9/16/92

PETITION NO.  288 - Metro Mobile CTS of New Haven, Inc. petition for the installation of telecommunications antennas and associated equipment to a building at 20 Alexander Dr., in Wallingford.  Staff Report.  Approved 9/18/92

PETITION NO.  289 - The Connecticut Yankee Atomic Power Company petition for the proposed construction of a warehouse within the developed area of the Connecticut Yankee Nuclear Power Station, in Haddam.  Staff Report.  Approved 9/9/92

PETITION NO.  290 - The United Illuminating Company (UI) petition for reconductoring and reinsulating approximately 1.4 miles of 115-kV double circuit overhead transmission line situated along the northeast corridor railroad tracks from UI’s Milvon Substation to Devon Substation, in Milford.  Staff Report.  Approved 9/9/92

PETITION NO.  291 - The United Illuminating Company petition for the installation of an optical fiber ground wire system between Ash Creek Substation in Bridgeport and structure No. B714 on the railroad catenary system of the Northeast Railroad Corridor, in Fairfield.  Staff Report.  Approved 9/9/92

PETITION NO.  292 - Springwich Cellular Limited Partnership petition that no Certificate is required for the installation of cellular telecommunications antennas on top of the Southern New England Telephone Company building at 27 Butler Street,  in Meriden.  Staff Report.  Approved 10/14/92

PETITION NO.  293 - The Town of Middlefield petition prohibiting the Department of Public Safety, Division of State Police, or any agents of the State Police, from the construction, maintenance, and operation of a telecommunications tower atop Mount Beseck, in Middlefield. Denied 10/14/92

PETITION NO.  294HW - United Oil Recovery, Inc. petition for proposed improvements and activities to a facility located at 136 Gracey Avenue, in Meriden.  Staff Report.  Approved 12/2/92

PETITION NO.  295 - The United Illuminating Company petition for proposed modifications to the existing Derby Substation Rebuild Project located at Roosevelt Drive near the intersection of B Street, Derby, and to the existing Ansonia Substation, at 24 Franklin Avenue, Ansonia.  Staff Report.  Approved 12/16/92

PETITION NO.  296 - The Connecticut Light and Power Company petition for proposed modifications to a 115-kV transmission line located between the Rocky Hill Substation on West Street, Rocky Hill to the Berlin Substation on Beckley Road, in Berlin.  Staff Report.  Approved 12/2/92

PETITION NO.  297 - The Connecticut Light and Power Company petition for proposed modifications of the Devon Substation to Pease Road Junction 115-kV transmission line,  in Milford, Orange and Woodbridge.  Staff Report.  Approved 2/25/93

PETITION NO.  298 - Springwich Cellular Limited Partnership petition for the installation of telecommunications antennas at 52 East Center Street, in Manchester.  Staff Report.  Approved 2/11/93

PETITION NO.  299 - The United Illuminating Company petition for proposed modifications to an existing control/switchgear building at 324 Woodmont Road, in Milford.  Staff Report.  Approved 3/4/93

PETITION NO.  300 - The Northeast Utilities Service Company petition for a proposed office building at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 4/7/93

PETITION NO.  301 - The Northeast Utilities Service Company petition for a proposed fire training facility at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Approved 4/7/93 .

PETITION NO.  302 - The Connecticut Resources Recovery Authority petition for proposed changes in facility design, transfer of the Certificate, and compliance with conditions for waste fuel to the Lisbon Resource Recovery Facility, in Lisbon. Denied 4/22/93

PETITION NO.  303 - The Northeast Utilities Service Company petition for proposed modifications to the Baldwin Junction to Stevenson Substation 115-kV lines, in Middlebury.  Staff Report.  Approved 5/6/93

PETITION NO.  304 - Metro Mobile CTS of Fairfield County, Inc. petition for proposed installation of antennas on an existing water tank and construction of an equipment building off Black Rock Turnpike, in Fairfield. Approved 5/6/93

PETITION NO.  305 - Metro Mobile CTS of Fairfield County, Inc. petition for proposed installation of antennas on an existing water tank and construction of an equipment building off Filbert Street, in Norwalk.  Staff Report.  Approved 5/6/93

PETITION NO.  306 - Metro Mobile CTS of Hartford, Inc. petition for proposed installation of antennas and associated equipment on an existing building at 129 Coles Road, in Cromwell.  Staff Report.  Approved 6/8/93

PETITION NO.  307 - Metro Mobile CTS of Hartford, Inc. petition for proposed installation of antennas and an equipment room within the American School for the Deaf, 139 North Main St., in West Hartford.  Staff Report.  Approved 8/23/93

PETITION NO.  308 - Springwich Cellular Limited Partnership petition for a declaratory ruling that no Certificate is required for the replacement of an existing communications tower and equipment building and for the installation of cellular antennas on the replacement tower located in Oxford.  Staff Report.  Approved 6/6/94

PETITION NO.  309 - Connecticut Resource Recovery Authority petition for rulings concerning the notice of intent to commence construction filed by Riley Energy Systems of Lisbon, Inc.  Staff Report.  Council felt issues raised by CRRA were moot given Council action dated 10/4/93. 10/20/93

PETITION NO.  310HW - Safety-Kleen Corporation petition for a declaratory ruling that no Certificate is required for proposed changes at its existing facility located at 24 Brixton Street, in West Hartford, (March 17, 1997).  Staff Report.  Approved 4/2/97

PETITION NO.  310HW - Safety-Kleen Corp., petition that no Certificate is required for proposed changes at its existing facility located at 24 Brixton Street, in West Hartford.  Approved 7/14/93 5/10/95 5/4/96

PETITION NO.  311 - Metro Mobile petition that no Certificate is required for the proposed installation of antennas on an existing wind power tower at 80 Lonetown Road, in Redding.  Staff Report.  Approved 11/9/93

PETITION NO.  312 - Iroquois Gas Transmission System and Iroquois Pipeline Operating Company petition for construction of a lateral line from the Iroquois main line to the Connecticut Light and Power Company Devon Generating Station, in Milford.  Staff Report.  Approved 1/12/94

PETITION NO.  313 - Northeast Utilities Service Company petition for proposed addition of gas-firing capability at Devon Station Units 7 and 8, in Milford.  Staff Report.  Approved 1/12/94

PETITION NO.  314 - Springwich cellular Limited Partnership petition for installation of a new monopole and cellular antennas at an existing tower site off Willis Street, in Bristol.  Staff Report.  Approved 12/15/93

PETITION NO.  315 - Northeast Utilities Service Company petition for proposed additions to the Uncasville Substation off Haley Road, in Montville.  Staff Report.  Approved 1/12/94

PETITION NO.  316 - Springwich Cellular Limited Partnership petition for the proposed addition of antennas to an existing tower at 975 Mix Avenue, in Hamden.  Staff Report.  Approved 1/12/94

PETITION NO.  317 - City of Norwich Department of Public Utilities petition for replacement of equipment at Dudley Street Substation, in Norwich.  Staff Report.  Approved 3/11/94

PETITION NO.  318 - Metro Mobile CTS of Hartford, Inc. petition for installation of panel antennas on a steel pole at 133 Coles Road, in Cromwell.  Staff Report.  Denied 4/18/94

PETITION NO.  319 - Metro Mobile CTS of New Haven, Inc. petition for installation of cellular antennas, support pole and associated equipment off Route 8 on land owned by the Hamden Sand and Gravel Company, in Beacon Falls.  Staff Report.  Denied 4/18/94

PETITION NO.  320 - Metro Mobile CTS of New Haven, Inc. petition for the installation of cellular antennas, support pole, and associated equipment at 921 East Main Street, in Meriden.  Staff Report.  Approved 4/18/94

PETITION NO.  321 - Metro Mobile CTS of Hartford, Inc., Metro Mobile CTS of Fairfield County, Inc., Metro Mobile CTS of New Haven, Inc., Metro Mobile CTS of New London, Inc., and Metro Mobile CTS of Windham, Inc., petition for a declaratory ruling that a low-power microcell installed completely within an existing building is not subject to Council jurisdiction.  Staff Report (with Petition 323 Staff Report).  Approved 9/19/94

PETITION NO.  322 - Metro Mobile CTS of Hartford, Inc. petition for installation of cellular antennas, support pole, and associated equipment at 133 Coles Road,  in Cromwell.  Staff Report.  Approved 5/23/94

PETITION NO.  323 - Metro Mobile CTS of Hartford, Inc. and Metro Mobile CTS of Fairfield County, Inc. petition for installation of low-power microcells completely within existing Bell Atlantic Stores at 71 Newtown Road, in Danbury; 82 Buckland Street, in Manchester; and at 48 Westport Ave, in  Norwalk.  Staff Report (with Petition 321 Staff Report).  Approved 6/6/94

PETITION NO.  324 - Metro Mobile CTS of Hartford, Inc. petition for proposed installation of cellular antennas on an existing building at 886 Main, in East Hartford.  Staff Report.  Approved 8/9/94

PETITION NO.  325 - Metro Mobile CTS of Hartford, Inc. petition for proposed installation of antennas on an existing building at 590 Asylum Street, in Hartford.  Staff Report.  Approved 8/9/94

PETITION NO.  326 - Springwich Cellular Limited Partnership petition to replace an existing tower and install antennas on the replacement tower at the University of Connecticut Health Center, 263 Farmington Avenue,  in Farmington.  Staff Report.  Approved 7/26/94

PETITION NO.  327 - Metro Mobile CTS of Hartford, Inc., petition for a declaratory ruling on the need to obtain a Certificate of Environmental Compatibility and Public Need is required for the proposed installation of cellular antennas and associated equipment on an existing chimney stack on a building located at 2 Ferry Place, in Old Saybrook.  Staff Report.  Approved 8/9/94

PETITION NO.  328 - Metro Mobile CTS of Hartford, Inc., petition for a declaratory ruling on the need to obtain a Certificate for the proposed installation of cellular antennas and associated equipment on and adjacent to an existing repair/office building located at Pilot’s Point Marina, South Yard, Building #4, 63 Pilot’s Point Drive, in Westbrook.  Staff Report.  Approved (No Certificate Required) 8/9/94

PETITION NO.  329 - Metro Mobile CTS of New Haven, Inc., petition for a declaratory ruling that no Certificate is required for the proposed installation of cellular telephone antennas and associated equipment on an existing building located at 153 Forbes Avenue, in New Haven.  Staff Report.  Approved 8/30/94

PETITION NO.  330 - Metro Mobil CTS of New Haven petition for the installation of a microcell in a communications store, in Orange. Withdrawn 9/21/94

PETITION NO.  331 - Northeast Utilities Service Company petition for proposed modifications to existing transmission line towers at the Thames River in Montville, and at the Housatonic River in the Towns of Stratford and Milford.  Staff Report.  Approved 10/20/94

PETITION NO.  332HW - Envirite Corporation petition for a declaratory ruling that Approved of Public Safety and Necessity is required for certain changes at its existing facility located at 198 Old Waterbury Road, in Thomaston.  Staff Report.  Approved 11/1/94

PETITION NO.  333 - Metro Mobile CTS of Fairfield County, Inc. petition for a declaratory ruling that no Certificate is required for the installation of cellular telecommunications antennas and equipment on an existing five-story storage/warehouse building located at 370 West Main Street, in Stamford.  Staff Report.  Petition not CSC Jurisdiction -  10/20/94

PETITION NO.  334 - Metro Mobile CTS of Fairfield County, Inc. petition for proposed installation of cellular antennas and equipment on the Danbury Hilton Hotel at 18 Old Ridgebury Road, in Danbury.  Staff Report.  Approved 10/20/94

PETITION NO.  335 - Department of Public Safety, Division of State Police petition for the proposed replacement of an existing tower at 76 Tower Road,  in Brookfield.  Staff Report.  Denied 10/28/94

PETITION NO.  336 - Northeast Utilities Service Company petition for proposed modifications to the Black Pond Junction to Connecticut Yankee 345-kV line, in Haddam.  Staff Report.  Approved 12/5/94

PETITION NO.  337 - The Connecticut Light and Power Company petition for modifications to existing 115-kV transmission lines at Stony Hill Substation, in Brookfield.  Staff Report.  Approved 2/9/95

PETITION NO.  338HW - Logano Transportation Company, Inc. petition for a declaratory ruling that no Certificate is required for a proposed recycling facility at 203 Pickering Street, in Portland.  Staff Report.  Approved 4/25/95

PETITION NO.  339 - The Connecticut Light and Power Company petition that no Certificate is required for placement of a fiber optic shield wire and certain structural changes along several 115-kV and 345-kV transmission corridors in Connecticut.  Staff Report.  Approved 7/6/95

PETITION NO.  339A - Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for installation of a fiber optic cable and associated structural changes along several 115-kV and 345-kV transmission corridors in the Towns of Berlin, Bethany, Cheshire, Hamden, Meriden, Milford, Orange, Wallingford, and Woodbridge, Connecticut. Request for Amendment.  Staff Report.  Approved 4/2/98

PETITION NO. 339B - Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for installation of a fiber optic cable and associated structural changes along several 115-kV and 345-kV transmission corridors in the City of Norwalk, and Towns of Middletown and Berlin.   Staff Report.  Approved 10/8/98

PETITION NO. 339C - Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for installation of a fiber optic cable and associated structural changes along several 115-kV and 345-kV transmission corridors in Connecticut.  Staff Report. Approved 12/17/98

PETITION NO. 339D - Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for installation of a fiber optic cable and associated structural changes along several 115-kV and 345-kV transmission corridors in Connecticut.  Staff Report.  Approved 4/25/02

PETITION NO.  340 - The Connecticut Light and Power Company petition that no Certificate is required for the proposed modifications to the 115-kV lines between South End Substation and Glenbrook Substation, in Stamford.  Staff Report.  Approved 7/6/95

PETITION NO.  341HW - Logano Transportation Co., Inc., petition that no Certificate is required for short-term storage of fluorescent light ballasts and small electrical capacitors at its existing facility located at 203 Pickering Street, in Portland.  Staff Report.  Approved 6/20/94

PETITION NO.  342 - Arlene Barra petition for a declaratory ruling regarding the Council’s acknowledgment of a notice of intent to modify an existing telecommunications tower and associated equipment at 76 Tower Road, in Brookfield.  Findings of Fact.   Opinion.  Withdrawn 11/14/95

PETITION NO.  343 - Springwich Cellular Ltd. Partnership petition that no Certificate is required for the replacement of an existing communications tower and for the installation of cellular antennas on the replacement tower located at 55 Walls Drive, in Fairfield.  Staff Report.  Approved 10/10/95

PETITION NO.  344 - CL&P petition that no Certificate is required for a proposed addition to the CL&P’s Canton Substation, in Canton.  Staff Report.  Approved 11/15/95

PETITION NO.  345 - The Connecticut Light and Power Company petition that no Certificate is required for a proposed rebuild of Connecticut Light and Power Company’s Compo Substation, in Westport.  Opinion.  Approved 2/8/86

PETITION NO.  346 - The Connecticut Light and Power Company petition that no Certificate is required for a proposed temporary installation of a mobile transformer and associated equipment in the Sasco Creek Substation, in Westport. Staff Report.  Approved 2/8/86

PETITION NO.  347 - The Connecticut Light and Power Company petition for proposed modifications to the Cook Hill Junction to Wallingford Junction 115-kV-transmission line in the Towns of Cheshire and Wallingford.  Staff Report.  Approved 3/13/96

PETITION NO.  348 - The Connecticut Light and Power Company petition for proposed modifications to the Cook Hill Junction to Glen Lake Junction 115-kV transmission line, in Cheshire and Hamden.  Staff Report.  Approved 3/13/96

PETITION NO.  349 - The Connecticut Light and Power Company petition for the modification to the 115 kV lines beween North Wallingford Substation and Schwab Junction, in Wallingford.  Staff Report.  Approved 3/13/96

PETITION NO.  350 - Cellco Partnership petition that for the construction of an upgraded telecommunications tower at the Groton Police Headquarters, Groton Long Point Road, in Groton.  Staff Report.  Denied 3/28/96

PETITION NO.  351 - The Connecticut Light and Power Company petition for proposed modifications to the Barbour Hill to Enfield 115-kV line, in East Windsor.  Staff Report.  Approved 5/9/96

PETITION NO.  352 - The Connecticut Light and Power Company petition that no Certificate is required for the emergency installation of four gas turbine generating units at Devon Station, in Milford.  Staff Report 1.   Staff Report 2.  Findings of Fact.  Opinion.  Decision & Order.  Approved 6/30/97

PETITION NO.  353 - The Minnesota Methane, L.L.C. petition that no Certificate is required for a 1630 kW electric generating unit powered by landfill gas to be located adjacent to the Yaworski Regional Sanitary Landfill, in Canterbury.  Findings of Fact.  Opinion.  Decision & Order.  Denied 8/28/96

PETITION NO.  354 - The Connecticut Light and Power Company petition that no Certificate is required for the emergency installation of one gas turbine generating unit, a step-up power transformer, and a 115-kV tap to the South Meadow-Bloomfield transmission line at South Meadow Station, in Hartford.  Staff Report.  Findings of Fact.  Opinion.  Decision & Order.  Approved 5/21/96 Reopen Record 6/30/97

PETITION NO.  355 - Cellco Partnership d/b/a Bell Atlantic NYNEX Mobile petition that no Certificate is required for the installation of certain telecommunications antennas, the construction of a second equipment building and the installation of an emergency generator and fuel tank at BANM’s existing telecommunications facility on land of the Connecticut Water Company, off South Street, in Vernon.  Staff Report.  Approved 6/18/96

PETITION NO.  356 - The United Illuminating Company petition that no Certificate is required for the relocation and change of ten transmission line towers on the existing Pequonnock to Ash Creek and Pequonnock to Darien 115-kV lines to accommodate an I-95 highway reconstruction project, in Bridgeport.  Staff Report.  Approved 7/2/96

PETITION NO.  357 - The Connecticut Light and Power Company petition that no Certificate is required for the proposed addition of gas-firing capability to CL&P’s Middletown Station, in Middletown.  Staff Report.  Approved 8/8/96

PETITION NO.  358 - The Connecticut Light and Power Company petition that no Certificate is required for proposed modification to existing transmission line towers in Hartford and East Hartford.  Staff Report.  Approved 8/8/96

PETITION NO.  359 - The Connecticut Light and Power Company petition that no Certificate is required for proposed modifications to the East New Britain - Newington - Farmington 115-kV electric transmission line, in Newington.  Staff Report.Approved 9/9/96

PETITION NO.  360 - Minnesota Methane, L.L.C. petition that no Certificate is required for a 1630-kW electric generating unit to be powered by landfill gas located adjacent to the Town of Manchester Landfill, in Manchester.  Staff Report.  Approved 9/30/96

PETITION NO.  361 - CL&P petition that no Certificate is required for the modification of one structure located off Jobs Hill Road, in Somers, on the Ludlow, Massachusetts to Meekville Junction 345-kV electric transmission line.  Staff Report.  Approved 11/21/96

PETITION NO.  362 - CL&P petition that no Certificate is required for the modification of a 115-kV electric transmission line extending from North Bloomfield Substation to the Silver and Agawam Substations, in Agawam, Massachusetts.  Staff Report.  Approved 1/22/97

PETITION NO.  363 - The Connecticut Light and Power Company petition that no Certificate is required for proposed additions to CL&P's Southington Substation, in Southington.  Staff Report.  Approved 11/21/96

PETITION NO.  364 - CL&P petition that no Certificate is required for proposed additions to the CL&P’s Montville Substation, in Montville.  Staff Report.  Approved 11/21/96

PETITION NO.  365 - CL&P petition that no Certificate is required for proposed additions to the CL&P’s Manchester Substation, in Manchester.  Staff Report.  Approved 11/21/96

PETITION NO. 366 - Central Connecticut State University (CCSU) petition that no Certificate is required to modify an existing rooftop tower on the top of Vance Hall within the CCSU Campus, in New Britain.  Staff Report.  Approved 11/21/96

PETITION NO.  367 - Connecticut Light and Power Company (CL&P) petition that no Certificate is required for a proposed addition to CL&P’s Glenbrook Substation, in Stamford.  Staff Report.  Approved 2/5/97

PETITION NO.  368 - Connecticut Light and Power Company (CL&P) petition that no Certificate is required for a proposed addition to CL&P’s Frost Bridge Substation, in Watertown.  Staff Report.  Approved 2/5/97

PETITION NO. 369 - Connecticut Light and Power Company (CL&P) petition that no Certificate is required for a proposed addition to CL&P’s Waterside Substation, in Stamford.  Staff Report.  Approved 2/5/97

PETITION NO.  370 - CL&P petition that no Certificate is required for a proposed addition to CL&P’s Darien Substation, in Darien.  Staff Report.  Approved 2/5/97

PETITION NO.  371 - Sprint PCS petition that no Certificate is required for proposed modifications to the Manchester-North Bloomfield-Northwest Hartford High voltage transmission line, in Windsor.  Staff Report.  Approved 4/23/97

PETITION NO.  372HW - Uniroyal Chemical Company petition for a declaratory ruling that no Certificate is required for changes to the existing Uniroyal Chemical facility, in Naugatuck. Staff Report.  Approved 6/3/97

PETITION NO.  373 - The Connecticut Light and Power Company petition that no Certificate is required for proposed modifications to the Wawecus Junction to Bean Hill 115-kV lines, in Norwich.  Staff Report.  Approved 6/16/97

PETITION NO.  374 - Cellco Partnership d/b/a Bell Atlantic NYNEX Mobile petition that no Certificate is required for the modification of an existing telecommunications facility at an Amoco gasoline station, 921 East Main Street, in Meriden. Staff Report.  Approved 6/16/97

PETITION NO.  375 - Cellco Partnership d/b/a Bell Atlantic NYNEX Mobile petition that no amendment to the Certificate (Docket No. 139) is required to accommodate tower sharing at an existing telecommunications facility located off of Forbes Street, in East Hartford.  Staff Report.  Approved  6/16/97

PETITION NO.  376 - Hamilton Standard Division of United Technology Corporation (Hamilton Standard) petition that no Certificate is required for modification of an existing emergency generating system at Hamilton Standard’s Data Center, in Windsor Locks.  Staff Report.  Approved 6/30/97

PETITION NO.  377 - The United Illuminating Company (UI) petition that no Certificate is required for modifications to United Illuminating’s Bridgeport Harbor Station for constructing a 520 MW combined cycle gas turbine generating project, in Bridgeport.  Findings of Fact.  Opinion.  Decision & Order.  Approved 8/6/97

PETITION NO. 377A - Bridgeport Energy, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the approval modification in Petition No. 377 for the existing Bridgeport Harbor Station 520 MW combined cycle gas turbine generating facility, in Bridgeport, Connecticut.  RecordFindings of FactOpinionDecision and OrderApproved 4/28/11. 

PETITION NO.  378 - Aetna Life Insurance Company petition that no Certificate is required for the installation of emergency generating devices at their offices at 1000 Middle Street, in Middletown, and 570 Pigeon Hill Road, in Windsor.  Staff Report.  Approved 7/16/97.  Approved modification 12/19/00.  Amendment Approved 03/13/07.

PETITION NO.  379 - Northeast Utilities Service Company petition that no Certificate is required for the proposed removal and replacement of the Unit 1 oil, diesel, and jet fuel tank facility at the Millstone Nuclear Power Station, in Waterford.  Staff Report.  Conditionally Approved 8/20/97

PETITION NO.  380HW - Logano Transportation Co., Inc. petition that no Certificate is required for the management of hazardous and non-hazardous wastes in approved DOT containers to a transfer facility located at 203 Pickering Street, in Portland.  Staff Report.  Approved 9/10/97

PETITION NO.  381 - Southern Connecticut Gas Company petition that no Certificate of Environmental Compatibility and Public Need is required for a distribution line to transport natural gas to the Bridgeport Harbor Station.  Findings of Fact.   Opinion.   Decision & Order.  Approved 11/12/97

PETITION NO.  382HW - Advanced Environmental Technical Services (AETS) petition that no Certificate of Public Safety and Necessity is required for short-term storage of hazardous waste at 60 Peter Court, in New Britain.  Staff Report.  Approved 11/19/97

PETITION NO.  383 - Sprint PCS petition that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to a Connecticut Light and Power (CL&P) 115-kv electric transmission line support structure, in Fairfield.  Staff Report.  Findings of Fact.  Opinion.  Decision & Order.  Approved 12/18/97

PETITION NO.  384 - Sprint PCS petition regarding the applicability of Connecticut General Statutes § 16-50i (a).  Opinion.  Denied 12/10/97

PETITION NO.  385 - The Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for the proposed temporary installation of a transmission line tap, mobile transformer, and associated equipment on the south side of an existing electric transmission line approximately 1500 feet west of Hopmeadow Street, in Simsbury.  Staff Report.  Approved 1/8/98

PETITION NO.  386 - Sprint Spectrum L.P. d/b/a Sprint PCS petition that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to a Connecticut Light and Power Company high-voltage electric transmission line support structure (#924) located approximately 800 feet east of the intersection of Timber Mill Lane and Weston Road (Rt. 57), in Weston.  Staff Report.  Findings of Fact.  Opinion and Decision & Order.  Approved 1/22/98

PETITION NO.  387 - Cellco Partnership d/b/a Bell Atlantic Mobile petition for declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required to replace an existing telecommunications tower and accommodate tower sharing located at 281 Woodhouse Road, in Fairfield.  Staff Report.  Approved 3/16/98

PETITION NO.  388 - The Town of Wallingford petition that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to the Electric Division’s East Street (13M) Substation, in Wallingford.  Staff Report 1.   Staff Report 2.  Approved 4/2/98

PETITION NO.  389 - Iroquois Gas Transmission System, L.P. Petition that no Certificate of Environmental Compatibility and Public Need is required for an extension to the Iroquois natural gas pipeline in Shelton and Stratford, Connecticut. Decision.   Staff Report.  Approved 4/9/98

PETITION NO. 390 - Southern New England Telephone (SNET) Personal Vision Petition for a Declaratory Ruling and/or notice to modify an existing facility site for the placement of additional telecommunications antennas located at Five West Service Road, Hartford, Connecticut.  Staff Report.  Approved 7/23/98

PETITION NO.  391 - United Illuminating Company Petition that No Certificate of Environmental Compatibility and Public Need is necessary to replace certain structures on United Illuminating’s 115-kV Mix-Glen Lake overhead transmission line located in Hamden, Connecticut.  Staff Report.  Approved 5/28/98

PETITION NO. 392 - Algonquin Gas Transmission Company Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to install a 1.5 mile extension of Algonquin Gas Transmission Company’s E-System Loop located in Norwich and Montville, Connecticut.  Staff Report.  Approved  6/11/98

PETITION NO. 393 - Sprint PCS Petition that no Certificate of Environmental Compatibility and Public Need is required to modify an existing electric transmission line structure located adjacent to 63 Myrtle Avenue, Stamford, Connecticut.  Staff Report.  Approved  6/25/98

PETITION NO. 394 - Springwich Cellular Limited Partnership (Springwich) Petition for a Declaratory Ruling that no Amendment to the Certificate of Environmental Compatibility and Public Need is required to replace the existing tower and expand the site boundaries to accommodate tower sharing at an existing telecommunications facility located on 20 Post Office Lane in Westport, Connecticut. Staff Report.  Findings of Fact.   Opinion.   Decision & Order.  Approved 8/25/98

PETITION NO. 395 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#2997), located in the parking lot of the Wilton Railroad Station near the intersection of Route 7 and Route 33 in Wilton, Connecticut.  Staff Report.  Approved 7/9/98

PETITION NO. 395A - T-Mobile Northeast LLC (T-Mobile) request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to relocate an existing T-Mobile facility attached to an Eversource electric transmission line structure (#2997) onto an approved replacement electric transmission line structure (#2997) within the existing Eversource right-of-way located in the parking lot of the Wilton Railroad Station near the intersection of Route 7 and Route 33 (Old Station Road a/k/a 15 Old Danbury Road) in Wilton, Connecticut. Approved 09/15/16

PETITION NO. 396 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#6076) located near the intersection of Route 161 and I-95 (Exit 74) off of King Arthur Drive, East Lyme, Connecticut.  Staff Report.  Approved 7/9/98

PETITION NO. 397 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#1041) located off of Noroton Road to Heights Road, near the Noroton Heights Railroad Station in Darien, Connecticut.  Staff Report.  Approved 7/9/98

PETITION NO. 398 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#2983) located off of Route 7 and Pimpewauge Road in Wilton, Connecticut.  Staff Report.  Approved 7/23/98

PETITION NO. 399 - Sprint PCS Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to a Connecticut Light and Power (CL&P) 115-kV electric transmission line support structure no. 1281 located off of Sound Shore Drive in Greenwich, Connecticut.  Staff Report.  Approved 7/23/98

PETITION NO. 400 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to a Connecticut Light and Power (CL&P) high voltage transmission line structure located off Rocky Hill Road in Trumbull, Connecticut.  Staff Report.  Approved 7/23/98

PETITION NO. 401 - Hartford Steam Company Petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for replacement of two gas turbines with one gas turbine and an auxiliary boiler at the Hartford Hospital cogeneration facility, Hartford, Connecticut.  Staff Report.  Approved 9/24/98

PETITION NO. 402 - Cellco Partnership d/b/a Bell Atlantic Mobile Petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need (Docket No. 89) is required to replace the existing tower and expand the site boundaries to accommodate tower sharing at an existing telecommunications facility located at the Interstate 84-Route 34 interchange in Newtown, Connecticut.  Staff Report.  Approved 9/24/98

PETITION NO. 403 - Sprint PCS Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the placement of a Fort Worth Tower Power Mount telecommunications pole on an existing Connecticut Light & Power high-voltage electric transmission line support structure located off of Pent Road in Beacon Falls, Connecticut.  Staff Report.  Approved 11/5/98

PETITION NO. 404 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#2384) located off of Johnson Road at the Oak Lane Country Club Association in Woodbridge, Connecticut.  Staff Report.  Approved 12/17/98

PETITION NO. 405 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#1321) located off of Chapel Road in Stratford, Connecticut.  Staff Report.  Approved 12/17/98

PETITION NO. 406 - Omnipoint Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure (#860) located off of Oxbrook Road and Travis Drive in Bridgeport, Connecticut.  Staff Report.  Approved 12/17/98

PETITION NO. 407 - Connecticut Light & Power Company Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications at the Norwalk substation located on New Canaan Avenue in Norwalk, Connecticut.  Staff Report.  Approved 12/17/98

PETITION NO. 408 - United Illuminating Company Petition that no Certificate of Environmental Compatibility and Public Need is required for modifications to the Hawthorne Substation facility in Fairfield, Connecticut.  Staff Report.  Approved 12/17/98

PETITION NO. 409 - CoxCom, Inc. d/b/a Cox Communications Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for two earth station satellite dish antennas at 170 Utopia Road in Manchester, Connecticut.  Staff Report.  Approved 2/7/99

PETITION NO. 410 - Hull Forest Products, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction and operation of a 1,200 kW electric generating facility to replace two backup generators located at an existing sawmill plant in Pomfret, Connecticut.  Staff Report.  Approved 3/24/99

PETITION NO. 411 - Springwich Cellular Limited Partnership petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure located off 155 Harvest Ridge Road in Stratford, Connecticut.  Staff Report.  Approved 7/29/99

PETITION NO. 412 - Springwich Cellular Limited Partnership petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required to modify a Connecticut Light & Power high-voltage electric transmission line support structure located off 17 Daybreak Lane in Shelton, Connecticut.  Staff Report.  Approved 3/24/99

PETITION NO. 413 - Iroquois Gas Transmission System, L.P. petition that no Certificate of Environmental Compatibility and Public Need is required for the installation of ground beds adjacent to the existing natural gas pipeline located in the Towns of Sherman and Shelton, Connecticut.  Staff Report.  Approved 7/15/99

PETITION NO. 414 - Comcast Cable Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a receive-only satellite dish antenna on the roof of an existing building located at 630 Chapel Street in New Haven, Connecticut.  Staff Report.  Approved 4/27/99

PETITION NO. 415 - Lake Road Generating Company, L.P. petition that no Certificate of Environmental Compatibility and Public Need is required for the installation of the proposed electric interconnection transmission line tap with an existing 345 kV Card Street-Sherman Road electric transmission line in Killingly, Connecticut.  Staff Report.  Approved 5/24/99

PETITION NO. 416 - Algonquin Gas Transmission Company petition that no Certificate of Environmental Compatibility and Public Need is required for the 1.8 mile extension of the proposed electric interconnection interstate natural gas transmission line in the Towns of Putnam and Killingly, Connecticut.  Staff Report 1.   Staff Report 2.  Approved 7/23/99, Reconsidered 8/16/99

PETITION NO. 417HW - Circle of Life, LLC petition that no Certificate of Public Safety and Necessity is required to treat non-RCRA/non-hazardous contaminated soils at its facility located at 158 Middletown Avenue in New Haven, Connecticut.  Staff Report.  Approved 5/25/99

PETITION NO. 418 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for temporary placement of meter-reading equipment in the Town of Stratford, Connecticut.  Staff Report.  Approved 7/15/99

PETITION NO. 419 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification to an existing Connecticut Light & Power high-voltage electric transmission line support structure located on Chestnut Hill Road in Wilton, Connecticut.  Staff Report.  Approved 7/15/99

PETITION NO. 420 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification to an existing Connecticut Light & Power high-voltage electric transmission line support structure located off Mechanic Street in Darien, Connecticut.  Staff Report.  Approved 7/15/99

PETITION NO. 421 - Bell Atlantic Mobile petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a telecommunications tower disguised as an agricultural silo located at Lockwood Farm in Hamden, Connecticut.  Staff Report.  Denied 7/15/99

PETITION NO. 422 - Wisvest-Connecticut, LLC petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a new electrical switchyard at Bridgeport Harbor Station in Bridgeport, Connecticut.  Staff Report.  Approved 8/16/99

PETITION NO. 423 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification to an existing Connecticut Light & Power high-voltage electric transmission line support structure located between Maple Ridge Road and New Britain Avenue in Farmington, Connecticut.  Staff Report.  Approved 8/16/99

PETITION NO. 424 - Wisvest-Connecticut, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of an electrical switchyard at New Haven Harbor Station, 1 Waterfront Street in New Haven, Connecticut.  Staff Report.  Approved 8/16/99

PETITION NO. 425 - City of Norwich Department of Public Utilities petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for an upgrade of equipment at the Dudley Street Substation located on Dudley Street in Norwich, Connecticut.  Staff Report.  Approved 8/31/99

PETITION NO. 426HW - Uniroyal Chemical Company, Inc. petition that no Certificate of Public Safety and Necessity is required to close certain hazardous waste container storage areas and refurbish a hazardous waste storage building located at 280 Elm Street in Naugatuck, Connecticut.  Staff Report.  Approved 8/31/99

PETITION NO. 427 - Aetna Life Insurance Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation and operation of emergency back-up electric generating devices at the Aetna Life Insurance Company, 151 Farmington Avenue in Hartford, Connecticut.  Staff Report.  Approved 8/31/99

PETITION NO. 428 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification of the Middle River electric substation off Middle River Road in Danbury, Connecticut.   Staff Report.  Approved 10/8/99

PETITION NO. 429 - PDC-El Paso Milford, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of an electric interconnection transmission line between the Milford Power Project located off Oronoque Road and the Devon substation at Naugatuck Avenue in Milford, Connecticut.  Staff Report.  Approved ONLY the upgrades to the substations 10/8/99; Approved interconnection 11/9/99.

PETITION NO. 430 - Crown Atlantic Company LLC petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for modifications, and for an order to approve tower sharing, at an existing telecommunications facility located off North Main Street in Marlborough, Connecticut. (Docket No. 169).   Staff Report. Approved 10/8/99

PETITION NO. 431 - Sprint PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification to an existing Connecticut Light & Power electric transmission facility located at 705 Andrews Street in Southington, Connecticut.  Staff Report.  Approved 10/8/99

PETITION NO. 432 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to and placement of telecommunications antennas on an existing Connecticut Department of Transportation electric transmission structure located at the Westport Metro-North Rail Station on Ferry Lane in Westport, Connecticut.  Staff Report.  Approved 10/21/99

PETITION NO. 433 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for removal of the East Main Street Substation at 165 East Main Street and modification of the existing Congress Street Substation located at 55 Congress Street in Bridgeport, Connecticut.  Staff Report.  Approved 11/9/99

PETITION NO. 434 - Crown Atlantic Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to and placement of telecommunications antennas on an existing telecommunications facility located on Turkey Hill Road in Haddam, Connecticut. (Docket No. 58 and EM-CROWN-061-990927).  Staff Report.  Approved 10/21/99

PETITION NO. 435 - Crown Atlantic Company LLC petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for modifications, and for an order to approve tower sharing, at an existing telecommunications facility located off Oliver Road in Enfield, Connecticut. (Docket No. 139).  Staff Report.  Approved 10/21/99

PETITION NO. 436 - Crown Atlantic Company LLC petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for modifications, and for an order to approve tower sharing, at an existing telecommunications facility located off Ogg Meadow Road in Orange, Connecticut. (Docket No. 177).  Staff Report.  Approved 10/21/99 .

PETITION NO. 437 - United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications facilities associated with a remote network meter reading system within UI's service area.  Staff Report.   Approved nine of eleven sites 11/9/99. Reconsideration of the Woodbridge site. Approved 3/22/00. Reconsidered and Approved Ansonia site 8/10/00.

PETITION NO. 438 - United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of transmitters and receivers associated with a remote network meter reading system within UI's service area.  Staff Report.  Approved 11/9/99.

PETITION NO. 439 - Farmington River Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of the Black Rock - Burrit electric transmission line located on West Main Street and Corbin Avenue in New Britain.  Staff Report.  Approved 12/8/99

PETITION NO. 440 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification to an existing Connecticut Light and Power high-voltage electric transmission line support structure located at Whitney Avenue (Route 10) in Hamden.  Staff Report.  Approved 12/8/99

PETITION NO. 441 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification to an existing Connecticut Light and Power high-voltage electric transmission line support structure located between Route 7 and Mountain Road in Redding.  Staff Report.  Approved 12/8/99

PETITION NO. 442 - Tennessee Gas Pipeline Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of main line regulation in East Granby and the installation of an additional connection at the Southern Connecticut-Milford delivery point in Orange. Staff Report.   Approved 12/20/99

PETITION NO. 443 - AT&T Wireless PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power high-voltage electric transmission line support structure (no. 1292) located at Sound Shore Drive (Cos Cob) in Greenwich.  Staff Report.  Approved 2/2/00.

PETITION NO. 443A - AT&T request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power high-voltage electric transmission line support structure (no. 1292) located at Sound Shore Drive (Cos Cob) in Greenwich, Connecticut. Decision Letter and Staff ReportTemporary Tower Decision LetterApproved 12/10/15.

PETITION NO. 443B - AT&T request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power high-voltage electric transmission line support structure (no. 1292) located at Sound Shore Drive (Cos Cob) in Greenwich, Connecticut and for the installation of a temporary telecommunications facility at 1 River Road in Greenwich, Connecticut.  Approved 07/07/16.

PETITION NO. 444 - Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located between Meriden-Waterbury Turnpike (State Route 322) and Rahlene Drive in Southington.  Staff Report.  Approved 4/12/00.

PETITION NO. 445 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a power transformer and associated equipment at the Newtown Substation located on Main Street (Route 25) in Newtown.  Staff Report.  Approved 3/1/00.

PETITION NO. 446 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located off Will Russ Court in Norwalk, Connecticut.  Staff Report.  Approved 4/12/00.

PETITION NO. 447- City of Norwich Department of Public Utilities petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for an upgrade of equipment at the Bean Hill Substation, 20 Connecticut Avenue in Norwich.  Staff Report.  Approved 3/22/00.

PETITION NO. 448 - Springwich Cellular Limited Partnership petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need (Docket No. 75) is required for the modification of an existing telecommunications facility located at 39 West Street in Danbury.  Staff Report.  Approved 4/12/00.

PETITION NO. 449 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power telecommunications facility located west of Willis Street on South Mountain in Bristol.  Findings of Fact.   Opinion.   Decision & Order.  Denied 6/7/00.

PETITION NO. 450 - Iroquois Gas Transmission System, L.P. petition that no Certificate of Environmental Compatibility and Public Need is required for the installation of a ground bed adjacent to an existing interstate natural gas pipeline located in Newtown (Docket No. 134 and 134C).  Staff Report.  Approved 4/12/00. 

PETITION NO. 451 - PPL Wallingford Energy LLC petition that no Certificate of Environmental Compatibility and Public Need is required for the construction of an electric generating facility at the site of the existing Alfred L. Pierce Station, located at 195 East Street in Wallingford.  Findings of Fact.  Opinion.   Decision & Order.  Approved 6/20/00.

PETITION NO. 452 - Department of Public Safety petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission line east of Route 63 in Canaan.  Staff Report.  Approved 5/10/00.

PETITION NO. 453 - Town of Wallingford petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a new 115-kV electric transmission line from the Wallingford 13M Substation at 195 East Street to an existing Northeast Utilities electric transmission line located adjacent to Pent Road in Wallingford.  Staff Report.  Approved 6/20/00.

PETITION NO. 454 - Town of Wallingford petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification and construction of additional switching facilities at the existing Wallingford 13M Substation located at 195 East Street in Wallingford.  Staff Report.  Approved 6/20/00.

PETITION NO. 455 - AT&T Wireless PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located at 289 Danbury Road in Wilton.  Staff Report.  Approved 5/10/00.

PETITION NO. 455A - New Cingular Wireless PCS, LLC (AT&T) request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to relocate an existing AT&T facility attached to an Eversource electric transmission line structure (#2998) onto an approved replacement electric transmission line structure (#2998) within the existing Eversource right-of-way located at 287 Danbury Road in Wilton, Connecticut.  Approved 08/04/16.

PETITION NO. 456 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on the north side of Peaceable Street in Redding.  Staff Report.  Approved 5/10/00.

PETITION NO. 457 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on the north side of Chimney Drive in Bethel.  Staff Report.  Approved 5/10/00.

PETITION NO. 458 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on the east side of Cooper Hill Road in Ridgefield.  Staff Report.  Approved 6/7/00.

PETITION NO. 459 - Sprint PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located off of Charles Marshall Drive in Norwalk.  Staff Report.  Approved 5/10/00.

PETITION NO. 460 - Litchfield Acquisition Corporation d/b/a AT&T Wireless Services petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for modifications to a facility to be located at 478 Good Hill Road in Woodbury (Docket No. 183).  Staff Report.  Approved 5/24/00.

PETITION NO. 461 - Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located at the Berlin Substation on Beckley Road in Berlin.  Staff Report.  Approved 5/24/00.

PETITION NO. 462 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications equipment associated with a remote network meter reading system at Canisius Hall, Fairfield University in Fairfield.  Staff Report.  Approved 5/24/00.

PETITION NO. 463HW - Active Oil, Inc. petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required for a proposed waste oil transfer facility at 120 Forbes Avenue in New Haven.  Staff Report.  Approved 6/20/00.

PETITION NO. 464HW - Tri-S Environmental Services, Inc. petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required to operate a bulking and solidification facility at 25 Pinney Street in Ellington.  Staff Report.  Approved 6/20/00.

PETITION NO. 465 - TransEnergie U.S. Ltd. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of an electric substation and interconnection facility located adjacent to the East Shore Substation and the New Haven Harbor Generating Facility, One Waterfront Street, in New Haven.  Decision & Order.   Opinion.  (Voted that Petition was moot, 3/28/01)

PETITION NO. 466 -VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located off Station Drive adjacent to Cos Cob Railroad Station in Greenwich.  Staff Report.  Approved 6/20/00.

PETITION NO. 467 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power Company electric transmission facility located off Sound Beach Avenue at the Old Greenwich Railroad Station in Greenwich.  Staff Report.  Approved 6/20/00.

PETITION NO. 468 - Litchfield Acquisition Corp., d/b/a AT&T Wireless Services petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for modifications to a facility to be located at 20 Antolini Road in New Hartford.  Staff Report.   Staff Report 2.  Denied 7/11/00. Reconsidered and Approved 8/10/00.

PETITION NO. 469 - Litchfield Acquisition Corp., d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to a facility to be located off Rust Road, Barkhamsted, (Docket No. 182).  Staff Report.  Denied 7/11/00. Reconsidered and Approved 8/10/00.

PETITION NO. 470 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light & Power Company electric transmission facility located off Cooper Hill Road, Ridgefield.  Staff Report.  Approved 7/11/00.

PETITION NO. 471 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located on Route 136, Fairfield, Connecticut.  Staff Report.  Approved 7/25/00.

PETITION NO. 472 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located east of Duncaster Road, Bloomfield, Connecticut.  Staff Report.  Approved 7/25/00.

PETITION NO. 473 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power Company electric transmission facility located off Rowayton Avenue, Norwalk, Connecticut.  Staff Report.  Approved 8/10/00.

PETITION NO. 474 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power Company electric transmission facility located off West Avenue, Darien, Connecticut.  Staff Report.  Approved 8/10/00.

PETITION NO. 475 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on Morehouse Drive, Fairfield, Connecticut (Petition No. 383).  Staff Report.  Approved 8/31/00.

PETITION NO. 476 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed changes at Connecticut Light & Power Company’s Long Mountain Substation located off Long Meadow Road, New Milford, Connecticut.  Staff Report.  Approved 8/31/00.

PETITION NO. 477HW - United Oil Recovery, Inc. petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required for changes at the container staging area of the facility located at 136 Gracey Avenue, Meriden, Connecticut.  Staff Report.  Approved 9/19/00.

(PETITION NO. 478)/DOCKET NO. 2 - Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for a 115 kV transmission line in the Towns of Redding and Ridgefield, Connecticut (Petition No. 478). Remediation Plan and Recreational Enhancement.  Staff Report.  Approved 8/31/00.

PETITION NO. 479 - Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing Connecticut Light and Power electric transmission facility located at 7 Stony Hill Road, Bethel, Connecticut.  Staff Report.  Approved 9/19/00.

PETITION NO. 480 - Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing electric substation facility (Dooley Substation) located west of Long Hill Road and South Main Street (Rte. 17), Middletown, Connecticut.  Staff Report.  Approved 9/19/00.

PETITION NO. 481 - Litchfield Acquisition Corporation d/b/a AT&T Wireless Services petition that no amendment to the Certificate of Environmental Compatibility and Public Need is required for proposed site plan changes at 70 Herb Road, Sharon, Connecticut.  (Docket No. 185)  Staff Report.  Approved 10/2/00.

PETITION NO. 482 - HEC, Inc., acting as agent for the State of Connecticut, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for fuel cells and emergency generating devices to be developed at the Connecticut Juvenile Training School in Middletown, Connecticut.  Staff Report.  Approved 9/19/00.

PETITION NO. 483 - United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Cell Master Unit on the roof of the Connecticut Financial Center, 157 Church Street, New Haven, Connecticut. Withdrawn.

PETITION NO. 484 - Algonquin Gas Transmission Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a lateral addition to the Algonquin interstate natural gas pipeline system in Wallingford, Connecticut.   Staff Report.  Approved 10/2/00.

PETITION NO. 485 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification of an existing Connecticut Light and Power electric transmission facility located at Route 202, Russeling Road, New Milford, Connecticut.  Staff Report.  Approved 11/14/00.

PETITION NO. 486 - VoiceStream Wireless, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located at 289 Bittersweet Road, Orange, Connecticut.   Staff Report 1.   Staff Report 2.  Approved 12/19/02.

PETITION NO. 487 - VoiceStream Wireless, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located at Route 22, North Branford, Connecticut.  Staff Report.  Approved 10/19/00.

PETITION NO. 488 - Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing electric substation facility (Cos Cob Substation) located off Sound Shore Drive, Greenwich, Connecticut.  Staff Report.  Approved 11/2/00.

PETITION NO. 489 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located at Halpin Lane, Ridgefield, Connecticut.  Staff Report.  Approved 12/14/00.

PETITION NO. 490HW - Colt Refining Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to accept and store certain hazardous wastes at 12 Baer Circle, East Haven, Connecticut.  Staff Report.  Approved 11/2/00.

PETITION NO. 491 - Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of two 115-kV electric transmission lines that cross Pent Road, South Cherry Street, Dudley Avenue and South Colony Street (Route 5), Wallingford, Connecticut.  Staff Report.  Approved 11/14/00.

PETITION NO. 492 - Town of Middlebury, Citizens for the Defense of Oxford, Trout Unlimited, Inc., William Stowell, and Mira Schachne petition for a declaratory ruling regarding a Development and Management plan as submitted by Towantic Energy LLC, for construction of an electric generating facility in Oxford, Connecticut. (Docket No. 192)   Denied 3/1/01. Decision

PETITION NO. 493 - VoiceStream Wireless Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located at Park Ridge Road, west of Hope Drive, Brookfield, Connecticut.  Staff Report 1.   Staff Report 2.  Approved 12/14/00. Site plan revisions approved 10/17/01.

PETITION NO. 494 - Springwich Cellular Limited Partnership (SCLP) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located at 763 Federal Road (Route 7), South of Station Road, Brookfield, Connecticut.  Staff Report.  Approved 11/30/00.

PETITION NO. 495 - Springwich Cellular Limited Partnership (SCLP) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing SCLP telecommunications facility located on Riversville Road, Greenwich, Connecticut.  Staff Report.  Approved 12/14/00.

PETITION NO. 496 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications facilities associated with a remote network meter reading system within UI's service area.  Staff Report.  Approved five of the seven proposed sites. 12/14/00.

PETITION NO. 497 - Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to a CL&P electric transmission line and substation facilities located off Barber Hill Road (Barbour Hill Substation), South Windsor, Connecticut, and off Maple Street (Rockville Substation), Vernon, Connecticut.  Staff Report.  Approved 12/14/00.

PETITION NO. 498 - Springwich Cellular Limited Partnership petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric line structure located at Ferry Road, Old Saybrook, Connecticut.  Staff Report.  Acknowledged 3/1/01.

PETITION NO. 499 - The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to the existing Milvon Substation, located at 770 Bridgeport Avenue in Milford, Connecticut.  Staff Report.  Approved 1/25/01.

PETITION NO. 500 United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to the Mix Avenue Substation located at 690 Mix Avenue, Hamden, Connecticut.  Staff Report.  Approved 2/8/01.

PETITION NO. 501 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located at 27 Cannon Road, Wilton, Connecticut.  Staff Report.  Approved 3/1/01.

PETITION NO. 501A - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the approval upgrade in Petition No. 501 for the existing Connecticut Light and Power Company electric transmission facility located at 27 Cannon Road, Wilton, Connecticut.  Staff Report.   Approved 12/01/11.

PETITION NO. 502 - Sprint Spectrum L.P. (Sprint PCS) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located off of Sunnyside Avenue, Watertown, Connecticut.  Staff Report.  Approved 3/15/01.

PETITION NO. 503 - Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to the Montville - Dudley - Bean Hill transmission line in Montville, Connecticut.  Staff Report.  Approved 4/12/01.

PETITION NO. 504 United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications equipment associated with a remote network meter reading system at Mohegan Road Drive, Shelton, and Merrimac Drive, Trumbull, Connecticut.  Staff Report 1.   Staff Report 2.   Approved 4/12/01.

PETITION NO. 505 - Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to the 115-kV transmission line located at the Hawley Lane Mall rear parking lot, off of Hawley Lane in Trumbull, Connecticut.  Staff Report.  Approved 4/12/01.

PETITION NO. 506 - VoiceStream Wireless Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power electric transmission line support structure located on the eastern side of Old Mill Road, Waterford, Connecticut.  Staff Report.  Approved 4/26/01.

PETITION NO. 507 - Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed installation of a 115-kV capacitor bank and associated equipment at the existing Connecticut Light and Power Company Stony Hill Substation, located on Stony Hill Road, Brookfield, Connecticut.  Staff Report.  Approved 5/10/01.

PETITION NO. 508 - Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed installation of a 115-kV capacitor bank and associated equipment to the existing Connecticut Light and Power Company Rocky River Substation, located on Route 7, New Milford, Connecticut.  Staff Report.  Approved 5/10/01.

PETITION NO. 509 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed installation of telecommunications equipment at the Devon Power Station, located off of Naugatuck Avenue, Milford, Connecticut.  Staff Report.  Approved 5/10/01.

PETITION NO. 510 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed antenna installation of an existing Connecticut Light and Power Company communications tower located off Willis Street, Bristol, Connecticut.  Staff Report.  Approved 5/25/01.

PETITION NO. 511 - Sprint Sites USA petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing telecommunications facility located at 782 Old Clinton Road, Westbrook, Connecticut.  Staff Report.  Approved 7/11/01.

PETITION NO. 512 - VoiceStream Wireless Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing telecommunications facility located at 1320 Chopsey Hill Road, Bridgeport, Connecticut.  Staff Report.  Approved 06/25/02.

PETITION NO. 513 - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power electric transmission facility located off Quarry Road, Trumbull, Connecticut.  Staff Report.  Approved 6/06/01.

PETITION NO. 514 - Wisvest-Connecticut, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Bridgeport Harbor Station facility, Bridgeport, Connecticut.  Staff Report.  Approved 6/06/01.

PETITION NO. 515 - Sprint Spectrum L.P. (Sprint PCS) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing telecommunications facility located at 8 Sky Edge, Bethel, Connecticut.  Staff Report.  Approved 7/11/01.

PETITION NO. 516 - Sprint Spectrum L.P. (Sprint PCS) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing Connecticut Light & Power Company electric transmission facility located at 100 Quarry Road, Trumbull, Connecticut.  Staff Report.  Approved 7/11/01.

PETITION NO. 517 - Sprint Spectrum L.P. (Sprint PCS) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing Connecticut Light & Power Company electric transmission facility located at 18 Hilltop View Lane, New Milford, Connecticut.  Staff Report.  Approved 7/11/01.

PETITION NO. 518 - Crown Atlantic Company LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed relocation of an existing telecommunications tower and related equipment off North Street and Bates Lane, Greenwich, Connecticut. Findings of Fact.  Opinion.  Decision & Order.  Approved 10/03/01.

PETITION NO. 519 - Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to the Campville Substation to Weingart Road Junction 115-kV transmission line, Harwinton, Connecticut.  Staff Report.  Approved 8/29/01.

PETITION NO. 520 - Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed reconstruction of the Weingart Road Junction to Canton Substation 115-kV transmission line, Harwinton, New Hartford, and Canton, Connecticut.  Staff Report.  Approved 8/29/01.

PETITION NO. 521 - Dominion Nuclear Connecticut, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Millstone Power Station, Waterford, Connecticut.  Staff Report.  Approved 8/8/01.

PETITION NO. 522 - Cross-Sound Cable Company, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need (Certificate) is required for the construction, maintenance, and operation of an electric substation and interconnection facility located adjacent to the East Shore Substation and the New Haven Harbor Generating Facility, One Waterfront Street, New Haven, Connecticut.  Findings of Fact.   Opinion.   Decision & Order.  Approved 01/03/02.

PETITION NO. 523 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to a proposed telecommunications facility located at 652 Glenbrook Road, Stamford, Connecticut.   Denied 08/29/01.

PETITION NO. 524 The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications on the UI 115kV Mix-Glen Lake overhead transmission line, Woodbridge and Hamden, Connecticut.  Staff Report.  Approved 09/12/01.

PETITION NO. 525 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power electric transmission facility located on Morehouse Road, Fairfield, Connecticut.  Staff Report.  Approved 09/12/01.

PETITION NO. 526 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental compatibility and Public Need is required for proposed modifications to an existing Connecticut Light and Power electric transmission facility located off Sound View Road, Greenwich, Connecticut.   Staff Report.  Approved 10/03/01.

PETITION NO. 527 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on Nichols Avenue, Trumbull, Connecticut.  Staff Report.  Approved 11/07/01.

PETITION NO. 528 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on Chapel Street, Stratford, Connecticut.  Staff Report.  Approved 11/07/01.

PETITION NO. 529 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located at the Noroton Heights Railroad Station, Darien, Connecticut.  Staff Report.  Approved 11/7/01.

PETITION NO. 529A - AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement tower at an existing Connecticut Light and Power facility located at Norton Heights Train Station, Darien, Connecticut.   Staff Report.  Approved 09/25/02.

PETITION NO. 530 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on Flanders Road, East Lyme, Connecticut.  Staff Report.   Approved 11/29/01.

PETITION NO. 531 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of existing Connecticut Light and Power electric transmission lines located between the Ely Avenue Junction and Glenbrook Substation in the Towns of Norwalk, Darien, and Stamford, Connecticut.  Staff Report.  Approved 11/29/01.

PETITION NO. 532 - Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need (Certificate) is required for the modification of the existing CL&P line between CL&P's Montville Substation and the Mohegan Tribal Utility Authority's Fort Hill Farms Substation, Montville, Connecticut.  Staff Report.  Approved 12/11/02.

PETITION NO. 533 - VoiceStream Wireless Corporation petition for a declaratory ruling that the proposed installation of an Enhanced 911 System qualifies as an exempt modification to VoiceStream's existing telecommunications facilities under the Council's jurisdiction.  Staff Report.  Approved 12/11/01.

PETITION NO. 534 - Connecticut Light and Power (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need (Certificate) is required for the modification of an existing CL&P Card Substation in Lebanon, Connecticut.  Staff Report.  Approved 12/11/01.

PETITION NO. 535 – AT&T Wireless PCS, LLC and Crown Atlantic Company LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modification of an existing telecommunications tower located at 1455 Forbes Street, East Hartford, Connecticut.  Findings of Fact.  Opinion.  Decision & Order. Approved 05/21/02.

PETITION NO. 536 - Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed installation of a 115-kV capacitor bank and associated equipment at the existing Connecticut Light and Power Company Franklin Drive Substation, located on Franklin Drive, in Torrington, Connecticut.  Staff Report.  Approved 01/03/02.

PETITION NO. 537 - Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed installation of approximately 400 feet of 115-kV solid dielectric cable, two 115-kV capacitor banks, and associated equipment at the existing Connecticut Light and Power Company Mystic Substation, located on Greenmanville Road (Route 27), in Stonington, Connecticut.  Staff Report.  Approved 01/03/02.

PETITION NO. 538 - Crown Atlantic Company LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing telecommunications facility located at 44 Fyler Road, Suffield, Connecticut.  Staff Report.  Approved 01/17/02.

PETITION NO. 539 - Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed installation of a new 115-kV line termination structure, two 115-kV capacitor banks, and associated equipment at the existing Connecticut Light and Power Company Canton Substation located off Morgan Road, in Canton, Connecticut.  Staff Report.  Approved 01/17/02.

PETITION NO. 540 - Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing Iroquois Pipeline by the Addition of a Natural Gas Compressor Station, located off High Meadow Road, Brookfield, CT.   Approved 09/25/02.    Decision.  Opinion.  Findings of Fact.

PETITION NO. 541 United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications equipment associated with a remote network meter reading system at 74 Cottage Street, Derby, Connecticut.  Staff Report.   Approved 02/14/02.

PETITION NO. 542 - Nextel Communications Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing Connecticut Light and Power Company electric transmission facility located east of Hawley Lane, near the Trumbull/Stratford town boundary, Connecticut.  Staff Report.  Approved 2/14/02.

PETITION NO. 543 - Sprint Spectrum L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing Connecticut Light and Power Company electric transmission facility located between 645 and 695 Chapel Street, Stratford, Connecticut.  Staff Report.  Approved 02/14/02.

PETITION NO. 544 - Crown Atlantic Company LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed shared use of an existing telecommunications tower located at 200 Stanley Street, New Britain, Connecticut.  Staff Report.  Approved 02/14/02.

PETITION NO. 545 - Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing Connecticut Light & Power Company electric transmission facility located east of Highland Avenue, Wallingford, Connecticut.  Findings of Fact.  OpinionDecision & Order.  Approved 09/05/02.

PETITION NO. 546 - Pratt & Whitney petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to the existing cogeneration power facility at the Pratt & Whitney manufacturing facility, 400 Main Street, East Hartford, Connecticut.  Staff Report.  Approved 03/07/02.

PETITION NO. 547 - Town of Wethersfield petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to an existing telecommunications facility at 2111 Berlin Turnpike, Newington, Connecticut.  Staff Report.  Approved 04/25/02.

PETITION NO. 548 - Yankee Gas Services Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation, and maintenance of a distribution line in Southington, Berlin, and Meriden, Connecticut.  Findings of Fact.  Opinion.  Decision & OrderApproved 08/01/02.

PETITION NO. 549 - Kleen Energy Systems, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed transmission line interconnection from the proposed Electric Generating Facility and Switchyard on River Road to existing 345 kV Connecticut Light and Power transmission line number 353. Consolidated with Docket 225.

PETITION NO. 550 - The Connecticut Municipal Electric Energy Cooperative (CMEEC) petition that no Certificate of Environmental Compatibility and Public Need is required for the emergency installation of up to two temporary mobile gas turbine generating units at the South Norwalk Electric Works generating facility in the City of Norwalk, Connecticut.  Staff Report.  (Withdrawn)

PETITION NO. 551 - Omnipoint Communications, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing communications tower located off Route 1 between River Street and Ford Drive, Old Saybrook, Connecticut.  Staff Report.  Approved 04/25/02.

PETITION NO. 552 - Spectrasite Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing communications tower located at 1069 Connecticut Avenue, Bridgeport, Connecticut.  Staff Report.  Approved 04/03/02.

PETITION NO. 553 - Town of South Windsor petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a fuel cell at the South Windsor High School, 161 Nevers Road, South Windsor, Connecticut.  Staff Report.  Approved 04/03/02.

PETITION NO. 554 - Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of its existing interstate natural gas pipeline by the addition of a compressor station at 962 New Oronoque Road in Milford, Connecticut. Consolidated with Docket 226.

PETITION NO. 555 - Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing Iroquois Pipeline by additions to a Natural Gas Compressor Station, located off High Meadow Road, Brookfield, Connecticut. Approved 09/25/02.  (See Petition No. 540 above to view Findings of Fact, Opinion, and Decision and Order.)

PETITION NO. 556 - Berkshire Power petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary 69.2 MW peaking project in Stamford, Connecticut.  Findings of Fact.   Opinion.  Decision & Order.  Approved 04/25/02.  Revised Development and Management Plan Approved 03/11/03.

PETITION NO. 557 - Spectrasite Communications, Inc. and AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing telecommunications facility located at 644 Rimmon Road, Beacon Falls, Connecticut.  Staff Report.  Approved 05/07/02.

PETITION NO. 558 - Omnipoint Facilities Network 2, L.L.C. (VoiceStream) for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing telecommunications facility located behind 5 High Ridge Park, Stamford, Connecticut.  Staff Report.  Approved 05/21/02.

PETITION NO. 559 - New England Site Management, LLC for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed extension to an approved telecommunications facility to be located at Powder Forest Business Park, off of Grist Mill Road, Simsbury, Connecticut.  Staff Report.  Approved 05/21/02.

PETITION NO. 560 United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification and relocation of existing transmission line structures in connection with the Connecticut Department of Transportation's reconstruction of the Quinnipiac River Bridge, New Haven, Connecticut.  Staff Report.  Approved 07/11/02.

PETITION NO. 561 - Robert J. Rigney, et. al., petition for a declaratory ruling ordering a hearing to determine the effects associated with the construction, operation, and maintenance of a telecommunications facility located at 319-321 New Britain Avenue, Farmington, Connecticut.  Staff Report.   Decision.  Denied 09/05/02.

PETITION NO. 562 - Connecticut Municipal Electric Energy Cooperative (CMEEC) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the emergency installation of up to two temporary mobile turbine generating units at the Rowan Street Substation in the City of Norwalk, Connecticut.  Staff Report.  Approved 06/03/02.

PETITION NO. 563 - The Torrington Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of two 70 kilowatt microturbine generators at 59 Field Street, Torrington, Connecticut.  Staff Report.   Approved 06/25/02.

PETITION NO. 564 - SBA Properties, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed shared use of an existing telecommunications facility located at 39 Ciro Road in North Branford, Connecticut.  Staff Report.  Approved 06/25/02.

PETITION NO. 565 - SBA Properties, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 768 Gilead Street, Hebron, Connecticut.  Staff Report.  Approved 06/25/02.

PETITION NO. 566 - Meriden Gas Turbines LLC and the Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of the South Kensington Switching Station in Berlin, and a 345 kV electric transmission line between the proposed CL&P South Kensington Switching Station and the Meriden Combined Cycle Generating Facility in Meriden and Berlin.  Staff Report.  Approved 07/11/02.

PETITION NO. 567 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to two 345-kV electric transmission lines from the proposed CL&P South Kensington Switching Station and the Meriden Combined Cycle Generating Facility through Southington, Meriden, and Berlin.  Staff Report.  Approved 07/11/02.

PETITION NO. 568 - Thames Valley Communications, Inc. and the City of Groton petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 295 Meridian Street, Groton, Connecticut.  Staff Report.  Approved 06/25/02.

PETITION NO. 569 – Dominion Nuclear of Connecticut petition for a declaratory ruling that no certificate of environmental compatibility and public need is required for proposed change in use of low-level radwaste reduction facility at the Millstone Power Station.   Staff Report.  Withdrawn.

PETITION NO. 570 United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed lightning protection modifications to the Mix Avenue Substation, located at 690 Mix Avenue in Hamden, Connecticut.   Staff Report.  Approved 07/11/02.

PETITION NO. 571 - Sprint Spectrum L.P. petition for a declaratory ruling that no certificate of environmental compatibility and public need is required for the addition of antennas to the existing NRG Energy, Inc. facility located at 1866 River Road, Middletown, Connecticut.   Staff Report.  Approved 07/11/02.

PETITION NO. 572 - PSEG Fossil LLC petition for a declaratory ruling that no transfer of certificate of environmental compatibility and public need is required or that the certificate of environmental compatibility and public need be transferred.  Approved 08/01/02.

PETITION NO. 573 - National Grid Communications, Inc. petition for a declaratory ruling that no certificate of environmental compatibility and public need is required for proposed modifications to a municipally approved telecommunications facility located at 157 Chestnut Mountain Road (a/k/a Chestnut Hill Road, a/k/a Route 190), Stafford, Connecticut.  Staff Report.  Approved 08/01/02.

PETITION NO. 574 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed underground transmission line relocation work in connection with the State of Connecticut Department of Transportation's Interstate 95 reconstruction project.  Staff Report.  Approved 09/05/02.

PETITION NO. 575 - AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 57 Cook Road, Montville, Connecticut.   Staff Report.  Approved 09/05/02.
 
PETITION NO. 577 - Sprint Spectrum, L.P. d/b/a Sprint PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Northeast Utility power line pole located at 35 Shelley Road, Bethel, Connecticut.   Staff Report.  Approved 09/25/02.

PETITION NO. 578 - SBA Properties, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 859 Goshen Hill Road, Lebanon, Connecticut.   Staff Report.  Approved 09/05/02.
 
PETITION NO. 579 - Omnipoint Communications, Inc. d/b/a T-Mobile petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need for the proposed modifications to a telecommunications facility located on 2 Hinckley Hill Road, Norwich, Connecticut.   Staff Report.  Approved 09/05/02.

PETITION NO. 580 - Sprint Spectrum L.P. d/b/a Sprint PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need for the proposed modifications to a telecommunications facility located at 761 Federal Road in Brookfield, Connecticut.  Staff Report.  Approved 09/25/02.

PETITION NO. 581 - AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for two silos and that the proposed modifications constitute a tower facility located at 91 Maple Avenue, East Haddam, Connecticut. Decision.  Staff Report.  Approved 09/25/02.

PETITION NO. 582Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications at the existing Connecticut Light and Power Company Farmington Substation, located off Old Mountain Road, Farmington, Connecticut.   Staff Report.   Approved 09/25/02.

PETITION NO. 583 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 19 Old Town Road, Hartland, Connecticut.   Staff Report.

PETITION NO. 584 - Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the CL&P Norwalk Substation located on New Canaan Avenue, Norwalk, Connecticut.   Staff Report.  Approved 10/23/02.

PETITION NO. 585 - AT&T Wireless, PCS, Inc., d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Middletown Generating Plant located at 1866 River Road, Middletown, Connecticut.  Staff Report.  Approved 10/23/02.

PETITION NO. 586 - SpectraSite Communications, Inc., d/b/a SpectraSite petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 330 Middletown Road, Columbia, Connecticut.  Staff Report.  Approved 2/11/03.

PETITION NO. 587 - SpectraSite Communications, Inc., d/b/a SpectraSite petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 135 Honey Hill Road, East Haddam, Connecticut.  Staff Report.  Approved 10/23/02.

PETITION NO. 588Sprint Spectrum L.P. d/b/a Sprint PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power (CL&P) transmission facility on Vale Road, Brookfield, Connecticut. Staff Report.  Approved 10/23/02.

PETITION NO. 589Pinnacle Towers. Inc. d/b/a Pinnacle petition for a declaratory ruling and acknowledgement of the co-location, structural capability, radio frequency emission status and approval of the tower sharing request by WEDW-DTV of October 24, 2001 for the telecommunications facility located at Video Lane, Trumbull, Connecticut.   Staff Report.  Approved 12/19/02.

PETITION NO. 590Omnipoint Communications, Inc. d/b/a T-Mobile USA, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power (CL&P) transmission facility off Rood Avenue, Windsor, Connecticut.  Staff Report.  Approved 11/07/02.

PETITION NO. 591 - Tower Ventures, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the operation and maintenance of a proposed telecommunications facility to be located at 229-231 Ashford Center Road, Ashford, Connecticut. Re-filed as Docket 239.

PETITION NO. 592 - Southwestern Bell Mobile Systems, LLC petition for 1) reconsideration of exempt modification EM-CING-062-020930, or in the alternative 2) a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and modifications to an existing telecommunications facility located at 975 Mix Avenue, Hamden, Connecticut.   Staff Report.  Approved 10/23/02.

PETITION NO. 593 - Sprint Spectrum L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and relocation of an existing telecommunications facility located in the Goddard Hall complex at Eastern Connecticut State University on Eastern Drive off High Street in Willimantic, Connecticut.  Staff Report.  Approved 11/07/02.

PETITION NO. 594 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power electric transmission facility located at 74 Birdsley Avenue, Meriden, Connecticut.  Staff Report.  Approved 11/21/02.

PETITION NO. 595 - Sprint Spectrum, L.P. d/b/a Sprint PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to replace an existing CL&P structure on 153 Old Salem Road, Norwich, Connecticut.   Staff Report.  Approved 12/19/02.

PETITION NO. 596 - Northeast Utilities Service Company agent for The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Falls Village Substation located in Canaan, Connecticut.  Staff Report.  Approved 12/19/02.

PETITION NO. 597 - Northeast Utilities Service Company agent for The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Connecticut Light and Power Transmission Line at Mystic Aquarium, Stonington, Connecticut.   Staff Report.  Approved 12/19/02.

PETITION NO. 598 - Yale University petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a fuel cell to be located on Yale's Campus in New Haven, Connecticut.   Staff Report.   Approved 12/19/02.

PETITION NO. 599 - Connecticut Department of Public Works petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation, and maintenance of a 3.75-megawatt gas-fired reciprocating engine electric generation facility located at Central Connecticut State University, New Britain, Connecticut.  Staff Report.  01/28/03-Ruled not our jurisdiction

PETITION NO. 600 - AT&T Wireless PCS, Inc. d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 20 Post Office Road, Westport, Connecticut.   Staff Report.  Approved 01/08/03.

PETITION NO. 601 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement and relocation of an existing telecommunications facility located at 130 Ingham Hill Road, Old Saybrook, Connecticut.  Staff Report.  Approved 01/08/03.

PETITION NO. 602 - AT&T Wireless PCS, Inc. d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power electric transmission facility located at 989 Church Street, Wallingford, Connecticut.  Staff Report.  Approved 01/08/03.

PETITION NO. 603 - Lake Road Generating Company L.P. petition for a declaratory ruling that its existing electric generating facility complies with the Certificate and Decision and Order for operation on low sulfur fuel oil for Unit 1 and implementation plans for Units 2 and 3 in Killingly, Connecticut.  Staff Report.  Approved 01/28/03

PETITION NO. 604 - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modificatons to an existing Connecticut Light and Power transmission tower located at 76 Lyons Plain Road, Weston, Connecticut. 

PETITION NO. 605 - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing telecommunications facility located at 315 Old Hartford Road, Colchester, Connecticut.   Staff Report.  Approved 02/11/03.

PETITION NO. 606 - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing transmission line tower located off of Bartholomew Road, Middletown, Connecticut.   Staff Report.  Approved 06/19/03.

PETITION NO. 607 - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing transmission line tower located at 126 Old Colchester Road, Waterford, Connecticut.   Staff Report.  Approved 03/11/03.

PETITION NO. 608 - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing telecommunications tower located at 70 Platt Road, Shelton, Connecticut.   Staff Report.  Approved 03/25/03
 
PETITION NO. 609E - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing transmission line along the Metro-North Railroad Corridor between Baird Substation in Stratford and Congress Street Substation, Bridgeport, Connecticut.   Staff Report.  Approved 03/11/03.

PETITION NO. 610T - Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light & Power Company electric transmission facility located off of Shelter Rock Road, Danbury, Connecticut.   Staff Report.  Approved 02/25/03.

PETITION NO. 611T - Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 2 Sunny Lane, Westport, Connecticut. Withdrawn.

PETITION NO. 612E - Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Glenbrook Substation, Stamford, Connecticut.   Staff Report.  Approved 04/23/03.

PETITION NO. 613T - Sprint Sites USA petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 1919 Boston Post Road, Guilford, Connecticut.   Staff Report.  Approved 04/09/03

PETITION NO. 614T - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing telecommunications tower located at 450-478 West Main Street, Meriden, Connecticut.  Staff Report.  Approved 03/11/03.

PETITION NO. 615E - Northeast Utilities, as agent for Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Stony Hill Substation, Brookfield, Connecticut.  Staff Report.  Approved 03/11/03.

PETITION NO. 616T - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction of a telecommunications facility at 2 Huckleberry Hill Road, Brookfield, Connecticut.  Staff Report.  Approved 04/09/03.

PETITION NO. 617E - Waterside Power, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary 69.2 MW peaking project in Stamford, Connecticut. Findings of Fact.  Staff Report.  Approved 05/06/03.

PETITION NO. 618T - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to an existing Connecticut Light and Power Company transmission structure located at 67 Hawthorne Mead Drive, Glastonbury, Connecticut.  Staff ReportApproved 08/26/03.

PETITION NO. 619E - Select Energy Services, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required is required for the construction, operation and maintenance of a fuel cell to be located at St. Francis Hospital and Medical Center, 114 Woodland Street, Hartford, Connecticut.  Staff Report.  Approved 05/06/03.

PETITION NO. 620E - Connecticut Municipal Electric Energy and the South Norwalk Electric Works petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary 23 MW combustion turbine electric generating unit to be located at the South Norwalk Electric Works Power Plant and Substation off of State Street, Norwalk, Connecticut.   Staff Report.   Opinion.  Approved 05/20/03.

PETITION NO. 621T - Sprint Spectrum L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Northeast Utilities transmission pole located at 228 Highland Avenue, Norwalk, Connecticut.  Staff Report.  Approved 05/20/03.

PETITION NO. 622T - Omnipoint Facilities Network 2, L.L.C., a subsidiary of T-Mobile USA, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power electric transmission line located west off of Huntington Avenue, Stratford, Connecticut.   Staff Report.  Approved 06/03/03.
 
PETITION NO. 623 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and relocation of an existing telecommunications located at 585 New Haven Road, Naugatuck, Connecticut.  Staff Report.  Approved 05/06/03.

PETITION NO. 624E - BTEC Turbines LP petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a temporary 54 MW peaking project located at the intersection of Dock, Jefferson and Canal Streets in Stamford, Connecticut. WITHDRAWN.

PETITION NO. 625E - BTEC Turbines LP petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a temporary 54 MW peaking project located at the intersection of Dock, Jefferson and Canal Streets in Stamford, Connecticut.  WITHDRAWN.

PETITION NO. 626T - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a wireless telecommunications facility at 111 Middle Turnpike, Mansfield, Connecticut.  Staff Report.  Findings of Fact.  Approved 09/09/03.

PETITION NO. 627T - Sprint Spectrum L.P. and Omnipoint Facilities Network 2, L.L.C. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 206 Everett Road, Easton, Connecticut.  Staff Report.  Approved 06/19/03.

PETITION NO. 628T - Sprint Spectrum L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 500 Moose Hill Road, Monroe, Connecticut.  Staff Report.  Approved 06/19/03.

PETITION NO. 629T - Southwestern Bell Mobile Systems, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at the Quinnipiac College Carl Hansen Student Center, New Road, Hamden, Connecticut.   Staff Report.  Approved 06/19/03.

PETITION NO. 630E - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing CL&P Southington substation located off Belleview Ave., Southington, Connecticut.   Staff Report.  Approved 06/19/03
 
PETITION NO. 631T - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at Spring Hill Lane, Bethel, Connecticut.  Withdrawn

PETITION NO. 632E - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the 345-kV transmission lines from the Millstone Substation to the Southington Substation and the Scovil Rock Substation to East Shore Substation, Middletown and Middlefield, Connecticut.  Staff Report 1.   Staff Report 2.  Approved 07/08/03 and 08/26/03.


PETITION NO. 633T - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of a privately-owned distribution pole located at 575 Hillstown Road, Manchester, Connecticut.  Staff Report.  Approved 07/08/03.
 
PETITION NO. 634T - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement to an existing telecommunications facility located at 259 Commerce Street, East Haven, Connecticut.   Staff Report.  Approved 07/08/03.

PETITION NO. 635T - Omnipoint Communications, Inc., a subsidiary of T-Mobile USA, Inc. petition for a declaratory r/ling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to existing Connecticut Light and Power Company electric transmission line support structure located on the east side of Route 121 (North Street), Milford, Connecticut.   Staff Report.  Approved 07/08/03.

PETITION NO. 636T - Omnipoint Facilities Network 2, L.L.C., a subsidiary of T-Mobile USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to existing United Illuminating electric transmission line support structure off of Timko Street, Fairfield, Connecticut. Decision.  Staff Report.  Approved  07/22/03.

PETITION NO. 637 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed attachment of telecommunications antennas and related equipment to a replacement light pole at 33 Neptune Avenue, East Haddam, Connecticut.  Staff Report.  Approved 11/20/03.

PETITION NO. 638 - Lake Road Generating Company L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Lake Road Generating substation off of Lake Road, Killingly, Connecticut. Staff Report.  Approved 09/09/03.

PETITION NO. 639University of Connecticut petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a proposed cogeneration plant and substation to be constructed off of North Eagleville Road, Storrs, Connecticut.  Staff Report.  Approved  09/23/03.

PETITION NO. 640Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an impressed current ground bed off of West Avenue and Schoolhouse Road, Milford, Connecticut.  Staff Report.  Approved 09/09/03.

PETITION NO. 641 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to the Todd 30L substation located off of Todd Road, Wolcott, Connecticut.  Staff Report.  Approved 08/26/03.

PETITION NO. 642 - Omnipoint Communications, Inc., a subsidiary of T-Mobile USA, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing facility at 46 Brendan Street, Stafford Springs, Connecticut.  Staff Report.  Approved 08/26/03.

PETITION NO. 643 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to Dooley Substation at South Main Street, Middletown, Connecticut.  Staff Report.  Approved 09/09/03.

PETITION NO. 644Sprint Spectrum, L.P., d/b/a Sprint PCS and Southwestern Bell Mobile Systems, LLC, d/b/a Cingular Wireless for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the addition of Sprint PCS and Cingular Wireless Antennas to an existing Connecticut Light & Power Company electrical transmission structure at 45 Maple Ridge Drive, Farmington, Connecticut.  Staff Report.  Approved 10/29/03.

PETITION NO. 645 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to re-establish CL&P’s access to structure number 2688, Brookfield Substation to Brookfield Junction 115-kV Line off Laurel Hill Road, Brookfield, Connecticut. Staff Report. Approved 10/14/03.

PETITION NO. 646 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 115-kV capacitor bank and associated equipment at Haddam Substation at Route 154, Haddam, Connecticut.   Staff Report.   Approved 12/9/03.

PETITION NO. 647 - Nxegen, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a fuel cell at the Water Pollution Control Authority at 345 East Shore Parkway, New Haven, Connecticut. Staff Report.   Approved 10/14/03.

PETITION NO. 648 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to extend the height of an existing telecommunications facility located at 650 Albany Turnpike, Canton, Connecticut.  Staff Report.  Approved 10/29/03.

PETITION NO. 649Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to extend the height of the proposed Sprint Spectrum L.P. tower at 170 Southeast Road, New Hartford, Connecticut.  Staff Report.  Approved 02/03/04.

PETITION NO. 650The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to tap into its existing 115-kV 1977 line at Glenbrook Substation located at Hamilton Avenue and Culloden Road, Stamford, Connecticut.   Staff Report 1.    Staff Report 2.   Approved 10/29/03.

PETITION NO. 651 - Connecticut Architectural Towers LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing telecommunications tower located at 151 Berkshire Road, Newtown, Connecticut.  Staff Report.  Approved 11/20/03.

PETITION NO. 652 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to Southington 4C Substation, off of Belleview Avenue, Southington, Connecticut.   Staff Report.  Approved 12/9/03.

PETITION NO. 653 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Branford 11J Substation, East Main Street, Branford, Connecticut. Staff Report.  Approved 12/22/03.

PETITION NO. 654 – Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction of a telecommunications facility to be located at 388 Norwich Road, Plainfield, Connecticut.   Staff Report.  Approved 1/12/04.

PETITION NO. 655 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility at 42 South Street, Plymouth, Connecticut.   Staff Report.  Approved 1/12/04.

PETITION NO. 656 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunication facility at 528 Wheelers Farm Road, Milford, Connecticut.  Staff Report.  Approved 02/03/04.

PETITION NO. 657 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing CL&P Torrington substation located on the town line between the City of Torrington and the Town of Litchfield, Connecticut.  Staff Report.  Approved 02/03/04.

PETITION NO. 658 - The Waterside Power LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the temporary 69.2 MW Peaking Project in Stamford, Connecticut.  Staff Report.  Approved 03/04/04.

PETITION NO. 659 - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of an existing telecommunications facility at the Goshen Fire Department, Waterford, Connecticut.   Staff Report.  Approved 03/17/04

PETITION NO. 660 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed antenna installation on an existing smokestack at 14 Gilbert Street, West Haven, Connecticut.   Staff Report.  Approved 03/04/04.

PETITION NO. 661 - Connecticut Light & Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed substation expansion, the installation of 115-kV capacitor banks and the installation of associated equipment at CL&P’s Frost Bridge 8R Substation in Watertown, Connecticut.   Staff Report.  Approved 03/04/04.

PETITION NO. 662 - South Norwalk Electric Works (SNEW) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed emergency installation of a temporary 22.8 MW peaking project off of Dr. Martin Luther King Jr. Boulevard, South Norwalk, Connecticut.  Staff Report.  Approved 03/04/04

PETITION NO. 663 - South Norwalk Electric and Water (SNEW) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed repowering of an existing SNEW Generating Station located at One State Street, Norwalk, Connecticut.  Approved 10/07/04.    (Findings of Fact),  (Opinion),  (Decision and Order).

PETITION NO. 664 - Lake Road Generating Company L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification in operations at the Lake Road Generating facility located off of Lake Road, Killingly, Connecticut.  Staff Report.  Approved 5/19/04.

PETITION NO. 665 - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing Connecticut Light and Power transmission structure located off of Hebron Road, Andover, Connecticut.   Staff Report.  Approved 04/15/04

PETITION NO. 666 - Dominion Nuclear Connecticut, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need nor a modification of the existing Certificate is required to establish an indoor firing range at the Millstone Power Station, Waterford, Connecticut.   Staff Report.  Approved 4/26/04.

PETITION NO. 667Message Center Management, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 1055 Wintergreen Avenue (West Rock), Hamden, Connecticut.  Staff Report.  Not within Council jurisdiction.

PETITION NO. 668Sprint Spectrum L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the relocation of its existing facility on Forbes Avenue, New Haven, Connecticut.   Staff Report.   Denied 05/20/04.

PETITION NO. 669 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modifications to its existing 115/23-kilovolt Haddam 11C Substation located in Haddam, Connecticut.  Staff Report.  Approved 06/09/04.

PETITION NO. 670 – Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modifications to its existing 115/23-kilovolt transmission line in the vicinity of the Haddam 11C substation located in Haddam, Connecticut. Staff Report.  Approved 07/13/04.

PETITION NO. 671 – Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 95 kW emergency generator and associated equipment at Haddam Neck 14B Substation in Haddam, Connecticut.  Staff Report.   Approved 05/19/04.


PETITION NO. 672 - Connecticut Municipal Electric Energy Cooperative petition for a declaratory ruling that the proposed installation of four 2 MW emergency generators is exempt from Council jurisdiction or alternatively, that no Certificate of Environmental Compatibility and Public Need is required for the proposed installations at 100 John Street and South Cherry Street, Wallingford, Connecticut.  Staff Report.  Approved 05/19/04.
 
PETITION NO. 673 - Omnipoint Communications, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed antenna installation on an existing lattice tower located at 347 East Street, Wolcott, Connecticut.  Staff Report.  Approved 06/09/04.
 
PETITION NO. 674 - Southwestern Bell Mobile Systems, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of an existing wireless telecommunications facility at 705 West Johnson Road, Cheshire, Connecticut.  Staff Report.  Requested it be submitted as a docket (06/09/04).
 
PETITION NO. 675 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that a Certificate of Environmental Compatibility and Public Need is not required for the modification of an existing CL&P transmission structure off Hilltop View Lane, New Milford, Connecticut.  Staff Report.  Approved  06/09/04.
 
PETITION NO. 676 - The Third Taxing District of the City of Norwalk petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of three 2MW diesel generators at Norden Place, East Norwalk, Connecticut.   Staff Report.  Approved 06/23/04.
 
PETITION NO. 677 – Sprint Sites USA petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at Great Hollow Road, Woodbury, Connecticut.  Staff ReportApproved 08/12/04.
 
PETITION NO. 678 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 186 Minortown Road, Woodbury, Connecticut.    Staff Report.  Approved 07/13/04.

PETITION NO. 679 - Omnipoint Facilities Network 2, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing guyed, lattice tower at 4 Dittmar Road, Redding, Connecticut.   Withdrawn.

PETITION NO. 680 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a 40-foot stealth flagpole telecommunications tower on the roof of the existing Howard Johnson Hotel at 1052 Boston Post Road, Milford, Connecticut.    Staff Report.  Approved  07/13/04.
 
PETITION NO. 681 - Connecticut Light & Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of various equipment at CL&P’s Portland 21H Substation in Portland, Connecticut.   Staff ReportApproved  08/12/04.
 
PETITION NO. 682 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public need is required for the proposed installation of a power transformer and associated equipment at CL&P’s Canton 5R Substation in Canton, Connecticut.   Staff Report.  Approved 07/13/04.
 
PETITION NO. 683 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modifications to its existing substation in the town of Redding, Connecticut.   Staff ReportApproved  08/12/04.
 
PETITION NO. 684 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modifications to its existing substation in the town of Ridgefield, Connecticut.  Staff ReportApproved  08/12/04.
 
PETITION NO. 685 - Nextel Communications Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to Connecticut Light & Power’s Pole Structure # 10184 and Electric Transmission Line # 1618 in the Town of New Milford, Connecticut.  Tabled 08/26/04.
 
PETITION NO. 686 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a power transformer and associated equipment at CL&P’s Shaws Hill 24H substation in Watertown, Connecticut.  Staff ReportApproved 08/12/04.

PETITION NO. 687 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the establishment of a wireless telecommunications facility at the Harvest Baptist Church, 144 Litchfield Turnpike, New Hartford, Connecticut.  (Findings of Fact. ) (Opinion)   (Decision and Order)  Approved 12/01/04.

PETITION NO. 688 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to establish a stealth flagpole telecommunications facility at the Quality Inn and Conference Center, 100 Pond Lily Avenue, New Haven, Connecticut. Decision.   Staff ReportDenied 08/26/04.
 
PETITION NO. 689 - Connecticut Municipal Electric Energy Cooperative petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of an above ground 8000 gallon capacity fuel oil storage tank on South Cherry Street, Wallingford, Connecticut.   Staff ReportApproved 08/12/04.

PETITION NO. 690 - GenCell Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Fuel Cell at 1432 Old Waterbury Road, Southbury, Connecticut and at 44 Weaver Road, Unit 5233, Storrs, Connecticut. Decision.   Staff Report.  Approved 09/14/04.

PETITION NO. 691 - Southwestern Bell Mobile Systems, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of cellular antennas and associated equipment at an existing CL&P electric transmission facility in Southington, Connecticut.   Staff Report.  Approved 08/26/04.

PETITION NO. 692 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a circuit breaker and associated equipment at Cos Cob Metro-North Railroad 35K Substation in Greenwich, Connecticut.    Staff Report.  Approved 09/14/04.

PETITION NO. 693 - Southwestern Bell Mobile Systems, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of cellular antennas and associated equipment at an existing CL&P electric transmission facility in Manchester, Connecticut.   Staff Report.  Approved 09/14/04.
 
PETITION NO. 694 - Bozrah Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing electric substation located on Stockhouse Road in Bozrah, Connecticut.   Staff Report.  Approved 10/07/04.

PETITION NO. 695 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a transformer and associated equipment at CL&P’s Windsor Locks 14K substation located in Windsor Locks, Connecticut.   Staff Report.  Approved 10/07/04
 
PETITION NO. 696 - Johnson Controls, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 200-kW Fuel Cell at the Water Pollution Control Facility located at 330 One Rod Highway, Fairfield, Connecticut.   Staff ReportApproved 10/26/04.
 
PETITION NO. 697Nextel Communications of the Mid-Atlantic, Inc. d/b/a Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing monopole located at 143 Old Blue Hills Road, Durham, Connecticut.  Staff ReportApproved 05/11/05.

PETITION NO. 698 - Department of Public Works petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 25 kW fuel cell at the Dinosaur State Park, Rocky Hill, Connecticut.  Staff ReportApproved 12/01/04.

PETITION NO. 699 - The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to interconnect UI’s existing underground 115 kV 8700 transmission line with the Metro North rail yard 26.4 kV supply station located on Union Avenue in New Haven, Connecticut.  Staff Report.   Approved 12/21/04.

PETITION NO. 700 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the 115-kV transmission circuits at the Triangle 11A Substation in Danbury, Connecticut.   Staff Report.   Approved 01/24/05.

PETITION NO. 701Nextel Communications Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to a Connecticut Light & Power Company electric transmission facility at 145 Beebe Hill Road, tower #2010 in Canaan, Connecticut.   Staff Report.   Approved 01/24/05.
 
PETITION NO. 702 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Plumtree to Triangle 115-kV Transmission Upgrade Project in the towns of Bethel and Danbury, Connecticut.  Findings of Fact.   Opinion.   Decision and Order. Approved 06/28/05
 
PETITION NO. 703New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to a light pole located at Chesley Park, 35 Wildwood Street, New Britain, Connecticut.  Staff Report.   Acknowledged as not within Council's jurisdiction 3/3/05.

PETITION NO. 704 - Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Norwalk Harbor Substation, Norwalk, Connecticut. Staff Report. Approved 03/03/05.

PETITION NO. 705 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Milvon Substation, Milford, Connecticut.  Staff Report.  Approved 03/15/05.

PETITION NO. 706 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 115-kV series line reactors and associated equipment at the Southington 4C substation in Southington, Connecticut.  Staff ReportApproved 04/19/05.
 
PETITION NO. 707 - Nextel Communications of the Mid-Atlantic, Inc. d/b/a Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Fuel Cell System at 188 Moody Road, Enfield, Connecticut.  Staff ReportApproved 04/19/05.

PETITION NO. 708 - Westport Broadcasting Co., LLC, Optasite, Inc. and New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing tower or to add a second tower at an existing facility site located at 160 Deer Run Road, Wilton, Connecticut. Withdrawn.

PETITION NO. 709 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to the Long Mountain 13J Switching Station in New Milford, Connecticut. Staff ReportApproved 04/19/05. 

PETITION NO. 710 -The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a power transformer and associated equipment at Barbour Hill Substation, South Windsor, Connecticut.  Staff ReportApproved 04/19/05.

PETITION NO. 711 -PPL Energy Services Holding, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Fuel Cell power plant for the Pepperidge Farm Inc. Facility located at 1414 Blue Hill Avenue, Bloomfield, Connecticut.  Staff Report.  Approved 05/11/05.

PETITION NO. 712 - Omnipoint Communications, Inc. (T-Mobile USA) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed pole replacement and antenna installation located at 41 Padanaram Road, Danbury, Connecticut.   Staff ReportApproved 06/08/05. 

PETITION NO. 713 – Sprint Spectrum, L.P. d/b/a Sprint PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing Connecticut Light and Power transmission structure and antenna installation located at 595 Keeney Street, Manchester, Connecticut.  Staff ReportApproved 06/08/05.

PETITION NO. 714 Sprint Spectrum LP petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 197 South Street, Vernon, Connecticut.   Staff Report.  Approved 06/08/05.

PETITION NO. 715 Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an emergency generator and associated equipment at CL&P’s Middletown Substation.  Staff ReportApproved 07/20/05.

PETITION NO. 716 Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an emergency generator and associated equipment at CL&P’s Norwalk Harbor Substation.  Staff ReportApproved 07/20/05.

PETITION NO. 717 Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an emergency generator and associated equipment at CL&P’s Montville Substation.  Staff ReportApproved 07/20/05.

PETITION NO. 718 Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an emergency generator and associated equipment at CL&P’s Devon Substation, Milford, Connecticut.  Staff ReportApproved 07/20/05.

PETITION NO. 719 Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an emergency generator and associated equipment at CL&P’s South Meadow Substation, Hartford, Connecticut.  Staff ReportApproved 06/08/05.

PETITION NO. 720 The University of Connecticut (UCONN) and Connecticut Light & Power Company petition for a declaratory ruling of no significant adverse environmental effect for the proposed 69-kV underground interconnection line between the UCONN substation and CL&P’s 800 line in Mansfield, Connecticut.   Staff ReportApproved 06/08/05.

PETITION NO. 721 - Nextel Communications, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 171 Town Hill Road, Plymouth, Connecticut.  Staff Report.  Approved 06/28/05.
 
PETITION NO. 722 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 70 Platt Road, Shelton, Connecticut.  Findings of Fact.  Opinion.  Decision and Order.  Approved 11/03/05.
 
PETITION NO. 723 – New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 5 Old Town Park Road, New Milford, Connecticut.  Staff ReportApproved 07/20/05.
 
PETITION NO. 724 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing transmission structure located off Petersen Road in Granby, Connecticut.  Staff Report.  Approved 11/03/05.

PETITION NO. 725 – Iroquois Gas Transmission System petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an impressed current ground bed adjacent to its existing natural gas pipeline in Milford, Connecticut.  Staff ReportApproved 07/20/05.

PETITION NO. 726 - Nextel Communications, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to an existing telecommunications tower located at 331 Route 80, Guilford, Connecticut. Staff Report.  Approved 08/24/05.
 
PETITION NO. 727 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to expand an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. Staff Report.  Approved 08/24/05.

PETITION NO. 728 - New Cingular Wireless PCS, LLC d/b/a Cingular Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to a light pole located at Wicker Street, Putnam, Connecticut.  Denied 09/28/05.

PETITION NO. 729 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to the existing CL&P Green Hill 30R Substation located in Madison, Connecticut. Staff Report.  Approved 08/24/05.

PETITION NO. 730 - Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications and replacement to an existing telecommunications facility located at 60 Commerce Street, East Haven, Connecticut.  Staff Report.  Approved 08/24/05.  Modified 12/21/05.

PETITION NO. 731 - Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 287 Main Street, East Hartford, Connecticut.  Staff Report.   Approved 08/24/05.

PETITION NO. 732 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 115-kV circuit breaker and associated equipment to its existing Flanders 11Y Substation in East Lyme, Connecticut.   Staff Report.  Approved 09/28/05.

PETITION NO. 733 - NextG Networks, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed microcellular antenna installations located in public rights-of-way throughout the State of Connecticut.  Withdrawn.

PETITON NO. 734 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power transmission line structure (#1102) located in Norwalk, Connecticut.   Staff Report.  Approved 09/28/05.

PETITION NO. 735 - Nextel Communications, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 4 Dittmar Road, Redding, Connecticut.  Staff Report 1.   Staff Report 2.   Staff Report 3.  Denied 12/14/05.

PETITION NO. 736 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 126 Ledge Road, Darien, Connecticut. Staff Report.  Denied 09/28/05.

PETITION NO. 737 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Manchester to Hopewell 115-kV Transmission Line Reconductor Project in the Towns of  Manchester and Glastonbury.  Findings of Fact.  Opinion.  Decison and Order.  Approved 09/14/06.   D&M Change Approval.

PETITION NO. 738 – New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located on Knowlton Road, Ashford, ConnecticutStaff Report. 

PETITION NO. 739 - Dianet Communications, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications on a number of existing street light poles/utility poles located in the Town of Greenwich, Connecticut. Withdrawn.

PETITION NO. 740 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 229 Cheshire Road, Prospect, Connecticut.  Staff Report.  Approved 10/19/05.


PETITION NO. 741 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at Quinnipiac University on Mount Carmel Road in the Town of Hamden, Connecticut.  Staff Report.  Approved 10/19/05.

PETITION NO. 742 - PSEG Power Connecticut LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for Phase 1 of Bridgeport Harbor Unit No.3 Mercury Emissions Reduction Project, Bridgeport, Connecticut. Staff Report. Approved 11/03/05.

PETITION NO. 743 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located off Clintonville Road (Route 22), North Haven, Connecticut.  Staff Report.  Approved 12/14/05.

PETITION NO. 744 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located off Whitney Avenue (State Route 10), Hamden, Connecticut.  Staff Report.  Approved 12/14/05.

PETITION NO. 745 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing CL&P telecommunication tower in the Town of Prospect, Connecticut.  Staff Report.  Approved 11/17/05.

PETITION NO. 746 - The Connecticut Municipal Electric Energy Cooperative petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 2 MW emergency generator at Falls Avenue, Hollyhock Island, Norwich, Connecticut.  Staff Report.  Approved 11/17/05.

PETITION NO. 747 - The Connecticut Municipal Electric Energy Cooperative petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of two additional 2 MW emergency generators at 100 John Street, Wallingford and the relocation of one existing 2 MW emergency generator to South Cherry Street, Wallingford, Connecticut.  Staff Report.  Approved 11/17/05.

PETITION NO. 748 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a stealth pole at 1 Fairfield Avenue, Danbury, Connecticut.  Staff Report.  Approved 12/14/05.

PETITION NO. 749 - Nextel Communications, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed extension of a telecommunications facility at 3 Edmond Road, Newtown, Connecticut.  Staff Report.  Approved 12/14/05.

PETITION NO. 750 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a pole within an existing wireless communication tower and array located at 100 Berlin Road, Cromwell, Connecticut.  Staff Report.  Approved 1/25/06.

PETITION NO. 751 - Manchester Methane, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a 3.2 megawatt methane renewable energy project at the NORCAP Landfill in East Windsor, Connecticut.  Staff Report.  Approved 2/22/06.  Staff Report for Modifications.  Modified 7/27/06.

PETITION NO. 752 Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of a Connecticut Light & Power Company electric transmission structure east of Highland Avenue, Wallingford, Connecticut.  

PETITION NO. 753 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a ten foot (10’) extension to an existing wireless communication monopole located at 69 Wheeler Street, New Haven, Connecticut.  Staff Report.  Approved 1/25/06.

PETITION NO. 754 - Best Management Practices for Electric and Magnetic FieldsApproved 12/14/07.  Record.

PETITION NO. 755 - Iroquois Gas Transmission System, L.P. petition for declaratory ruling that the Connecticut Siting Council does not have jurisdiction over additions to Iroquois’ authorized Natural Gas Compressor Station located off of High Meadow Road in Brookfield, Connecticut. Staff ReportApproved 2/22/06.
 
PETITION NO. 755A - (Petition Record)  Iroquois Gas Transmission System, L.P. application submitted to the Federal Energy Regulatory Commission to modify the existing interstate natural gas pipeline by the addition of a compressor station off of High Meadow Road in Brookfield, Connecticut.  Findings of Fact.  Opinion and Recommendations.  Voted on 6/27/06.

PETITION NO. 756 - PSEG Power Connecticut LLC petition for declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for Phase 2 of Bridgeport Harbor Unit No. 3 Mercury Emissions Reduction Project, Bridgeport, Connecticut. Staff Report. Approved 3/22/06.


PETITION NO. 757 - Algonquin Gas Transmission, LLC petition for declaratory ruling that the Connecticut Siting Council does not have jurisdiction over the proposed installation of a natural gas compressor station located in Oxford, Connecticut.   Staff Report.   Approved 2/22/06.
 
PETITION NO. 757A - (Petition Record)  An application by Algonquin Gas Transmission, LLC submitted to the Federal Energy Regulatory Commission.  Algonquin proposes to construct a Natural Gas Compressor Station at one of two locations in Oxford, Connecticut, and a Natural Gas Meter Station off High Meadow Road, Brookfield, ConnecticutFindings of Fact.  Opinion and Recommendations.  Voted on 6/27/06.
 
PETITION NO. 758 - Optasite, Inc. petition for a declaratory ruling that an amended Certificate of Environmental Compatibility and Public Need is not required for the modification of an existing facility located at 3 Edmond Road in Newtown, Connecticut. Approved 3/8/06.
 
PETITION NO. 759 – Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of a Connecticut Light & Power Company electric transmission structure located at 61 Hawthorne Drive North, New London, Connecticut.  Staff Report.  Approved 3/8/06.

PETITION NO. 760 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Sasco Creek Substation located at Clayton Street, Westport, Connecticut. Staff Report. Approved 3/22/06.

PETITION NO. 761 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Frost Bridge Substation, located on Frost Bridge Road, Watertown, ConnecticutStaff Report.  Approved 4/27/06.

PETITION NO. 762 - Dominion Nuclear Connecticut, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of a generator step-up transformer and four new towers to support on-site power lines at Millstone Power Station, Waterford, Connecticut.  Staff Report.  Approved 5/17/06. 

PETITION NO. 763 – Dr. Carl Bornemann petition for a declaratory ruling to void the Connecticut Siting Council’s ruling on Petition No. 701 submitted by Nextel Communications, Inc. to modify CL&P transmission structure #2010 located near 145 Beebe Hill Road, Canaan, Connecticut. Decision Letter.  Dismissed 10/12/06.


PETITION NO. 764 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a ten foot (10’) extension to an existing CL&P transmission tower located at 437 Hobart Street, Southington, Connecticut.  Staff Report.  Approved 5/17/06.

PETITION NO. 764A - T-Mobile Northeast LLC (T-Mobile) request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to relocate an existing T-Mobile facility attached to an Eversource transmission line structure (#1814) onto an approved replacement electric transmission line structure (#1814) within the existing Eversource right-of-way located at 437 Hobart Street, Southington, Connecticut.  Approved 09/15/16.

PETITION NO. 765 - Optasite, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of an existing tower facility at 107 Wilcox Road, Stonington, ConnecticutStaff Report.  Approved 6/7/06.


PETITION NO. 766 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing facility located at 850 West Main Street, Branford, Connecticut.  Staff Report.  Approved 5/17/06.


PETITION NO. 767 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the CL&P’s South End Substation, Stamford, ConnecticutStaff Report.  Approved 6/7/06.


PETITION NO. 768 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the CL&P’s Waterside Substation, Stamford, ConnecticutStaff Report.  Approved 6/7/06.


PETITION NO. 769 - Optasite, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed relocation of the telecommunications facility approved at 459 Burr Road, Southbury, Connecticut.   Approved 6/7/06.


PETITION NO. 770/DOCKET NO. 272 - Middletown Royal Oak Residents petition for a declaratory ruling to intervene or be designated as parties in Docket No. 272, stating the Royal Oak Bypass proposed by The Connecticut Light and Power Company in its proposed Development and Management Plan (D&M Plan) for Docket No. 272 is not in accordance with the Findings of Fact, Opinion, and Decision and Order issued on April 7, 2006; proper notice was not given to the Royal Oak Bypass residents; and the new route would adversely affect their properties and way of life.  Petition rendered moot by Council decision on Royal Oak Bypass Plan, 6/7/06.


PETITION NO. 771 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing transmission structure located at 652 River Road (State Route 12), Lisbon, Connecticut.  Staff Report.  Approved 6/7/06.


PETITION NO. 772 - Waterside Power, LLC, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to the Waterside 69.2 MW peaking project, 17 Amelia Place, Stamford, Connecticut.  Staff Report.  Approved 7/27/06.

PETITION NO. 773 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing facility located at 8 Park Lane, Newtown, Connecticut.  Staff Report.  Approved 7/27/06.

PETITION NO. 774 - Omnipoint Communications, Inc. and New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing facility located at 136 Vinegar Hill Road, Ledyard, Connecticut.  Staff Report.  Approved 7/27/06.

PETITION NO. 775 – T-Mobile petition for a declaratory ruling that no Certificate is required for the proposed modifications to an existing facility at 259 Commerce Street, East Haven, Connecticut. Withdrawn.

PETITION NO. 776 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing facility located at 575 Hillstown Road, Manchester, Connecticut.  Staff Report.  Approved 7/26/06.

PETITION NO. 777 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing facility located at 126 South Street (a/k/a 42 South Street), Plymouth, Connecticut.  Staff Report.   Approved 7/26/06.
 
PETITION NO. 778 - Connecticut Municipal Electric Energy Cooperative (CMEEC) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed repowering of the Alfred L. Pierce Generating Station located at 195 East Street, Wallingford, Connecticut.  Staff Report 1.  Staff Report 2.  Approved 9/28/06.
 
PETITION NO. 779 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing facility located at 138 Main Street, Coventry, Connecticut. Staff Report.  Approved 8/31/06.
 

PETITION NO. 780 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Plumtree Substation, Bethel, Connecticut.  Staff Report.  Approved 8/31/06.


PETITION NO. 781 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 36 Ayer Road, Franklin, Connecticut.  Staff Report.  Approved 8/31/06.


PETITION NO. 782 – ClearLinx Network Corporationpetition for a declaratory ruling no Certificate of Environmental Compatibility and Public Need is required for the proposed construction of a stealth Distributed Antenna System along the Merritt Parkway corridor from east of New York state line to Westport, Connecticut.  Withdrawn.


PETITION NO. 783 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Barbour Hill Substation, South Windsor, Connecticut.  Staff Report.  Approved 9/28/06.


PETITION NO. 784 – Plainfield Renewable Energy, LLC petition for a declaratory ruling no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a 37.5 MW Wood Biomass Generating Project, Plainfield, Connecticut. RecordFindings of FactOpinionDecision and Order.    Approved 5/22/07. 

PETITION NO. 785 - Bridgeport Fuel Cell Park petition for a declaratory ruling no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 14.4 MW Fuel Cell Electric Project located on Hancock Street, Bridgeport, Connecticut.  Staff Report.  Approved 10/31/06.


PETITION NO. 786 - The United Illuminating Company petition for a declaratory ruling no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing United Illuminating Company’s transmission line for the Fairfield Rail Station, located off of Timko Street and Frank Street, Fairfield, Connecticut.  Staff Report.  Approved 09/14/06.

 

PETITION NO. 787 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to install two new steel poles within an existing United Illuminating Company’s transmission line (Circuit Nos. 1560 and 1594) north of the Ansonia Substation 3 Riverside Drive, Ansonia, Connecticut.  Staff Report.  Approved 9/28/06.


PETITION NO. 788 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Cedar Heights Substation, located at Rapids Road, Stamford, ConnecticutStaff Report.  Approved 9/28/06.


PETITION NO. 789 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Connecticut Light & Power Company’s Stony Hill Substation, located on Stony Hill Road, Brookfield, Connecticut. Staff Report.   Approved 9/28/06.


PETITION NO. 790 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Distribution Automation Master Radio Project at four of The United Illuminating Company’s substations: Trap Falls Substation, Armstrong Road, Shelton; Indian Well Substation, Roosevelt Drive, Derby; Ansonia Substation, Riverside Drive, Ansonia; and North Haven Substation, State Street, North Haven, Connecticut. Staff Report.  Approved 10/10/06.


PETITION NO. 791 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing telecommunications facility located at 130 Ledge Road, Darien, ConnecticutStaff Report.  Approved 10/31/06.


PETITION NO. 792 - Global Signal petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the relocation, construction, maintenance and operation of a telecommunications facility located at 1919 Boston Post Road, Guilford, Connecticut.   P&I Approval and Request to be Resubmitted as a Docket.


PETITION NO. 793 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light & Power Company 115-kV transmission line, Brookfield, Connecticut. Staff Report. Decision Letter.  Approved 2/6/07.


PETITION NO. 794 - Clearview Renewable Energy, LLC petition for a declaratory ruling no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 29.0 MW Mixed Biomass Generating Project located at the Kofkoff Egg Farm, Bozrah, Connecticut.  Withdrawn 10/07/09.

PETITION NO. 795 – Sprint Nextel Corporation Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is Required for the temporary placement of a cell on wheels (COW) adjacent to the Danbury Fair Mall at 10 Precision Road, Danbury, Connecticut.  Approved 11/22/06Extension of Time Approval.

PETITION NO. 796 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light & Power Company transmission line, located at 8 Sky Edge Lane, Bethel, Connecticut.  Staff Report.   Approved 1/4/07.


PETITION NO. 797 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light & Power Company substation, located at 401 Flax Hill Avenue, Norwalk, Connecticut.    Decision LetterApproved 1/18/07.

PETITION NO. 798 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing telecommunications facility located at 477 Route 7, Sharon, Connecticut.  Decision Letter and Staff ReportApproved 2/6/07.

PETITION NO. 799 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of an existing gas station sign with a telecommunications pole located at 207 West Street, Cromwell, Connecticut.  Decision Letter and Staff Report.   Approved 1/18/07.

PETITION NO. 800 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of an existing telecommunications facility located at Willis Street, Bristol, Connecticut.  Decision Letter and Staff Report Approved 1/18/07.

PETITION NO. 801 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light & Power Company substation, located at Naugatuck Avenue, Milford, Connecticut.  Decision Letter and Staff Report.   Decision Letter and Staff Report.  Decision Letter and Staff ReportApproved 1/18/07.

PETITION NO. 802 - Petition for a Declaratory Ruling filed by the Town of Middlebury, Mr. Raymond Pietrorazio, Citizens for the Defense of Oxford, William Stowell, and Mira Schachne (Petitioner) contending that the Connecticut Siting Council actions to extend the Certificate deadline are void in accordance with Conn. Gen. Stat. § 16-50k(c), § 16-50l(d), § 16-50m(b), or § 4-181a(b).  DecisionDecided on 1/04/07.

PETITION NO. 803 – Sprint Nextel Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 130 Ledge Road, Darien, Connecticut.  Staff Report.  Decision LetterApproved 4/10/07.

PETITION NO. 804 – Sprint Nextel Corporation Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility, located at 234 Melba Street, Milford, Connecticut.  Staff Report.  Decision LetterApproved 4/10/07.

PETITION NO. 805 - Ansonia Generation LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a 58.4 MW combined heat and power natural gas-fired electric generating facility and transmission line tap located at 75 Liberty Street, Ansonia, Connecticut.   Link to Other Documents in this Proceeding.  Decision Letter.  Approved 7/26/07.
 
PETITION NO. 806 – Omnipoint Communications, Inc. (T-Mobile) Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility, located at 191 Middle Haddam Road, Portland, Connecticut.  Staff Report.  Decision Letter.  Approved 5/01/07.
 
PETITION NO. 807 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 723 Farmington Avenue, New Britain, Connecticut. Staff Report. Decision Letter. Approved 5/01/07.
 
PETITION NO. 808 - FirstLight Hydro Generating Company petition for a declaratory ruling that the Connecticut Siting Council does not have jurisdiction for the proposed upgrade modifications to an existing Shepaug Hydroelectric Facility located on the Housatonic River, Southbury, Connecticut. Decision Letter. Ruling issued on 5/01/07.

PETITION NO. 809 - Extenet Systems, Inc. petition for a declaratory ruling that the Connecticut Siting Council does not have jurisdiction or, in the alternative, that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction of a Distributed Antenna System along the Merritt Parkway from New York state line to Westport, Connecticut.   Findings of Fact, Opinion, and Decision and Order.  RecordRuling issued on 11/05/07.

PETITION NO.  810 - City of Middletown petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a 200 kW fuel cell located at the new Middletown High School, Wilderman’s Way, Middletown, Connecticut. Staff Report.  Decision Letter.   Approved 6/07/07.
 
PETITION NO. 811 - Reconsideration of Issues Decided in Petition No. 344.  Decision.
 
PETITION NO. 812 - Connecticut Jet Power LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of two 20 MW peaking units located at the Cos Cob facility, Sound Shore Drive, Greenwich, Connecticut.  Staff Report.  Approved 7/26/07.

PETITION NO. 813 - Kimberly-Clark Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a combined heat and power electric generating facility, located at 58 Pickett District Road, New Milford, Connecticut. Staff Report.  Decision Letter. Approved 6/07/07. 

PETITION NO. 814 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to two existing 115-kV transmission lines, located between Carpenter Lane Junction and North Wallingford Substation, and associated conductor work near Colony Substation, Wallingford, Connecticut.  Staff Report.  Decision Letter.  Approved 6/07/07.

PETITION NO. 815 – Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that the Connecticut Siting Council has an advisory role to the Federal Energy Regulatory Commission regarding Iroquois’s 08/09 expansion project in Brookfield, Newtown, and Milford, Connecticut. Findings of Fact. Opinion/Recommendations. Decided 11/29/07.

PETITION NO. 816 - Waterbury Generation LLC petition for a declaratory ruling regarding the process to be used by the Connecticut Siting Council for review and approval of a proposed combustion turbine peaking facility, located at 725 Bank Street, Waterbury, Connecticut. Decision Letter of 7/03/07.

PETITION NO. 817 - The Connecticut Municipal Electric Energy Cooperative (CMEEC) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a 2 MW emergency generator located at John Street, Wallingford, Connecticut.  Staff Report. Approved 7/03/07.

PETITION NO. 818 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Frost Bridge 8R Substation located at Frost Bridge Road, Watertown, Connecticut.  Staff Report.  Approved 7/03/07.

PETITION NO. 819 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Weston Substation, Weston Road, Weston, Connecticut.  Staff Report. Approved 7/03/07.

PETITION NO. 820 - Omnipoint Communications, Inc. a.k.a. T-Mobile petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of antennas inside an existing silo located at 90 Hattertown Road, Newtown, Connecticut. Staff Report. Approved 7/26/07.

PETITION NO. 821 - Connecticut Light & Power Company’s petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing CL&P substation located at Depot Hill Road, Enfield, Connecticut. Staff Report. Approved 7/26/07.

PETITION NO. 822 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications tower located at 1662 Gold Star Highway, Groton, Connecticut. Staff Report. Approved 7/26/07.

PETITION NO. 823 - Sprint Nextel Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light & Power electrical transmission structure (pole #8012) located at Maple Ridge Drive, Farmington, Connecticut.  Staff Report.  Approved 8/29/07.

PETITION NO. 824 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of an existing telecommunications facility located on Chapel Hill Road, Montville, Connecticut. Staff Report. Approved 7/26/07.

PETITION NO. 825 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed visual improvements at the Triangle Substation facility in Danbury, Connecticut. Staff Report. Approved 8/29/07.

PETITION NO. 826 - Sprint Nextel Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the placement of a temporary mobile radio communications facility (COW) at Quinnipiac University Law School, 60 West Woods Road, Hamden, Connecticut. Staff Report. Decision Letter.  Approved 7/26/07.

PETITION NO. 827Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing telecommunication tower owned by Northeast Utilities located at 705 West Johnson Avenue, Cheshire, Connecticut. Staff Report. Approved 9/25, 2007.

PETITION NO. 828DFG-ERG Milford, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a fuel cell facility located at 775 Oronoque Road, Milford, Connecticut. Staff Report.  Status Update - Not Constructed Letter. Approved 10/16/07.

PETITION NO. 829The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of an existing telecommunications tower located at 626 Glenbrook Road, Stamford, Connecticut. Staff Report.  Approved 11/05/07

PETITION NO. 830Wesleyan University petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed 2,398 kW natural gas-powered cogeneration project located at 280 Williams Street, Middletown, Connecticut.  Staff Report. Approved 10/16/07.

PETITION NO. 831Waterbury Generation LLC petition for a declaratory ruling no Certificate of Environmental Compatibility and Public Need is required for the construction of an electric generating facility and associated transmission line tap located at 725 Bank Street, Waterbury, Connecticut. Record, Findings of FactOpinionDecision and Order.  Approved 4/10/08.

PETITION NO. 832Nextel Communications, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at North Main Street, Marlborough, Connecticut. Staff Report. Approved 2/28/08.

PETITION NO. 833The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing double-circuit 115-kV transmission line from Christian Street Junction in Oxford, Connecticut, to Beacon Falls Substation in Beacon Falls, Connecticut. Staff Report. Approved 11/29/07.

PETITION NO. 834Watertown Renewable Power, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 30 MW biomass gasification generating project located at Echo Lake Road, Watertown, Connecticut. RecordFindings of FactOpinionDecision.   Approved 4/24/08.

PETITION NO. 835Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing telecommunications facility located at 1294 Pleasant Valley Road North, Groton, Connecticut. Staff Report. Approved 12/13/07.

PETITION NO. 836Waterside Power LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a permanent peaking facility located at 17 Amelia Place, Stamford, Connecticut. Record. Findings of Fact.  Opinion. Decision and Order.  Approved 5/8/08.

PETITION NO. 837 - United Recycling and Energy, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed 5-12 MW Biomass Renewable Energy Plant located at 90 Oliver Terrace, Shelton, Connecticut. Status Letter. No Decision.

PETITION NO. 838The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification to an existing 345/115-kV Substation located on Walnut Hill Road, Bethel, Connecticut.  Staff Report.  Approved 4/10/08.

PETITION NO. 839The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need for a modification to an existing 345/115-kV Switching Station located on Long Mountain Road, New Milford, Connecticut. Staff Report.  Staff Report for Revised Plan.  Approved 2/28/08.  Revision Approved 8/28/08.

PETITION NO. 840 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to the Stepstone Substation, Guilford, Connecticut.  Staff ReportApproved 1/10/08.

PETITION NO. 841 – The Bridgeport Energy II, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation and maintenance of a 350 MW Peaking Facility at the existing Bridgeport Energy Facility located at 10 Atlantic Street, Bridgeport, Connecticut.   Record, Findings of Fact, Opinion, Decision and Order,   Approved 6/5/08. 

PETITION NO. 842 The Sprint Nextel Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the attachment of Sprint’s Antennas to an existing CL&P Tower located at 40 Barton Lane, Ledyard, Connecticut. Withdrawal LetterWithdrawn.

PETITION NO. 843 The NRG Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of four 50 MW Peaking Units at its Devon Facility located at 700 Naugatuck Avenue, Milford, Connecticut.  Staff Report.  Approved 1/24/08.   Amended 6/4/09.

PETITION NO. 844The Omnipoint Communications, Inc. a/k/a T-Mobile petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a ten (10) foot extension of an existing monopole located at 188 Moody Road, Enfield, Connecticut.  Staff Report.  Approved 1/24/08.

PETITION NO. 845The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed 115-kV Transmission Line Removal Project in the Towns of East Haddam, Lyme, East Lyme and Montville, Connecticut.  Staff Report.  Approved 1/24/08.

PETITION NO. 846The Pfizer Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed addition to the combined heat and electric generating facility located at 445 Eastern Point Road, Groton, Connecticut.  Staff Report.  Approved 2/28/08.

PETITION NO. 847Pepperidge Farm, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 1.2 megawatt fuel cell located at 1414 Blue Hills Avenue, Bloomfield, Connecticut. Staff Report. Approved 2/14/08.

PETITION NO. 848Frito-Lay, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a 5MW electric generating facility located at 1886 Upper Maple Street,  Dayville, Connecticut. Staff Report. Approved 3/13/08.

PETITION NO. 849 – Cellco Partnership d/b/a Verizon Wireless  petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications tower located at 651 Paddock Avenue, Meriden, Connecticut.  Withdrawn 02/19/08.

PETITION NO. 850 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the expansion of an existing site compound located at 35 Wildwood Street, New Britain, Connecticut. Staff Report. Approved 3/13/08.

PETITION NO. 851 – Dominion Nuclear Connecticut, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement and relocation of two existing auxiliary boiler fuel tanks and sandblasting facility building located at the Millstone Power Station, Waterford, Connecticut. Staff Report. Approved 4/24/08.

PETITION NO. 852 MediaFLO USA, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 49B Cow Hill Road, Clinton, Connecticut. Verbally Withdrawn.

PETITION NO. 853The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed lighting modification to the Housatonic River transmission towers in Town of Stratford and City of Milford, Connecticut.  Staff Report.  Approved 4/10/08.

PETITION NO. 854 – PPL Savage Alert, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of an ORMAT Energy Converter (OEC) at the Naugatuck Wastewater Treatment Facility located at 500 Cherry Street, Naugatuck, Connecticut. Staff Report.  Approved 4/24/08.

PETITION NO. 855 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing substation in the Town of Litchfield and City of Torrington, Connecticut. Staff Report. Approved 5/8/08.

PETITION NO. 856 – Dominion Nuclear Connecticut, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of the Unit 3 Generator Step-Up Transformer located at Millstone Power Station, Waterford, Connecticut. Staff Report.  Approved 5/8/08.

PETITION NO. 857 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Norwalk Harbor Substation in the City of Norwalk, Connecticut.  Staff Report.  Approved 6/26/08.

PETITION NO. 858 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing North Bloomfield 2A Substation located at 2 Hoskins Road in the Town of Bloomfield, Connecticut. Staff Report. Approved 7/10/08.

PETITION NO. 859 – Dominion Nuclear Connecticut, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of five enclosures to house new variable frequency drive systems to be connected to the circulating water system pump motors located at Millstone Power Station, Waterford, Connecticut. Staff Report. Approved 7/24/08.

PETITION NO. 860 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Mystic Substation located east of Dennison Avenue (Route 27) and north of Pleasant Street, Stonington, Connecticut.  Staff Report.  Approved 8/28/08.

PETITION NO. 861 – Bridgeport Energy II, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation and maintenance of the transmission line tap for the approved 350 MW peaking facility located at 10 Atlantic Street, Bridgeport, Connecticut.  Staff Report.  Approved 9/11/08.

PETITION NO. 862 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary telecommunications facility at 500 Queen Street, Southington, Connecticut. Staff Report. Approved 8/28/08.  Extended 6/4/09.

PETITION NO. 863 - Examination of whether statutory changes should be made to clarify jurisdiction to renewable and/or alternative sources of energy (wind, solar, hydro, tidal, wave, geothermal, biofuel, biomass, etc).  Staff Report.  Approved 05/07/10.

PETITION NO. 864 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing single-circuit 115kVtransmission line between Cook Hill Junction in Cheshire, Connecticut and Lucchini Junction in Meriden, Connecticut.  Staff Report.  Approved 10/16/08.

PETITION NO. 865 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed relocation of an existing 115kV transmission line structure (#1966) east of Nonnewaug Road, Woodbury, Connecticut.  Staff Report.  Approved 10/16/08.

PETITION NO. 866 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to the existing Flax Hill Substation located at 401 Flax Hill Road, Norwalk, Connecticut. Staff Report. Approved 10/16/08.

PETITION NO. 867 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to the existing CL&P Waterside Substation located at 39 Amelia Place, Stamford, Connecticut.  Staff Report.  Approved 11/20/08.

PETITION NO. 868 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing 115Kv transmission line structure (#9950) located off of Crow’s Nest Lane, Danbury, Connecticut.  Staff Report.  Approved 11/20/08.
 
PETITION NO. 869 - Algonquin Gas Transmission, LLC petition for declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed interconnection of  Algonquin’s existing W-System with the Kleen Energy Generating facility off River Road in Middletown, Connecticut. Staff Report.  Approved 12/04/08.
 
PETITION NO. 870 – The Hartford Steam Company petition for declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed location, installation and operation of a 3.5 megawatt co-generation facility located at 60 Columbus Boulevard, Hartford, Connecticut. Staff Report.  Approved 11/20/08.

PETITION NO. 871 - Algonquin Gas Transmission Company Federal Energy Regulatory Commission (FERC) application (Docket No. 08-426) for the construction and operation of the HubLine/East to West Project located in Massachusetts, Connecticut, Rhode Island and New Jersey. Connecticut segment includes replacement of 11 miles of existing pipeline, appurtenant infrastructure, and installation of access roads in the Towns of Norwich, Preston, Ledyard, and North Stonington as well as upgrades to an existing compressor station in Cromwell. Final EIS Staff Report.  Approved 12/18/08.

PETITION NO. 872 - Omnipoint Communications, Inc. a.k.a. T-Mobile petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need for the proposed antennas to be installed on an existing Connecticut Light and Power Company-owned transmission line structure located at 48 Quail Trail, Trumbull, Connecticut.  Staff Report.  Approved 12/04/08.
 
PETITION NO. 873 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed transmission Separation Project of a 1.8 mile segment of an existing 345-kV double-circuit (#s 310/368) from south of Manchester substation to Manchester Junction and relocation/replacement of the adjacent 115-kV circuit (#1767) of this route located in Manchester, Connecticut.  Staff Report.  Approved 12/04/08.
 
PETITION NO. 874 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing fence line at UI’s Old Town Substation located at 280 Kaechele Place, Bridgeport, Connecticut. Staff Report.  Approved 12/04/08.
 
PETITION NO. 875 - GenConn Energy LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation and operation of four 50 MW peaking units at the Middletown Station located at 1866 River Road, Middletown, Connecticut.  Staff Report.  Approved 12/04/08.
 
PETITION NO. 876 - The United Illuminating Company petition for a declaratory ruling that noCertificate of Environmental Compatibility and Public Need is required for the proposed Advanced Metering Infrastructure Project located at the proposed substations; Allings Crossing Substation, Frontage Road, West Haven; Ash Creek Substation, Poland Street, Bridgeport; Baird Substation, Stratford Avenue, Stratford, Barnum Substation Barnum Avenue, Stratford; Broadway Substation, Goffe Street, New Haven; Congress Substation, Congress Street, Bridgeport; Devon Tie Substation, Naugatuck Avenue, Milford; East Shore Substation, Waterfront Street, New Haven; Elmwest Substation, Elm Street, West Haven; June St. Substation, Hazell Terrace, Woodbridge; Mill River Substation, Grand Avenue, New Haven; Old Town Substation, Kachele Place, Bridgeport; Pequonnock Substation, Henry Street, Bridgeport; Sackett Substation, State Street, North Haven; and Water Street Substation, Water Street, New Haven.  Staff Report.  Approved 12/18/08.
 
PETITION NO. 877 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Amendment to the Certificate of Environmental Compatibility and Public Need is required for the extension of an existing tower located at 125 Mile Creek Road, Old Lyme, Connecticut.  Staff Report. Approved 01/08/09.
PETITION NO. 878 - Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 85 Plainfield Avenue, West Haven, Connecticut.  Staff Report.  Approved 02/19/09.
 
PETITION NO. 879 - Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 117 Washington Street, North Haven, Connecticut. Staff Report. Approved 03/12/09.
 
PETITION NO. 880 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a permanent replacement flagpole tower and associated equipment located at 500 Queen Street, Southington, Connecticut.  Staff Report.  Approved 01/22/09.

PETITION NO. 881 - The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of the existing switching station infrastructure and control building located at UI’s existing Grand Avenue Switching Station, New Haven, Connecticut.  Staff Report.   Approved 02/19/09.

PETITION NO. 882 - The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of two low-noise transformers along with associated equipment located at UI’s Broadway 115/13.8 kV Substation, New Haven, Connecticut.  Staff Report.   Approved 02/19/09. 

PETITION NO. 883 - Omnipoint Communications, Inc. a.k.a. T-Mobile petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing telecommunications facility located at 70 Platt Road, Shelton, Connecticut. Staff Report. Approved 01/22/09.

PETITION NO. 884 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal of an out-of-service transmission line segment between Portland Substation and Ames Junction in the Town of Portland, Connecticut.  Staff Report.   Approved 02/19/09. 

PETITION NO. 885 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 115 Industrial Park Road, New Hartford, Connecticut.  Staff Report.  Approved 03/12/09. 

PETITION NO. 886 - American Tower Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace and expand an existing telecommunications facility located at 15 Miner Lane, Waterford, Connecticut.  Staff Report.  Approved 04/07/09.

PETITION NO. 887 - Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 150 North Main Street, Branford, Connecticut.  Staff Report.  Approved 03/12/09. 

PETITION NO. 888 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing single-circuit 115-kV transmission line (circuit #1860) between Larson Junction United Technologies Substation in the Town of Southington, Connecticut.  Staff Report.  Approved 03/12/09. 

PETITION NO. 889 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 219 New Park Avenue, Hartford, Connecticut.  Staff Report.  Approved 03/12/009. 

PETITION NO. 890 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal of a single-circuit 345-kV transmission line segment between Chestnut Junction in Middletown, Connecticut and Oxbow Junction in Haddam, Connecticut.  Staff Report.  Approved 04/07/09. 

PETITION NO. 891 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Willimantic Substation in the Town of Windham located at 1270 Main Street, Willimantic, Connecticut.  Staff Report.  Approved 04/07/09. 

PETITION NO. 892 - The Connecticut Municipal Electric Energy Cooperative (CMEEC) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation and operation of a 2.5 megawatt electric generator and associated equipment located at 31 School Street, Jewett City (Griswold), Connecticut.  Staff Report.  Approved 04/23/09.

PETITION NO. 893 - The Connecticut Municipal Electric Energy Cooperative (CMEEC) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation and operation of two 2.5 megawatt electric generators and associated equipment on each property located at 57 Salem Turnpike, 145 Old Salem Road and 10 Wisconsin Avenue in the Town of Norwich, Connecticut.  Staff Report and Decision Letter CMEEC Partial Withdrawal Request and CSC Acknowledgement of RequestApproved 04/23/09. 

PETITION NO. 894 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing six CL&P Substations located at Tomac Avenue, Greenwich; 7 Prange Road, Brookfield; 52 Peaceable Street, Redding; 85 ½ Weston Road, Weston; 164 North Eagleville Road, Mansfield; and Roosevelt Avenue, Preston, Connecticut.  Staff Report.  Approved 05/07/09.   

PETITION NO. 895 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing wireless telecommunications tower located at 29 Bogus Hill Road, New Fairfield, Connecticut.  Staff Report.  Approved 06/04/09.

PETITION NO. 896 - The Connecticut Municipal Electric Energy Cooperative (CMEEC) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of four 2.5 megawatt emergency generators at two locations, adjacent to existing electrical substations and infrastructures located at 1268 Poquonnock Road, and 170 Gary Court in the Town of Groton, Connecticut. Staff Report.  Approved 07/16/09. 

PETITION NO. 897The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal of an existing single-circuit 115-kV transmission line segment between Carpenter Lane Junction and Colony Substation in Wallingford, Connecticut.  Staff Report.  Approved 06/04/09. 

PETITION NO. 898 - Cellco Partnership d/b/a Verizon Wireless petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is Required for the temporary placement of a cell on wheels at 1100 Boston Avenue, Bridgeport, Connecticut. Staff Report. Approved 05/12/09. 

PETITION NO. 899 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed extension of an existing telecommunications tower at 370 Rockland Road, Guilford, Connecticut.  Staff Report.  Approved 06/04/09.

PETITION NO. 900 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to the existing CL&P Norwalk Substation located at New Canaan Avenue, Norwalk, Connecticut. Staff Report.  Approved 06/04/09. 

PETITION NO. 901 - The Connecticut Municipal Electric Energy Cooperative (CMEEC) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation and operation of two 2.5 MW electric generators and associated equipment located at 37 Camp Moween Road, Lebanon, Connecticut.  Staff Report.  Approved 07/16/09. 

PETITION NO. 902 - Pratt & Whitney petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to the existing cogeneration power facility at the Pratt & Whitney manufacturing facility located at 400 Main Street, East Hartford, Connecticut.  Staff Report.  Approved 6/29/09. 

PETITION NO. 903 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing CL&P switching station located at Haley Road, Montville, Connecticut.  Staff Report.  Approved 08/13/09.

PETITION NO. 904 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing CL&P substation located at 109 Olcott Street, Manchester, Connecticut.  Staff Report.  Approved 07/16/09.   Amendment Approved 03/26/10. 

PETITION NO. 905 - New Cingular Wireless PCS, LLC petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is Required for the temporary placement of a cell on wheels (COW) at 1114 East Putnam Avenue, Greenwich, Connecticut.  Staff Report.  Approved 07/16/09. 

PETITION NO. 906 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing 0.8 mile single-circuit 345-kV transmission line (circuit #353) segment between the CL&P Middletown Junction and Kleen Energy in Middletown, Connecticut.  Staff Report.  Approved 07/16/09. 

PETITION NO. 907 - Montville Power LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the retrofit and operation of a 40 MW Biomass-Fueled Generation Unit at the Montville Station in Montville, Connecticut.  Record.  Findings of Fact.  Final Decision.  Approved 02/25/10. 

PETITION NO. 908 - Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 389 Forbes Avenue, New Haven, Connecticut.  Staff Report.  Approved 7/22/09. 

PETITION NO. 909 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 138 Main Street, Coventry, Connecticut. Staff Report. Approved 7/22/09. 

PETITION NO. 910 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 349 Mountain Street, Willimantic, Connecticut.  Staff Report.  Approved 8/27/09.

PETITION NO. 911 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 60 Rice Lane, Beacon Falls, Connecticut.  Staff Report.  Approved 8/27/09.  

PETITION NO. 912 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located on Taugwonk Road, Stonington, Connecticut.  Staff Report.  Approved 8/27/09. 

PETITION NO. 913 - MetroPCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 99 Briar Hill Road, Groton, Connecticut.  Staff Report.  Approved 8/27/09.

PETITION NO. 914 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Plumtree switching station, located at Walnut Hill Road, Bethel, Connecticut.  Staff Report.  Approved 8/27/09.

PETITION NO. 915 - Omnipoint Communications, Inc., a subsidiary of T-Mobile USA, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at Rocky Hill Road, Trumbull, Connecticut.  Staff Report.  Approved 9/17/09. 

PETITION NO. 916 - New Cingular Wireless PCS, LLC petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is Required for the Ten Foot extension of an existing telecommunications facility located at 150 Lost Acres Road, North Granby, Connecticut. Staff Report.  Approved 10/08/09. 

PETITION NO. 917 - MetroPCS New York, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 48 Newtown Road, Danbury, Connecticut.  Staff Report.  Approved 10/22/09. 

PETITION NO. 918 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications at three locations located at Bob White Lane, Trumbull; 36 Center Road, Easton; and corner of Route 80 and Twin Lakes Road, Branford,  Connecticut.   Staff Report.  Approved 11/19/09. 

PETITION NO. 919 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to co-locate on a Council-approved Connecticut Light and Power Company transmission structure associated with the Waterford substation located on Oil Mill Road, Waterford, Connecticut.  Staff Report.  Approved 11/05/09. 

PETITION NO. 920 - The Clearwire Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed extension of an existing tower at 289H Mountain Street in Hartford, Connecticut.  Staff Report.  Approved 11/19/09. 

PETITION NO. 921 - DFC-ERG CT, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Fuel Cell generating facility located at 535 Simsbury Road, Bloomfield, Connecticut.  Staff Report.  Status Update - Not Constructed. Approved 12/03/09.

PETITION NO. 922 - UIL Distributed Resources, LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Fuel Cell generating facility located at 1835 Hebron Avenue, Glastonbury, Connecticut. RecordStaff Report and Decision.  Approved 12/03/09. 

PETITION NO. 923 - Fuel Cell Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation and operation of a Fuel Cell test facility located at 539 Technology Park Drive, Torrington, Connecticut. Staff Report.  Approved 12/03/09. 

PETITION NO. 924 - The Connecticut Municipal Electric Energy Cooperative (CMEEC) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of two (2) 2.5 MW electric generators and associated equipment located at 70 Bridge Street, Groton, Connecticut.  Staff Report.  Approved 12/18/09. 

PETITION NO. 925 - PSEG Power Connecticut LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation and operation of three 48.5 MW peaking units at New Haven Harbor Station, 1 Waterfront Street, New Haven, Connecticut.  Staff Report.  Approved 01/07/10. 

PETITION NO. 926 - The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to UI’s existing East Shore Substation and West River Switching Station, New Haven, Connecticut.  Staff Report.  Approved 02/11/10.   

PETITION NO. 927 - The Clearwire Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 940 Meriden Road, Waterbury, Connecticut.  Staff Report.  Approved 01/07/10. 

PETITION NO. 928 - The Metropolitan District for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction and operation of a Heat Recovery Facility with 1.7 (MW) rated power production via steam generator at the existing Hartford Water Pollution Control Facility (HWPCF) located at 240 Brainard Road, Hartford, Connecticut.  Staff Report.  Approved 01/07/10. 

PETITION NO. 929 - The MetroPCS New York, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the Attachment of Antennas to an Existing Tower at 30 Oliver Terrace in Shelton, Connecticut.  Staff Report.  Approved 02/11/10. 

PETITION NO. 930 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a wireless repeater telecommunications facility at Pride’s Corner Farm Nursery, 122 Waterman Road, Lebanon, Connecticut.  Staff Report.  Approved 02/11/10. 

PETITION NO. 931 - The Clear Wireless LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 181 Clapboard Ridge Road, Danbury, Connecticut. Staff Report.  Approved 02/25/10. 

PETITION NO. 932 - Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing smokestack facility located at 1-3 Oakland Avenue, East Hartford, Connecticut. Staff Report.  Approved 03/26/10. 

PETITION NO. 933 - The Clear Wireless LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the attachment of antennas, dishes and remote radio heads to an existing rooftop telecommunications facility at Danbury Hospital located at 24 Hospital Lane, Danbury, Connecticut. Withdrawal Letter.  Withdrawn 04/09/10.

PETITION NO. 934 - Yankee Gas Services Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 60-foot wooden pole and associated radio communications equipment located at Howe Avenue, Shelton, Connecticut.  Staff Report.  Semi-Annual Status of Construction Report, 12/23/16 Semi-annual Status of Construction Report, 7/03/17  Approved 04/08/10. 

PETITION NO. 935 - The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed switchyard control house expansion to UI’s existing Devon Tie Switch Yard located at 732 Naugatuck Avenue, Milford, Connecticut. Staff Report.  Approved 04/08/10.

PETITION NO. 936 - The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed transmission structure relocation work in connection with the Department of Transportation Moses Wheeler Bridge that carries I-95 over the Housatonic River between Milford and Stratford, Connecticut. Staff Report.  Approved 04/08/10. 

PETITION NO. 937 - The Connecticut Municipal Electric Energy Cooperative (CMEEC) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of two 2.5 MW electric generators and associated equipment at two existing substation locations, 15 Old Colony Road and 130 Thorpe Avenue, Wallingford, Connecticut.  Withdrawn. 

PETITION NO. 938 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P substation, located at 52 Columbus Avenue, Middletown, Connecticut. Staff Report.  Approved  05/06/10. 

PETITION NO. 939 - The MetroPCS New York, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the Attachment of Metro’s Antennas to an existing CL&P transmission structure (#848) located at 2225 Reservoir Avenue, Trumbull, Connecticut. Staff Report.  Approved 05/06/10.

PETITION NO. 940 - The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed transmission structure relocation work in connection with the Department of Transportation West Haven Railroad Station project located in West Haven, Connecticut. Staff Report.  Approved  0/18/10.  

PETITION NO. 941 - The Clear Wireless LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 148 Roberts Street, East Hartford, Connecticut. Staff Report.  Approved 05/06/10.

PETITION NO. 942 - The Clear Wireless LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 82 Lovely Street, Farmington, Connecticut. Record,  Withdrawal Letter.  Withdrawn 07/22/10.

PETITION NO. 943 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at 931 Torringford Street, Torrington, Connecticut. Staff Report.  Approved 05/06/10.

PETITION NO. 944 - The Sprint Nextel Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the placement of a temporary mobile radio communications facility (COW) located at 1000 Middle Street, Middletown, Connecticut.  Staff Report.  Approved 05/27/10. 

PETITION NO. 945 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Ansonia Substation Bus addition project located at 3 Riverside Drive, Ansonia, Connecticut.  Staff Report.  Approved  05/18/10. 

PETITION NO. 946 - T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 181 Clifton Street, New Haven, Connecticut. Withdrawal Letter. Withdrawn.

PETITION NO. 947 - Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the planned addition of an Odorant System to the Iroquois pipeline located at 840 Oronoque Road, Milford, Connecticut.  Staff Report.  Approved 06/17/10.

PETITION NO. 947A - Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an Odorant System to the Iroquois pipeline located at 840 Oronoque Road, Milford, Connecticut.  Staff Report.  Approved 04/28/11. 

PETITION NO. 948 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell to be located at 360 State Street, New Haven, Connecticut.  Staff Report.  Approved 06/17/10. 

PETITION NO. 949 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell to be located at 835 Washington Street, Middletown, Connecticut.  Staff Report.  Approved 07/15/10.   

PETITION NO. 950 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Cos Cob substation, located at Sound Shore Drive, Greenwich, Connecticut. Staff Report.  Approved 06/17/10. 

PETITION NO. 951 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Southington substation, located at 315 Belleview Avenue, Southington, Connecticut. Staff Report.  Approved 06/17/10. 

PETITION NO. 952 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 25.5 foot wall mounted steel pipe-mast and associated equipment radio communications equipment located at 112 Prospect Hill Road, East Windsor, Connecticut. Staff Report.  Approved 07/15/10.

PETITION NO. 953 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of two 400 kW Fuel Cell to be located at 1 Aircraft Road, Middletown, Connecticut. Staff Report.  Approved 07/15/10.

PETITION NO. 954 - The Connecticut Resources Recovery Authority (CRRA) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to the existing CRRA South Meadow Generating Station located at Reserve Road, Hartford, Connecticut.  Staff Report.  Approved 07/29/10. 

PETITION NO. 955 - The Clear Wireless LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 389 Forbes Avenue, New Haven, Connecticut.  Staff Report.  Approved 08/17/10. 

PETITION NO. 956 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 151 Young Street, East Hampton, Connecticut.  Staff Report.  Approved 08/17/10. 

PETITION NO. 957 - Bridgeport Fuel Cell Park, LLC Dominion Bridgeport Fuel Cell, LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a fuel cell generating facility located at Hancock Street, Bridgeport, Connecticut.  Staff Report.  Approved 09/23/10.     

PETITION NO. 958 -The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of a pressurization plant to UI’s West River Switching Station located at 255 Ella T. Grasso Boulevard (State Route 10) Overpass, New Haven, Connecticut.  Staff Report.  Approved 08/26/10. 

PETITION NO. 959 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing CL&P substation in the Forestville section located at 158 Cronin Street, Bristol, Connecticut. Staff Report.  Approved 08/26/10.  

PETITION NO. 960 - The Clearwire Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing facility located at 777 Talcottville Road, Vernon, Connecticut.  Staff Report.  Approved 09/07/10.

PETITION NO. 961 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell to be located at 170 Dewitt Street, New Haven, Connecticut.  Staff Report.  Approved 09/07/10. 

PETITION NO. 962 - The Clear Wireless LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a ten-foot extension to an existing facility at 41 Padanaram Road, Danbury, Connecticut.  Staff Report.   Approved 09/23/10. 

PETITION NO. 963 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Waterside Substation located at 39 Amelia Place, Stamford, Connecticut.  Staff Report.  Approved 09/23/10. 

PETITION NO. 964 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 1593 Exeter Road, Lebanon, Connecticut.  Staff Report.  Approved 10/07/10. 

PETITION NO. 965 - Clear Wireless LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 95 High Street, Portland, Connecticut.  Staff Report.  Approved 11/05/10.

PETITION NO. 966 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Williams Substation located at 469 Williams Street, New London, Connecticut.  Staff Report.  Approved 11/05/10. 

PETITION NO. 967 - Clear Wireless LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the attachments of antennas to a smokestack of an existing facility located at 2825 Fairfield Avenue, Bridgeport, Connecticut.  Staff Report.  Approved 11/05/10.   

PETITION NO. 968 - Algonquin Gas Transmission, LLC petition for declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed addition to the Algonquin interstate natural gas transmission, comprised of a 12-inch diameter lateral located at 1866 River Road, Middletown, Connecticut.  Staff Report.  Approved 11/05/10.

PETITION NO. 969 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a telecommunications facility located at 33 Neptune Avenue, East Haddam, Connecticut.  Staff Report.  Approved 11/05/10. 

PETITION NO. 970 - Yankee Gas Services Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 60-foot wooden pole and associated radio communications equipment located at 10 Murphys Lane, Shelton, Connecticut.  Staff Report.  Semi-Annual Status of Construction Report, 12/23/16 Semi-Annual Status of Construction Report, 07/03/2017 Approved 11/18/10. 

PETITION NO. 971 - T-Mobile USA, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the attachment of antennas to an existing CL&P transmission structure located at Oil Mill Road, Waterford, Connecticut.  Staff Report.  Approved 06/09/11.

PETITION NO. 972 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the expansion of a unipole structure located at the Goshen Fire Department, 1 Palmer Road, Waterford, Connecticut. Staff Report.  Approved 11/18/10.   Staff Report for Amended Decision.  Decision Amended 04/14/11.

PETITION NO. 973 - American Towers, LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace and expand an existing structure located at 880 Andrew Mountain Road, Naugatuck, Connecticut.  RecordFindings of FactOpinionDecision and OrderApproved 04/28/11. 

PETITION NO. 974 - T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing Connecticut Light and Power transmission line tower located at the Oak Hills Golf Course off of Charles Marshall Drive, Norwalk, Connecticut.   Staff Report.  Approved 12/02/10. 

PETITION NO. 975 - Dominion Nuclear Connecticut, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of the Unit 2 Reserve Station Service Transformer and associated disconnect switch and the Unit 2 Normal Station Service Transformer located at Millstone Power Station, Waterford, Connecticut.  Staff Report.  Approved 12/02/10. 

PETITION NO. 976 - PSEG New Haven LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modifications relating to the installation and operation of three 48.5 MW peaking units at New Haven Harbor Station, New Haven, Connecticut.  Staff Report.  Approved 12/16/10.  

PETITION NO. 977 - The Connecticut Light and Power Company notice of intent to modify an existing telecommunications facility located at 26 Chapin Road, New Milford, Connecticut. Staff Report.  Approved 11/05/10.

PETITION NO. 978 - PPL Savage Alert, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 1.9 MW Cogeneration Plant at the ASML Lithography Facility located at 77 Danbury Road, Wilton, Connecticut.  Staff Report.  Ruling Issued on 12/16/10.

PETITION NO. 979 - Bridgeport Energy, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the approval modification in Petition No. 377 for the existing Bridgeport Harbor Station 520 MW combined cycle gas turbine generating facility, in Bridgeport, Connecticut. (See Petition No. 377A)

PETITION NO. 980 - BNE Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 3.2 MW Wind Renewable Generating facility located at 178 New Haven Road, Prospect, Connecticut. RecordFindings of FactOpinionConclusions of LawDissent to Conclusions of LawDecision and Order  Denied 05/12/11.

PETITION NO. 981 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power electric transmission line support structure facility located at 945 North Street, Milford, Connecticut.  Staff Report.  Approved 01/06/11. 

PETITION NO. 982 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of two 400 kW Fuel Cells to be located at 451 Main Street, East Hartford, Connecticut.  Staff Report.   Status Update. Approved 03/03/11. 

PETITION NO. 983 - BNE Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 4.8 MW Wind Renewable Generating facility located on Flagg Hill Road, Colebrook, Connecticut.  Record,   Findings of FactOpinionDissenting OpinionConclusions of LawDecision and Order  Approved 06/02/11.

PETITION NO. 984 - BNE Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 4.8 MW Wind Renewable Generating facility located on Winsted-Norfolk Road (Route 44), Colebrook, Connecticut. Record,  Findings of FactOpinionConclusions of LawDecision and Order.  Approved 06/09/11.

PETITION NO. 985 - T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to an existing telecommunications facility located at 366 Old Long Ridge Road, Stamford, Connecticut.  Staff Report.  Approved 02/08/11. 

PETITION NO. 986 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power substation located at 185 Cherry Hill Road, Newington, Connecticut.  Staff Report.  Approved 03/03/11. 

PETITION NO. 987 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a ten foot extension of an existing telecommunications facility located at 6 Mountain Road, Washington, Connecticut.  Staff Report.  Approved 06/09/11. 

PETITION NO. 988 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a ten foot (10’) extension of an existing telecommunications facility located at 50 Fairchild Road, Middletown, Connecticut.  Staff Report.  Petition Denied 03/31/11/Docket 316 Reopened.

PETITION NO. 989 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell to be located at 350 Grasmere Avenue, Fairfield, Connecticut.  Staff Report.   Status UpdateApproved 04/28/11. 

PETITION NO. 990 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 577 Bell Street, Glastonbury, Connecticut.  Staff Report.  Approved 06/23/11. 

PETITION NO. 991 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power substation located at 970 Corbin Avenue, New Britain, Connecticut. Staff Report. Approved 07/14/11. 

PETITION NO. 992 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the expansion of an existing control house at Ash Creek Substation located at 66 Poland Street, Bridgeport, Connecticut.  Staff Report.  Approved 07/14/11. 

PETITION NO. 993 - Logan Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 300 kW Fuel Cell project to be located at 50 Talbot Lane, South Windsor, Connecticut.  Staff Report.  Approved 07/14/11. 

PETITION NO. 994 - Algonquin Power Windsor Locks, LLC Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for construction, maintenance, and operation of a 15 MW combined heat and power unit at an existing cogeneration facility located at 26 Canal Bank Road, Windsor Locks, Connecticut.  Staff Report.  Approved 07/14/11. 

PETITION NO. 995 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell at 195 Governors Highway, South Windsor, Connecticut.  Staff Report.  Status UpdateApproved 07/14/11. 

PETITION NO. 996 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell located on High Street, Hartford, Connecticut. Staff Report.  Status UpdateApproved 07/28/11.

PETITION NO. 997 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power substation located at 315 Bellview Avenue, Southington, Connecticut.  Staff Report.  Approved 07/28/11. 

PETITION NO. 998 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power substation located at Franklin Drive, Torrington, Connecticut. Staff Report.  Approved 08/11/11. 

PETITION NO. 999 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power substation located at Manhattan Street, Stamford, Connecticut. Staff Report.  Approved 08/11/11. 

PETITION NO. 1000 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission remediation activities pursuant to the North American Electric Reliability Corporation (NERC) facility ratings recommendation to industry.  Staff Report.  Approved 08/11/11.

PETITION NO. 1001 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing equipment compound located at 219 New Park Avenue a/k/a 219 New Park Road, Hartford, Connecticut. Staff Report.  Approved 08/25/11. 

PETITION NO. 1002 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell located at 2040 Dixwell Avenue, Hamden, Connecticut. Staff Report.  Status UpdateApproved 09/08/11. 

PETITION NO. 1003 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power substation located on South Main Street (Route 25), Newtown, Connecticut. Staff Report. Approved 09/22/11. 

PETITION NO. 1004 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing equipment compound located at 60 South Main Street, East Granby, Connecticut.  Staff Report.  Approved 09/22/11.

PETITION NO. 1005 - New Britain Renewable Energy, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 1.4 MW Fuel Cell combined heat and power generating facility located at Central Connecticut State University, New Britain, Connecticut.  Staff Report.   Completion Letter. Approved 09/22/11.

PETITION NO. 1006 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing guyed lattice tower located at 181 Garden Hill Circle, Waterbury, Connecticut. Staff Report.  Approved 10/06/11.

PETITION NO. 1007 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of existing double circuit 345-kV transmission lines in Waterford, Connecticut.  Staff Report. Approved 10/06/11. 

PETITION NO. 1008 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell located at UCONN Center for Clean Energy Engineering, 44 Weaver Road, Storrs, Connecticut.  Staff Report.  Approved 11/03/11. 

PETITION NO. 1009 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 85-foot steel pole and associated radio communications equipment located at Rapids Road, Stamford, Connecticut.  Staff Report.  Approved 12/15/11. 

PETITION NO. 1010 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an concealed tower on a water tank and associated equipment at a water treatment water plant located at 455 Valley Road, Greenwich, Connecticut. Record.  Findings of Fact.  Opinion.  Decision and Order.  Approved 03/29/12. 

PETITION NO. 1011 - MetroPCS New York, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the attachment of antennas to an existing CL&P structure located at 750 Chapel Road, Stratford, Connecticut.  Staff Report.  Approved 11/17/11.

PETITION NO. 1012 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing telecommunications facility located at 75 Wells Road, Wethersfield, Connecticut.  Staff Report.  Approved 12/01/11.

PETITION NO. 1013 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed 8300 Line reconfiguration in New Haven, Connecticut.  Staff Report.  Approved 12/01/11.

PETITION NO. 1014 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at Eastern CT State University, 83 Windham Street, Willimantic, Connecticut.  Staff Report.  Status UpdateApproved 12/15/11. 

PETITION NO. 1015 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at New Haven City Hall, 200 Orange Street, New Haven, Connecticut.  Staff Report.  Status UpdateApproved 12/15/11. 
 
PETITION NO. 1016 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at St. Francis Hospital, 114 Woodland Street, Hartford, Connecticut.  Staff Report.  Status UpdateApproved 01/05/12. 

PETITION NO. 1017 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at Mount Sinai Hospital, 500 Blue Hills Avenue, Hartford, Connecticut.  Staff Report.  Status UpdateApproved 01/05/12. 

PETITION NO. 1018 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the East Shore Substation located at 1 Waterfront Street, New Haven, Connecticut.  Staff Report.  Approved 01/05/12. 

PETITION NO. 1019 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed antenna installation on an existing smokestack and associated ground equipment located at 1-3 Oakland Avenue, East Hartford, Connecticut. Staff Report.  Approved 01/05/12. 


PETITION NO. 1020 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 12 Burr Road, Bloomfield, Connecticut.  Staff Report.  Approved 01/19/12. 
 
PETITION NO. 1021 - American Tower Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace and expand an existing telecommunications facility located at 10 Tanner Marsh Road, Guilford, Connecticut.  Staff Report.  Approved 02/16/12.
 
PETITION NO. 1022 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a wireless telecommunications facility on an existing Connecticut Light and Power transmission structure located at 227 Whitewood Road, Waterbury, Connecticut.  Withdrawn 04/09/12.
 
PETITION NO. 1023 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at CT Transit Bus Maintenance Facility, 100 Leibert Road, Hartford, Connecticut.  Staff Report.  Status Update. Approved 02/16/12. 
 
PETITION NO. 1024 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Pequonnock Substation located at 10 Henry Street, Bridgeport, Connecticut.  Staff Report.  Approved 03/29/12.
 
PETITION NO. 1025  - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Shepaug Substation located at 2225 River Road, Southbury, Connecticut.  Staff Report.  Approved 03/29/12. 
 
PETITION NO. 1026 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing telecommunications tower located at 400 Sheldon Street, Hartford, Connecticut. Staff Report.  Approved 03/29/12.
 
PETITION NO. 1027 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing tower located at 330 Porkony Road, Haddam, Connecticut.  Staff Report. Approved 05/10/12.   

PETITION NO. 1028 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Substation located at 81 Riverside Drive, East Hartford, Connecticut. Staff Report. Approved 06/21/12.
 
PETITION NO. 1029 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing CL&P switching station located at 108 Carpenter Lane, Wallingford, Connecticut.  Staff Report.  Approved 08/09/12. 

PETITION NO. 1030 – UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell to be located at Western Connecticut State University, 181 White Street, Danbury, Connecticut. Staff Report.   Status Update. Approved 08/09/12.
 
PETITION NO. 1031 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the North Haven Substation located at 485 Washington Avenue, North Haven, Connecticut. Staff Report. Approved 07/26/12. 
 
PETITION NO. 1032 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to CL&P’s existing Norwalk Substation located at 50 New Canaan Avenue, Norwalk, Connecticut.  Staff Report.  Approved 08/09/12.
 
PETITION NO. 1033 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal of a 115-kV transmission line steel lattice structure located at Washington Boulevard and Station Place, Stamford, Connecticut.  Staff Report.  Approved 09/06/12.
 
PETITION NO. 1034The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing 115-kV transmission line in Ledyard, Connecticut.  Staff Report.  Approved 09/06/12.
 
PETITION NO. 1035The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to CL&P’s existing Montville Substation located at 81 Lathrop Road, Montville, Connecticut. Staff Report. Updated Staff ReportApproved 09/06/12. 
 
PETITION NO. 1036 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for an eleven foot extension of an existing telecommunications facility located a 39 Maennerchor Avenue, Norwich, Connecticut.  Staff Report.  Approved 10/04/12. 
 
PETITION NO. 1037 – The Connecticut Light and Power Company Petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing self-supporting lattice tower located at 315 Belleview Avenue, Southington, Connecticut.  Staff Report.  Approved 10/04/12. 
 
PETITION NO. 1038 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed antenna installation on an existing lattice tower located at 22 Wintonbury Road (a/k/a 91 Mountain Road), Simsbury, Connecticut.  Staff Report.  Approved 12/13/12. 
 
PETITION NO. 1039 - MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed antenna installation and 10-foot increase in height on an existing roof guy tower located at 14-20 Isham Road, West Hartford, Connecticut. Staff Report.  Approved 11/15/12.
 
PETITION NO. 1040 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the  South Meadow Substation located at Reserve Road, Hartford, Connecticut.  Staff Report.  Approved 11/15/12. 
 
PETITION NO. 1041HWClean Harbors of Connecticut, Inc. petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required for the ten-day hazardous waste transfer facility operations consistent with its renewal of the RCRA Part B permit located at 51 Broderick Road, Bristol, Connecticut.  Staff Report.  Approved 11/29/12.
 
PETITION NO. 1042 - Somers Solar Center, LLC Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction and operation of a 5.0 MW AC Solar Photovoltaic Project located at 458 & 488 South Road, Somers, Connecticut. (Record), (Findings of Fact), (Opinion), (Decision and Order)(Correction to Decision and Order)   Approved 03/21/13. 

PETITION NO. 1043 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a wireless telecommunications facility on an existing Connecticut Light and Power Company-owned transmission structure located at 525 Overland Drive, Orange, Connecticut. Staff Report. Approved 12/27/12.

PETITION NO. 1044MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a wireless telecommunications facility on an existing Connecticut Light and Power Company transmission structure located at 250 Olcott Street, Manchester, Connecticut. Staff Report. Approved 01/10/13.
 
PETITION NO. 1045 – BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 250 kW Fuel Cell to be located at Sam’s Club, 3465 Berlin Turnpike, Newington, Connecticut. Staff Report.  Status Update - Not Constructed. Approved 01/10/13. 
 
PETITION NO. 1046 – BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 500 kW Fuel Cell to be located at Walmart, 155 Waterford Parkway North, Waterford, Connecticut.  Staff Report.   Status Update -Constructed. Approved 01/10/13.  
 
PETITION NO. 1047 - BE 2012 A LLC 2012 ESA Project Company, LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 600 kW Fuel Cell to be located at AT&T, 751 Higgins Road, Cheshire, Connecticut.  Staff Report.  Status Update - Constructed Approved 01/24/13. 
 
PETITION NO. 1048 - BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 250 kW Fuel Cell to be located at Sam’s Club, 69 Pavilions Drive, Manchester, Connecticut. Staff Report.  Status Update - Superseded PE1208 Withdrawal Letter  Approved 01/10/13. 
 
PETITION NO. 1049 - BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 250 kW Fuel Cell to be located at Walmart, 495 Flatbush Avenue, Hartford, Connecticut.  Staff Report. Status Update - Not Constructed  Approved 01/10/13. 
 
PETITION NO. 1050 - BE 2012 A LLC 2012 ESA Project Company, LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 700 kW Fuel Cell to be located at AT&T, 522 Fairfield Avenue, Bridgeport, Connecticut.  Staff Report.  Status Update - Constructed  Approved 01/24/13. 
 
PETITION NO. 1051 - BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell to be located at Walmart, 315 Foxon Boulevard, New Haven, Connecticut.  Staff Report.  Status Update - Constructed  Approved 01/10/13. 
 
PETITION NO. 1052 - BE 2012 W LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 200 kW Fuel Cell to be located at Walmart, 3164 Berlin Turnpike, Newington, Connecticut.   Staff Report.  Status Update - Not Constructed  Approved 01/10/13. 
 
PETITION NO. 1053 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the removal of an existing 30-foot wood pole and replace it with a new 84-foot steel monopole and associated radio communications equipment located at 163 Lakeview Avenue, New Canaan, Connecticut.  Staff Report.  Approved 01/24/13. 
 
PETITION NO. 1054 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an 84-foot steel pole and associated radio communications equipment located at CL&P’s substation  on Prospect Street, Ridgefield, Connecticut.  Staff Report.  Approved 01/10/13. 
 

PETITION NO. 1055  - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications facility at an existing 300-foot guyed tower located at 855 University Drive (UCONN), Torrington, Connecticut.  Staff Report.  Approved 01/24/13. 

PETITION NO. 1056 - GRE 314 East Lyme, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 5.0 MW Solar Photovoltaic Renewable Energy Generating Project located on Grassy Hill Road and Walnut Hill Road, East Lyme, Connecticut.  (Record)(Findings of Fact)  (Opinion)  (Decison and Order)  (Decison Package)  Approved 5/16/13.

PETITION NO. 1057 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Northeast Simsbury Substation and replacement of structures in Simsbury and Bloomfield; and re-conductoring of a 115-kV transmission line from Northeast Simsbury Substation (Simsbury, Connecticut) to the North Bloomfield Substation, Bloomfield, Connecticut.  Staff Report.  Approved 02/07/13. 

PETITION NO. 1058 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed 1990 line structure replacement project consisting of modifications of two sections of an existing 115-kV transmission line from Stevenson Substation to Frost Bridge Substation and from Baldwin Junction to Baldwin Substation traversing the municipalities of Monroe, Oxford, Middlebury, Waterbury and Watertown, Connecticut. Staff Report.  Final Report. D&M Change - Lighting D&M Change-Lighting Decision Approved 6/13/13.

PETITION NO. 1059HW – Tradebe Treatment and Recycling Northeast, LLC petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required for the proposed changes consistent with its renewal of the RCRA Part B permit to the existing hazardous waste facility located at 136 Gracey Avenue, Meriden, Connecticut.  Staff Report.   Approved 5/16/13.

PETITION NO. 1060 – Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 600 kW Fuel Cell to be located at the Macy’s Distribution Center, 475 Knotter Drive, Cheshire, Connecticut.  Staff Report.   Approved 5/16/13.

PETITION NO. 1061The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of one monopole double-circuit 115-kV transmission line structure with two monopole single-circuit 115-kV transmission line structures near Washington Boulevard and Station Place, Stamford, Connecticut.  Staff Report.  Semi-Annual Status of Construction Report, 12/23/16 Semi-Annual Status of Construction Report, 07/03/2017  Approved 5/30/13.

PETITION NO. 1062 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary telecommunications facility on Price Avenue, Norwalk, Connecticut.  Staff Report.   Approved 5/30/13.  

PETITION NO. 1063 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a telecommunications facility at an existing Connecticut Light and Power Company transmission structure located at 298 Ridge Road, Orange, Connecticut.   Staff Report.  Approved 6/27/13. 

PETITION NO. 1064 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to CL&P’s Falls Village Substation located at Route 126, Canaan, Connecticut.  Staff Report. Approved 6/13/13. 

PETITION NO. 1065 - Crown Atlantic Company LLC petition for a declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required for the proposed relocation of the driveway at an existing telecommunications tower located at 49 Wig Hill Road, Chester, Connecticut.  Staff Report.  Approved 6/27/13.   

PETITION NO. 1066CTI Towers Assets I, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and extension of an existing telecommunications tower located at 10 Tanner Marsh Road, Guilford, Connecticut.  Staff Report.  Approved  7/11/13.  Contact Information   

PETITION NO. 1067The Hartford Steam Company petition for declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 1.4 MW Fuel Cell combined heat and power cogeneration facility at Hartford Hospital located at 19 Jefferson Street, Hartford, Connecticut.   Staff Report. Approved 7/25/13  Gas Pipe Cleaning Procedures dated 2/11/14.  Construction Complete/Operating.

PETITION NO. 1068 - BE 2012 A LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 400 kW Fuel Cell to be located at AT&T, 26 Washington Street, New London, Connecticut. Record,  Staff ReportStatus Update - Constructed  Approved 10/31/13.

PETITION NO. 1069BE 2012 A LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 300 kW Fuel Cell to be located at AT&T, 84 Deerfield Lane, Meriden, Connecticut.  Staff Report. Status Update - Constructed Approved 7/25/13.

PETITION NO. 1070 - BE 2012 A LLC 2013B ESA Project Company, LLC Frontier Communicationsdeclaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 400 kW Fuel Cell to be located at AT&T, 348 Grand Street, Waterbury, Connecticut.  Staff Report.  Status Update - Constructed Approved 7/25/13.

PETITION NO. 1071 - The Connecticut Municipal Electric Energy Cooperative (CMEEC) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation and operation of four (4) 2.49 MW electric generators and associated equipment located at 4 Matlack Road, Norwich, Connecticut.  Staff Report. Approved 08/08/13.  

PETITION NO. 1072Algonquin Gas Transmission, LLC Petition for a Declaratory Ruling Regarding the Jurisdiction of the Connecticut Siting Council over the construction or replacement of natural gas pipeline facilities in the towns of Danbury, Cromwell/Rocky Hill, Lebanon/Franklin/Norwich and Montville, Connecticut; modifications to compressor stations in the towns of Oxford, Cromwell and Chaplin Connecticut; modifications to metering stations in the towns of Berlin, Danbury, Farmington, Glastonbury, Guilford, Middletown, Montville, North Haven, Norwich, Plainville, Pomfret, Putnam, Southbury, Vernon and Windham, Connecticut; and for recommendations regarding siting, environmental mitigation measures, and construction procedures to the Federal Energy Regulatory Commission.   Decision Letter and Staff Report  Decision: 10/31/13.

PETITION NO. 1073 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required  for all transmission remediation activities pursuant to the North American Electric Reliability Corporation (NERC) facility ratings recommendation to industry.  Staff Report.   Approved 08/22/13. 

PETITION NO. 1074 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the collocation of a telecommunications facility on an approved tower site located at 208 Valley Road, New Canaan, Connecticut.  Staff Report.  Approved 08/22/13. 

PETITION NO. 1075 - Crown Atlantic Company LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed relocation of the driveway at an existing telecommunications tower located at 1684 Chamberlain Highway, Berlin, Connecticut.  Staff Report.  Approved 12/12/13.

PETITION NO. 1076 - ClearEdge Power Corporation Doosan Fuel Cell America, Inc. declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at CT Transit Bus Maintenance Facility, 2061 State Street, Hamden, Connecticut.  Staff Report.  Status UpdateApproved 01/23/14.
 

PETITION NO. 1077 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility at the Simsbury Volunteer Fire Department located at 345 Bushy Hill Road, Simsbury, Connecticut.  Staff Report.   Approved 12/12/13.

PETITION NO. 1078 - Town of South Windsor CTS Energy, LLC petition for  declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 4.98 5 megawatt fuel cell facility located at 515 John Fitch Boulevard 245 Chapel Road, South Windsor, Connecticut. Staff Report.  Request for Modification.  Certification of Mailing. Request for Extension.  Amendment InterrogatoriesResponses to Amendment Interrogatories. Council Amendment Decision and Staff Report  Approved 12/12/13.

PETITION NO. 1079 - Dominion Nuclear Connecticut, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an equipment storage building at the Millstone Power Station in Waterford, Connecticut.  Staff Report.  Approved 12/12/13.

PETITION NO. 1080 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing CL&P switching station located at 181 Cove Road, Haddam, Connecticut.  Staff Report.  Approved 01/23/14.

PETITION NO. 1081 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 75 North Frontage Road, East Haven, Connecticut.  Staff Report. Status Update - Constructed Approved 01/23/14.  

PETITION NO. 1082 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 541 Kings Highway Cut-Off, Fairfield, Connecticut.  Staff Report. Status Update - Constructed Approved 01/23/14. 

PETITION NO. 1083 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 136 Elm Street, Enfield, Connecticut.  Staff Report.  Revised Staff Report. Status Update - Constructed Approved 12/12/13.  Revised Approval 10/16/14.

PETITION NO. 1084 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 55 Granby Street, Bloomfield, Connecticut.  Staff Report. Status Update - Constructed  Approved 12/12/13.

PETITION NO. 1085 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 117 Main Street, Derby, Connecticut.  Staff Report. Status Update - Constructed Approved  01/23/14.

PETITION NO. 1086 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 656 Reservoir Avenue, Bridgeport, Connecticut.  Staff Report. Status Update - Constructed  Approved 01/23/14. 

PETITION NO. 1087 - Wal-Mart Stores, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 250 kW Fuel Cell to be located at the Wal-Mart store, 625 School Street, Putnam, Connecticut.  Staff Report.  Status Update - Constructed Approved 01/23/14.

PETITION NO. 1088 - Wal-Mart Stores, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 250 kW Fuel Cell to be located at the Wal-Mart store, 161 Berlin Road, Cromwell, Connecticut.  Staff Report. Status Update - Constructed  Approved 12/12/13.

PETITION NO. 1089 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 50 Devine Street, North Haven, Connecticut.  Staff Report.  Approved 01/23/14.

PETITION NO. 1090 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 750 kW Fuel Cell to be located at the Danbury Fair Mall, 7 Backus Avenue, Danbury, Connecticut.  Staff Report.  Status Update - Constructed Approved 01/23/14.

PETITION NO. 1091 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 80 Buckland Hills Drive, Manchester, Connecticut.  Staff Report. Status Update - Constructed  Approved 01/23/14.

PETITION NO. 1092 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 134R Creamery Road, Durham, Connecticut. Staff Report.  Approved 03/06/14. 

PETITION NO. 1093Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 400 kW Fuel Cell to be located at Comcast, 222 New Park Drive, Berlin, Connecticut.  Staff Report.  Status Update - Constructed Approved 02/20/14. 

PETITION NO. 1094 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed upgrades to the Elmwest Substation located at 335 Elm Street, West Haven, Connecticut. Staff Report.  Completion Letter. Approved 04/03/14. 

PETITION NO. 1095 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a telecommunications facility on the Hebron Fairgrounds parcel located at 347 Gilead Street, Hebron, Connecticut.  Staff Report. Approved 05/01/14. 

PETITION NO. 1096 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no amended Certificate of Environmental Compatibility and Public Need is required for a proposed rooftop wireless telecommunications facility on an existing building located at 1270 North High Street, East Haven, Connecticut. Staff Report.  Approved 04/15/14. 

PETITION NO. 1097 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that an amended Certificate of Environmental Compatibility and Public Need is not required to co-locate on and extend an existing wireless telecommunications facility located at 174 South Grand Street, Suffield, Connecticut.  Staff Report.  Revised Staff Report.  Approved 05/15/14.  

PETITION NO. 1098 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed upgrades to the Sackett Substation located at 453 State Street, North Haven, Connecticut.   Staff Report.  Completion Letter  Approved 05/15/14. 

PETITION NO. 1099 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing silo with a telecommunications facility designed as a silo located at 743 Murdock Avenue, Meriden, Connecticut.  Filing.  Staff Report. Approved 06/12/14. 

PETITION NO. 1100 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 23 Stonybrook Road, Stratford, Connecticut. Filing.  Staff Report. Approved 07/07/14. 

PETITION NO. 1101 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a stealth rooftop telecommunications tower on the roof of the existing building located at 79 Park Avenue, Danbury, Connecticut. Record.  Findings of Fact.  Opinion.  Decision and Order.  Approved 10/02/14. 

PETITION NO. 1102 - Cellco Partnership d/b/a Verizon Wireless and New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a temporary ballast tower and associated equipment on property located at the American School for the Deaf, 139 North Main Street, West Hartford, Connecticut. Filing,  Staff ReportCompletion Letter 09/29/15. Approved 05/29/14.

PETITION NO. 1103 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a telecommunications facility at an existing Connecticut Light and Power Company transmission structure located at 227 Whitewood Road, Waterbury, Connecticut. Filing, Staff Report. Status Update. Approved 06/12/14.

PETITION NO. 1104 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 2.2 MW AC solar photovoltaic facility and a 2.8 MW AC Fuel Cell facility on approximately 22 acres of the former Seaside Landfill located at 350 Waldemere Avenue, Bridgeport, Connecticut.  Record,   Findings of Fact, OpinionDissenting Opinion,  Decision and Order.  Approved 11/13/14.

PETITION NO. 1105PSEG Power Connecticut LLC petition for declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the Bridgeport Harbor Unit No. 3 Dry Sorbent Injection Project located at 1 Atlantic Street, Bridgeport, Connecticut. Filing.  Staff Report.   Approved 07/07/14.

PETITION NO. 1106 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a rooftop telecommunications tower on an existing commercial building located at 168 Center Street, Southington, Connecticut. Filing.  Staff Report.  Approved 10/16/14. Revision Request.   Revision Decision LetterStatus Update.

PETITION NO. 1107 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a rooftop telecommunications tower located at 58 Robinson Boulevard, Orange, Connecticut. Filing.  Staff Report.  Approved 07/07/14.

PETITION NO. 1108 – American Tower Corporation and New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the expansion of an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Filing.  Decision Letter and Staff Report   Request for Modification  Modification Request Decision Letter Status Extension Request   Council Extension Request Approval   Request for Minor Modification  CSC Decision on Modification Request Approved 08/21/14.

PETITION NO. 1109UB Fuel Cell, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction and operation of a 1.4 MW Fuel Cell facility to be located at the University of Bridgeport located at 446 University Avenue, Bridgeport, Connecticut. Filing.  Staff Report.  Status Update Letter and Acknowledgement. Approved 08/21/14.

PETITION NO. 1110 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Milford 115-kV transmission line upgrade project consisting of the northern and southern sections of 115-kV lines.  Record, FilingStaff Report.  Approved 08/21/14. 

PETITION NO. 1111 - Murdock Avenue Neighborhood Association Petition for a declaratory ruling to reconsider the Connecticut Siting Council’s ruling on Petition No. 1099 submitted by New Cingular Wireless PCS, LLC that a Certificate of Environmental Compatibility and Public Need is not required to replace an existing silo with a telecommunications facility designed as a silo located at 743 Murdock Avenue, Meriden, Connecticut. WITHDRAWN

PETITION NO. 1112 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and extension of an existing telecommunications facility located off of St. Andrews Road, Bloomfield, Connecticut. Filing. Staff Report.  D&M Revision Approval. Second D&M Revision Approval. Compliance Monitoring Report. Completion Letter Compliance Monitoring Report 12/09/16 Compliance Monitoring Report 08/31/17 Approved 09/04/14.

PETITION NO. 1113 - The United Illuminating Company (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation and maintenance of a 2.8 MW AC fuel cell facility to be located at an approximately .25 acre UI Tax Parcel (Map 67, Block 951, Lot 13) adjacent to Connecticut Avenue, Interstate 95 and Alabama Street in New Haven, Connecticut. Filing - Part 1.  Filing - Part 2.  Staff Report.  Approved 09/04/14.

PETITION NO. 1114 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed extension of an existing telecommunications facility located at 201 Granite Road, Guilford, Connecticut. Filing.  Staff Report.  Completion Letter. Approved 10/02/14. 

PETITION NO. 1115 – Bloom Energy Corporation, as agent for International Business Machines Corporation (IBM), petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 1-megawatt Fuel Cell to be located at the IBM facility, 150 Kettletown Road, Southbury, Connecticut. Filing.  Staff Report.  Status Update - Constructed Approved 10/02/14.

PETITION NO. 1116 – The Connecticut Light and Power Company (“CL&P”) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to CL&P’s existing Canal Substation located at 168 Canal Street, Southington, Connecticut. Filing. Staff Report.  Semi-Annual Status of Construction Report, 12/23/16 Semi-Annual Status of Construction Report, 07/03/2017  Approved 09/18/14.

PETITION NO. 1117 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a small cell telecommunications facility on the approximately 30-acre Durham Fairgrounds parcel located at 24 Townhouse Road, Durham, Connecticut. Filing.  Staff Report. Completion LetterApproved 10/16/14.

PETITION NO. 1118 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a proposed rooftop telecommunications facility on an existing building located at 1 Selleck Street, Norwalk, Connecticut.  WITHDRAWN

PETITION NO. 1119 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of three pole-mounted small cell telecommunications facilities on the Woodstock Fairgrounds property located at 281 Route 169, Woodstock, Connecticut. Filing.  Staff Report.  Completion Letter.  Modification Request. Modification Decision.   Approved 12/11/14.

PETITION NO. 1120 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Hawthorne Substation located at 180 Hawthorne Drive, Fairfield, Connecticut. Record,  Findings of FactOpinionDecision and Order.   Approved 06/25/15.

PETITION NO. 1121 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of and modifications to an existing telecommunications facility located at 353 Pumpkin Hill Road, Ashford, Connecticut. Filing.  Staff Report.  Decision Condition Satisfied. Minor Modification Request.  Decision on Modification. Final Summary Report. Interim Summary Report.  Completion Letter. Wetland Mitigation  Final Summary Report  Approved 01/08/15.

PETITION NO. 1122 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on an existing Connecticut Light and Power Company transmission structure located at 200 Edgemark Acres, Meriden, Connecticut.  Filing.  Staff Report. Status Update. Approved 01/08/15.

PETITION NO. 1123 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a proposed rooftop telecommunications facility on an existing building located at 489 Sullivan Avenue, South Windsor, Connecticut.  Filing.  Staff Report.  Completion Letter. Approved 01/08/15.

PETITION NO. 1124 – T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 191 Middle Haddam Road, Portland, Connecticut. Filing.  Staff Report.  Completion Letter. Approved 01/08/15.

PETITION NO. 1125 – T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility at an existing Connecticut Light and Power Company transmission structure located off of Rood Road, Windsor, Connecticut.  Filing.  Staff Report.  Completion Letter. Approved 01/22/15.

PETITION NO. 1126 – T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility at an existing Connecticut Light and Power Company transmission structure located at 4280 Whitney Avenue, Hamden, Connecticut. Filing.  Staff Report.  Completion Letter. Approved 01/22/15.

PETITION NO. 1127 – Cellco Partnership D/B/A Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell stub tower on the roof of an existing office and activities building located at The Aces High RV Park and Campground located at 301 Chesterfield Road, East Lyme, Connecticut. Filing.  Staff Report. Completion Letter. Approved 01/22/15.

PETITION NO. 1128 - Cellco Partnership D/B/A Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing mixed use building located at 790 Main Street, Willimantic (Windham), ConnecticutFiling.  Staff Report. Completion Letter.  Approved 01/22/15.

PETITION NO. 1129 - T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 100 Berlin Road (aka Christian Hill Road), Cromwell, Connecticut. Filing.  Staff Report. Completion Letter. Approved 01/22/15.

PETITION NO. 1130 - Department of Emergency Services and Public Protection petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing telecommunications facility located at 194 Mount Parnassus Road, East Haddam, Connecticut.  Filing.  Staff Report. Final Structural Design Drawings for Foundation.  Final Drawings for Tower.  Completion Notice. Approved 02/19/15.

PETITION NO. 1131 - Cellco Partnership D/B/A Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a new back-up power generator and associated equipment at an existing telecommunications facility located at 80 Lonetown Road, Redding, Connecticut.  Filing.  Staff Report. Completion Letter. Approved 02/19/15.

PETITION NO. 1132 - Cellco Partnership D/B/A Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the Killingly Town Hall building located at 172 Main Street, Killingly, Connecticut.  Filing.  Staff Report. Completion Letter. Approved 02/19/15.

PETITION NO. 1133 – Connecticut Siting Council petition for a declaratory ruling pursuant to Conn. Gen. Stat. §4-176 that Conn. Gen. Stat. §16-50k does not apply to Eligible Facilities Requests for existing telecommunications facilities submitted under the Federal Communications Commission (FCC) rules adopted pursuant to the October 21, 2014 FCC Wireless Infrastructure Report and Order. Comments from CTIA Comments from Verizon. Comments from T-Mobile. Comments from AT&TDecision Memorandum and Filing InstructionsApproved 03/05/15.

PETITION NO. 1134 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on an existing Connecticut Light and Power Company transmission structure located off of Rivergate Drive, Wilton, Connecticut.  Decision Letter and Staff ReportStatus Update.  Approved 03/05/15.

PETITION NO. 1135 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and expansion of an existing light pole for the installation of telecommunications antennas and associated equipment at Penders Field, Longbrook Park, located at Glendale Road, Stratford, Connecticut. Date for Decision. Withdrawal Letter and CSC Acknowledgement.  Withdrawn 06/11/15.

 
PETITION NO. 1136 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing Econo Lodge Motel building located at 1843 Meriden-Waterbury Turnpike, Southington, Connecticut.  Decision Letter and Staff Report.  Decision Letter and Staff ReportCompletion LetterApproved 03/05/15.
 

PETITION NO. 1137 Windham Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of five 1.0 MW and one 1.1 MW Solar Photovoltaic Renewable Energy Generating facilities located at 1 Williams Crossing Road, Lebanon, Connecticut. Site Phasing Plan.  Decision Letter and Staff ReportAmendment  Town Letters  Field Review Town of Franklin Planning and Zoning Commission Comments Council Decision and Staff Report on Amendment Approved 03/05/15.


PETITION NO. 1138
– The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and relocation of the existing 115-kV transmission lines crossing the Housatonic River located in Stratford and Milford, Connecticut and related switching station improvements. Motion for Protective Order. Council's Decision on Motion for Protective Order Notice of Correction. Decision Letter and Staff Report. Approved 04/02/15.

 

PETITION NO. 1139 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing building located at 3 Arnoldale Road, West Hartford, Connecticut. Updated Abutters List.  Decision Letter and Staff Report. Completion Letter. Approved 04/02/15.


PETITION NO. 1140 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed reconductoring of a portion of an existing 115-kV transmission line extending from Barbour Hill Substation in South Windsor to Manchester Substation in Manchester, Connecticut and modifications to Barbour Hill Substation and Manchester Substation. Filing Part 1 of 3. Filing Part 2 of 3. Filing Part 3 of 3.  Decision Letter and Staff ReportLandscaping PlanReplacement of StructureConstruction Hours ExtensionIn Service Letter.  Modified Landscaping Plan. Semi-Annual Status of Construction Report, 12/23/16Revised Report 1/5/2017 Amendment for Installation of Sound Walls   Sound Wall Interrogatories   Responses to Interrogatories  CSC Decision on Amendment Sunday Hours Approved 04/16/15.

PETITION NO. 1141 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing office building located at 200 Executive Boulevard, Southington, Connecticut.  Decision Letter and Staff Report.   Completion LetterApproved 04/02/15.


PETITION NO. 1142 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 2 Ocean Avenue, West Haven, Connecticut.  Decision Letter and Staff Report. Remote Radio Head Change 07/10/15. Completion Letter Approved 04/02/15.

PETITION NO. 1143 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing Harvest Bakery building located at 84 Farmington Avenue, Bristol, Connecticut.  Decision Letter and Staff Report. Completion Letter. Approved 04/02/15.

PETITION NO. 1144 – Bloom Energy Corporation, as an agent for Home Depot USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 104 Danbury Road, New Milford, Connecticut. Decision Letter and Staff Report. Request for RevisionRevision DecisionApproved 04/16/15.

PETITION NO. 1145 – Bloom Energy Corporation, as an agent for Home Depot USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 816 Hartford Turnpike, Waterford, Connecticut. Decision Letter and Staff Report.Status Update - Constructed  Approved 04/16/15.

PETITION NO. 1146 Bloom Energy Corporation, as an agent for Home Depot USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 1580 Litchfield Turnpike, New Hartford, Connecticut.

Revised Abutters List. Revised Abutter's Notification.  Decision Letter and Staff ReportAmendment Submission.  Decision on AmendmentStatus Update - Constructed Approved 04/30/15.

PETITION NO. 1147 Bloom Energy Corporation, as an agent for Home Depot USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 1932 Norwich-New London Turnpike, Montville, Connecticut.

Revised Abutters List.  Decision Letter and Staff ReportStatus Update - Constructed Approved 04/30/15.

PETITION NO. 1148 Bloom Energy Corporation, as an agent for Home Depot USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 600 Connecticut Avenue, Norwalk, Connecticut. Incomplete Notice.

Revised Abutters List. Site Plan. Home Depot Fuel Cell Sound Study.    Decision Letter and Staff Report. Status Update - Constructed Approved 05/14/15.

PETITION NO. 1138 The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and relocation of the existing 115-kV transmission lines crossing the Housatonic River located in Stratford and Milford, Connecticut and related switching station improvements. Motion for Protective Order. Council's Decision on Motion for Protective Order Notice of Correction. Decision Letter and Staff ReportApproved 04/02/15.


PETITION NO. 1149 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 109 Federal Road, Danbury, Connecticut. Decision Letter and Staff ReportCompletion Letter. Approval of Minor Project ChangeApproved 04/16/15.

PETITION NO. 1150SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 3.1 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located on Brush Hill Road in Bozrah, Connecticut. RecordDecision Letter and Staff Report Approved 06/11/15.

 
PETITION NO. 1151The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal and replacement of the existing 115-kV transmission line structures in the Connecticut Department of Transportation right-of-way outside of Milvon substation located at 772 Bridgeport Avenue, Milford, Connecticut. (RecordDecision Letter and Staff Report. Approved 05/28/15.
  
PETITION NO. 1152 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary telecommunications facility located at East Lyme Tax Assessor Map 30, Lot 1, Ancient Highway, East Lyme, Connecticut.  RecordWithdrawal without Prejudice 06/08/15  CSC Acknowledgement of Withdrawal.  Withdrawn 06/08/15.
 

PETITION NO. 1153 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Sandy Hook Substation and associated transmission lines located at 13 Farmery Road, Newtown, Connecticut. Abutters List & Map. Date of Decision Letter.  Decision Letter and Staff Report. Completion Letter. Approved 06/25/15.

 
PETITION NO. 1154 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Haddam Substation and associated 345-kV and 115-kV transmission lines located at 1384 Saybrook Road, Haddam, Connecticut. Request for Status. Status ApprovalDecision Letter and Staff Report. Landscaping Plan & Retaining Wall Details.  Request for Amendment to Petition 11/04/15Revision Decision. Temporary Hours Revision and Decision.  Semi-Annual Status of Construction Report, 12/23/16  Temporary Hours Revision and Decision Completion Letter Semi-Annual Status of Construction Report, 07/03/2017 Approved 06/11/15
 
PETITION NO. 1155 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 19 Main Street, Old Saybrook, Connecticut. Decision Letter and Staff ReportModification. Modification Decision. Construction Complete. Approved 05/28/15.
 

PETITION NO. 1156 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing 120-foot tall telecommunications facility with a new 150-foot telecommunications facility located at property owned by Eversource Energy used as a service center and maintenance yard, 2 Tindall Avenue, Norwalk, Connecticut. Signed Abutter Letter. Norwalk Mailing List. Carrier Interest Memo. T-Mobile Response Letter to CSC. Verizon Interest LetterDecision Letter and Staff Report Final Structural Design DrawingsCompletion Letter. Approved 06/11/15.

PETITION NO. 1157 Eversource Energy and The United Illuminating Company joint petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission substation remediation activities to comply with the North American Electric Reliability Corporation (NERC) Reliability Standards for Critical Infrastructure Protection.  Decision Letter. Protective Order Decision LetterProtective OrderApproved 06/11/15.

 

PETITION NO. 1158 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 398 Somers Road, Ellington, Connecticut. Decision Letter and Staff Report. Approved 06/25/15Completion Letter.

PETITION NO. 1159 - Lodestar Energy LLC LSE Canis Major LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 2.0 MW AC Solar Photovoltaic Electric Generating facility located at 1005 North Street, Suffield, Connecticut. Approved 09/03/15

PETITION NO. 1161 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing residential apartment building located at 96 Clinic Drive, New Britain, Connecticut.  Decision Letter and Staff ReportCompletion Letter. Approved 07/10/15.

PETITION NO. 1162 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Hopewell Substation located at 1007 Chestnut Hill Road, Glastonbury, Connecticut.  Decision Letter and Staff ReportApproved 07/23/15.
 

PETITION NO. 1163 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 475-479 Howe Avenue (Route 110), Shelton, Connecticut. Decision Letter and Staff Report. Completion Letter. Approved 07/23/15.

PETITION NO. 1164 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing commercial building at Mystic Aquarium located at 55 Coogan Boulevard, Mystic (Stonington), Connecticut. Decision Letter and Staff Report. Completion Letter. Approved 07/23/15.

PETITION NO. 1165 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing mixed use building located at 37 Main Street, Jewett City (Griswold), Connecticut. Decision Letter and Staff Report. Construction Complete. Approved 07/23/15.

PETITION NO. 1166 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 1095 Kennedy Road, Windsor, Connecticut. Decision Letter and Staff ReportCompletion LetterApproved 08/06/15.

PETITION NO. 1167 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing industrial storage building located at 85-91 South Leonard Street, Waterbury, Connecticut.  Decision Letter and Staff Report.   Structural Evaluation Letter. Completion Letter. Approved 08/06/15.

PETITION NO. 1168 Algonquin Gas Transmission, LLC Petition for a Declaratory Ruling Regarding the Jurisdiction of the Connecticut Siting Council over the construction or replacement of natural gas pipeline facilities in the City of Danbury, Connecticut; modifications to compressor stations in the towns of Oxford and Chaplin, Connecticut; modifications to an existing metering station in the City of Danbury, Connecticut; construction of a new metering station in the city of Norwich, Connecticut, which will replace an existing metering station in Norwich, all as part of the Atlantic Bridge Project; and for recommendations regarding siting, environmental mitigation measures, and construction procedures to the Federal Energy Regulatory Commission. Field Review Handout.  Decision LetterApproved 09/03/15.


PETITION NO. 1169 Blue Sky Towers, LLC and New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary telecommunications facility to be located at 220 Evergreen Street, Bridgeport, Connecticut. Interrogatories to Petitioner Set 1.  Response to Set 1 InterrogatoriesDepartment of Transportation Comments.  Decision Letter and Staff ReportApproved 08/06/15.

PETITION NO. 1170 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on top of an existing abandoned utility pole adjacent to an existing industrial building located at 330 Newington Road, West Hartford, Connecticut. Decision Letter and Staff ReportApproved 09/03/15.

 

PETITION NO. 1171 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing South Windsor Public Library building located at 1550 Sullivan Avenue, South Windsor, Connecticut. Decision Letter and Staff ReportCompletion Letter. Approved 09/03/15.

PETITION NO. 1172 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 934 Boston Post Road, Guilford, Connecticut. Letter from First Selectman with Response.  Decision Letter and Staff ReportApproved 09/03/15.

PETITION NO. 1173 Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of two 400-kilowatt Customer-Side Fuel Cells to be located at Amgraph Packaging, Inc., 90 Inland Road, Sprague, Connecticut.  Incomplete LetterCorrected Filing.  Second Corrected Filing.  Decision Letter and Staff ReportStatus UpdateApproved 09/03/15.

PETITION NO. 1174 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at Lake Compounce Amusement Park, off Mount Vernon Road, Southington, Connecticut.    Decision Letter and Staff Report.   Completion LetterApproved 09/03/15.

PETITION NO. 1175 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at Bear Creek Campground at Lake Compounce Amusement Park, off Mount Vernon Road, Southington, Connecticut.   Decision Letter and Staff ReportCompletion LetterApproved 09/03/15.

PETITION NO. 1176 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Bridgeport 115-kV transmission line upgrade project consisting of the northern and southern sections of 115-kV lines extending from Congress Substation in the City of Bridgeport to Baird Substation in the Town of Stratford, Connecticut, and related substation improvements. Decision and Staff ReportApproved 09/17/15.

PETITION NO. 1177Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 67 Newtown Road, Danbury, Connecticut. Decision Letter and Staff Report  Acknowledgement Equipment Letter Completion Letter Approved 09/17/15.

PETITION NO. 1178 – Fusion Solar Center, LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation and maintenance of a ground-mounted 20 megawatt solar photovoltaic electric generating facility located on Potash Hill Road, Sprague, Connecticut. Record.  Decision Letter and Staff Report. Approved 09/17/15.

PETITION NO. 1179 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing commercial building located at 137 South Main Street, West Hartford, Connecticut. Decision Letter and Staff Report. Approved 09/17/15.

PETITION NO. 1180 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing building at Holy Family Monastery Retreat House & Center located at 303 Middle Road, Farmington, Connecticut. Decision Letter and Staff ReportApproved 10/01/15.

 

PETITION NO. 1181 - SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 4.93 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located at 9 Stott Avenue & 292 Plain Hill Road, Norwich, Connecticut. Record. Decision Letter and Staff Report.   Approved 11/12/15.

PETITION NO. 1182 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing building at Farm Car Care Center Inc. located at 11 Windermere Avenue, Vernon, Connecticut.  Revised Plan Sheet C-2Decision Letter and Staff ReportCompletion Letter. Approved 10/01/15.

PETITION NO. 1183 - Wallingford Energy II, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of two natural gas fired 50 megawatt peaking units and associated equipment at an existing electric generating facility located at 115 John Street, Wallingford, Connecticut.  Approved 11/12/15.
 

PETITION NO. 1184 - Beacon Falls Energy Park, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 63.3 Megawatt AC fuel cell facility located on Lopus Road, Beacon Falls, Connecticut. Record,  Findings of Fact, Opinion, Decision and OrderApproved 01/07/16.

PETITION NO. 1185 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing Sanctuary of Faith and Glory Church located at 752 Bloomfield Avenue, Windsor, Connecticut. Date for DecisionDecision Letter and Staff ReportApproved 11/12/15.

PETITION NO. 1186 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed partial decommissioning of 0.5 miles of existing 115-kV transmission line and modifications to its existing 115-kV transmission line and related substation improvements located at 181 Cove Road, Haddam, Connecticut. Date for DecisionRevised Drawings.  Decision Letter and Staff ReportCompletion Letter. Approved 11/12/15.

PETITION NO. 1187 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing Griswold High School located at 303 Slater Avenue, Griswold, Connecticut. Date for DecisionDecision Letter and Staff ReportCompletion LetterApproved 11/12/15.

PETITION NO. 1188 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 1081 Huntington Road, Stratford, Connecticut. Date for DecisionFCC Compliance.  Discussion of Safety Criteria.  Response to CSC.  Decision Letter and Staff ReportCompletion Letter  Approved 11/12/15.

PETITION NO. 1189 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Mix Avenue Substation located at 690 Mix Avenue, Hamden, Connecticut and related improvements to existing electric transmission line circuits from Mix Avenue Substation to Glen Lake Junction and from June Street Substation to Pease Road. Interrogatories to Petitioner Set 1. Responses. CSC Response 2 Attachment. Date for Decision. Decision Letter and Staff Report. Revised Drawings Completion Letter Outstanding Condition Letter  Landscaping Plan & Stormwater Pollution Control Plan Part 1    Part 2 Approved 11/12/15.

PETITION NO. 1190 – Bloom Energy Corporation, as an agent for Hyatt Hotels Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 500-Kilowatt Fuel Cell to be located at the Hyatt Hotel building at 1800 East Putnam Avenue, Greenwich, Connecticut. Department of Transportation Comments   Interrogatories to Petitioner Set 1  Responses to Interrogatories.  Date for DecisionDecision Letter and Staff ReportStatus Update - Constructed Approved 11/12/15.
 

PETITION NO. 1191 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing industrial building located at 8 Custom Drive, Old Saybrook, Connecticut.  Decision Letter and Staff Report.   Completion Letter Approved 11/12/15.

PETITION NO. 1192 - SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 2.74 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located at two City of Norwich-owned parcels on Rogers Road, Norwich, Connecticut. Record Staff Report and Decision Letter.   Approved 11/12/15.


PETITION NO. 1193 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility at Lime Rock Park, 497 Lime Rock Road, Lakeville, Connecticut.  Staff Report and Decision LetterApproved 11/12/15.

PETITION NO. 1194 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing abandoned grain elevator structure at 140 Route 32, Franklin, Connecticut. Staff Report and Decision Letter. Completion Letter. Approved 11/12/15.

PETITION NO. 1195 - SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 4.05 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located on municipally-owned property at 1240 Poquonnock Road, Groton, Connecticut. RecordStaff Report and Decision Letter. Approved 1/7/16.

PETITION NO. 1196 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell unipole telecommunications facility on the roof of the existing Veterans Memorial Ice Arena located at 56 Buena Vista Road, West Hartford, Connecticut. Staff Report and Decision LetterApproved 12/10/15.

PETITION NO. 1197 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing commercial building at 1 Anngina Drive, Enfield, Connecticut.  Staff Report and Decision LetterNotification - Will Not Complete  Approved 12/10/15.

PETITION NO. 1198 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing building located at 1663 South Main Street, Waterbury, Connecticut.  Staff Report and Decision LetterApproved 12/10/15.

PETITION NO. 1199 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a 2.8 Megawatt AC Fuel Cell to be located at Amity Regional High School, 25 Newton Road, Woodbridge, Connecticut. Abutters MapUI Responses to Roscaso Questions. Date for DecisionUI Supplemental Filing. Dept. of Transportation CommentsStaff Report and Decision LetterNotice of Pipe Cleaning and Procedures Completion Letter Letter Regarding Pressure Valve Approved 01/07/16.

PETITION NO. 1200 2015 ESA Project Company, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of an 800 Kilowatt Fuel Cell Facility to be located at Parkville Community Elementary School, 1755 Park Street, Hartford, Connecticut. Comments from the City of Hartford Department of Public WorksAdditional Comments from the City of Hartford Department of Public Works. Date for DecisionDept. of Transportation Comments. Staff Report and Decision Letter.  Approved 01/07/16.

PETITION NO. 1201 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed reconductoring of approximately 1.75 miles of its existing No. 1810 115-kV transmission line from Forestville Junction in Southington to Lake Avenue Junction in Bristol, rebuilding and reconductoring of approximately 1.85 miles of its existing Nos. 1800 and 1810 115-kV transmission lines from Southington Substation in Southington to Structure No. 1815 in Southington, reinforcement of an existing transmission structure at Southington Substation in Southington, and related substation and transmission line structure improvements. Semi-annual Status of Construction Report, 07/03/17 Approved 01/21/16.

PETITION NO. 1202FuelCell Energy, Inc. petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 1.4 MW fuel cell combined heat and power electric generating facility located at Pepperidge Farm, Inc., 1414 Blue Hills Avenue, Bloomfield, Connecticut. Comments from the Drinking Water Section of the Department of Public Health. Date for DecisionSHPO Response. Staff Report and Decision Letter. Construction Commencement LetterPipe Cleaning Procedures.  Completion Letter. Approved 01/21/16.

PETITON NO. 1203 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a proposed rooftop wireless telecommunications facility on an existing barn located at 212 Deans Mill Road, Stonington, Connecticut. Staff Report and Decision LetterCompletion Letter. Approved 01/21/16.

PETITION NO. 1204 - Bloom Energy Corporation, as an agent for Legrand, S.A., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 500-Kilowatt Fuel Cell Facility to be located at Legrand Wiremold, 60 Woodlawn Street, West Hartford, Connecticut.  Incomplete LetterResponse to Incomplete LetterInterrogatoriesResponse to Interrogatories. Date of Decision LetterRequest for Sound StudySound Study Report. Staff Report and Decision LetterStatus Update - Constructed Approved 02/18/16.

PETITION NO. 1205 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at the Bristol Shopping Center, 597 Farmington Avenue, Bristol, Connecticut. Withdrawn.

PETITION NO. 1206 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing commercial building located at the Old Saybrook Shopping Center, 665 Boston Post Road, Old Saybrook, Connecticut. Staff Report and Decision Letter. Approved 01/21/16.

PETITION NO. 1207 - Bloom Energy Corporation, as an agent for Wal-mart Stores, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at Walmart, 450 Providence Road, Brooklyn, Connecticut.  Incomplete LetterSecond Incomplete LetterAbutter's OverviewInterrogatoriesDPH Comments. Corrected Proof of Notice. Response to Interrogatories.   Staff Report and Decision Letter. Fire Prevention & Emergency Planning. Approved 02/18/16.

PETITION NO. 1208  - Bloom Energy Corporation, as an agent for Wal-mart Stores, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Sam’s Club store, 69 Pavillions Drive, Manchester, Connecticut. Incomplete LetterSecond Incomplete LetterInterrogatoriesDPH CommentsCorrected TextLetter Regarding Previous Approval.  Response to Interrogatories. Staff Report and Decision LetterFire Prevention & Emergency PlanningCompliance with Condition #1. Approved 02/18/16.

PETITION NO. 1209 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of the existing Hoffman Car Dealership building located at 36 Albany Turnpike, Simsbury, Connecticut. Staff Report and Decision LetterApproved 02/04/16.

PETITION NO. 1210 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of the existing Data Guard Records Centers building located at 1930 West Main Street, Stamford, Connecticut.  Staff Report and Decision LetterApproved 02/04/16.

PETITION NO. 1211 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of the existing Newtown Youth Academy Sports and Fitness Center building located at 4 Primrose Street, Newtown, Connecticut. Staff Report and Decision Letter.   Approved 02/18/16.

PETITION NO. 1212 - Town of Cheshire petition for a declaratory ruling for the Connecticut Siting Council to assume jurisdiction over an un-certificated telecommunications facility located at 1338 Highland Avenue, Cheshire, Connecticut. Record.  Staff Report and DecisionApproved 01/07/16.

PETITION NO. 1213 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the side of the existing Quassy Amusement Park maintenance building located at 2132 Middlebury Road, Middlebury, Connecticut. Staff Report and Decision LetterApproved 02/18/16.

PETITION NO. 1214 - Groton Fuel Cell 1, LLC petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 5.6 megawatt fuel cell combined heat and power electric generating facility located at the Pfizer Groton campus, 445 Eastern Point Road, Groton, Connecticut.  Approved 03/03/16.

PETITION NO. 1215 - RER CT 57 LLC Shagbark Lumber and Farm Supplies, Inc.declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 1.6 Megawatt Solar Photovoltaic Electric Generating facility located at 21 Mount Parnassus Road, a/k/a Route 434, East Haddam, Connecticut.   Approved 03/03/16.

PETITION NO. 1216 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Long Mountain Switching Station located at Long Mountain Road, New Milford, Connecticut and the reconductoring of approximately 5.3 miles of its existing No. 398 345-kV transmission line from Long Mountain Switching Station to the New York/Connecticut state line  in New Milford, Sherman, and Kent, Connecticut, and related transmission line structure improvements. Semi-annual Status of Construction Report, 07/03/17 Approved 03/31/16.

PETITION NO. 1217 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed separation of the existing 1779/1777 115 kilovolt (kV) electric transmission lines for 1.6 miles within existing right of way from Bloomfield Substation to Bloomfield Junction;  proposed separation of the existing 1751/1777 115kV electric transmission lines for 5.3 miles within existing right of way from Bloomfield Junction to North Bloomfield Substation; modifications to the existing overhead 1779 115 kV electric transmission line to loop into the Rood Avenue Substation via underground cables; including related transmission line structure improvements; and modifications to the Bloomfield Substation, 40 Crestview Drive and North Bloomfield Substation, 2 Hoskins Road both in Bloomfield, Connecticut and modifications to the Rood Avenue Substation located at 275 Rood Avenue, Windsor, Connecticut. Semi-annual Status of Construction Report, 07/03/17 Approved 04/28/16.

PETITION NO. 1218 - PSEG Power Connecticut LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a new 485 megawatt (MW) dual fuel combined-cycle electric generating facility at the existing Bridgeport Harbor Station located at 1 Atlantic Street, Bridgeport, Connecticut.  (Findings of Fact)  (Opinion)  (Decision and Order)  Approved 07/21/16.

PETITION NO. 1219Quantum Biopower Southington, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 1.1 megawatt anaerobic digestion and combined heat and power electric generating facility located at 49 DePaolo Drive, Southington, Connecticut. Approved 04/14/16.

PETITION NO. 1220 -Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and one 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located at 1219 and 1240 Voluntown Road, Griswold, Connecticut. Approved 06/23/16.

PETITION NO. 1221 - Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of two 1.0 Megawatt and one 1.5 Megawatt Solar Photovoltaic Electric Generating facilities located at 91 Plainfield Pike Road, Plainfield, Connecticut.  Denied 07/21/16.

PETITION NO. 1222 - Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and four 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located southeast of Hartford Turnpike and south of Fisk Road, Hampton, Connecticut.  Approved in part and Denied in part, 07/21/16.

PETITION NO. 1223 - SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 3.9 Megawatt Solar Photovoltaic Electric Generating facility located on municipally-owned property off Old Forge Road, Rocky Hill, Connecticut. Approved 05/12/16.

PETITION NO. 1224  - Woods Hill Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 17.61 Megawatt AC Solar Photovoltaic Electric Generating facility located at 90 and 101 Woods Hill Road, Pomfret, Connecticut. Approved 05/12/16.

PETITION NO. 1225  - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed rebuilding and reconductoring of approximately two miles of its existing No. 1682 115-kV transmission line within existing right of way from the Wilton Substation at 53 Old Danbury Road, Wilton to Norwalk Junction at 111 Danbury Road, Wilton, Connecticut. Semi-annual Status of Construction Report, 07/03/17 Approved 05/26/16.

PETITION NO. 1226 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of the new 115-kV Towantic Switching Station to be located adjacent to the Towantic Generating Station on Woodruff Hill Road, Oxford, Connecticut and the proposed modifications within existing right-of-way to its existing 1575 and 1585 115-kV electric transmission line extending 6.1 miles from Bunker Hill Substation, located at Clough Road, Waterbury, south through Middlebury to the proposed Towantic Switching station and reconductoring of its existing 1575 115-kV electric transmission line extending one mile from the proposed new switching station south to Structure 1446 (Oxford Tap) located near the Oxford Substation, Commerce Drive, Oxford. Semi-annual Status of Construction Report, 07/03/17 Approved 05/26/16.

PETITION NO. 1227 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of electric transmission line structures within approximately .8 miles of existing right of way along its existing No. 1975 115-kV transmission line traversing the municipalities of Middlefield, Durham and Middletown, Connecticut, and related transmission line structure improvements.  Approved 05/26/16.

PETITION NO. 1228 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Pootatuck Substation located at 14 Old Stratford Road in Shelton, Connecticut and related modifications to adjacent 115-kV transmission lines within existing Eversource Energy right-of-way.  Approved 07/07/16.

PETITION NO. 1229 - Bloom Energy Corporation, as an agent for Ikea, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 250-Kilowatt Fuel Cell Facility to be located at the Ikea store, 450 Sargent Drive, New Haven, Connecticut.  Approved 06/23/16.

PETITION NO. 1230 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Stony Hill Substation including the installation of a new access road to the substation on Eversource’s property located at 49 Stony Hill Road, Brookfield, Connecticut. Semi-annual Status of Construction Report, 07/03/17 Approved 06/23/16.


PETITION NO. 1231 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal and replacement of existing double-circuit lattice Structure 6-101 with two proposed single-circuit monopole structures to separate the existing 115-kilovolt (kV) 1572 and 1620 electric transmission lines located at NRG Energy, Inc.’s existing Middletown Power, LLC electric generating facility located at 1866 River Road, Middletown, Connecticut and related transmission line structure improvements.  Approved 06/23/16.

PETITION NO. 1232 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing telecommunications facility located at 167 Coccomo Circle (a/k/a Lester Street), New Britain, Connecticut. Approved 06/23/16.

PETITION NO. 1233 - Dominion Nuclear Connecticut, Inc. petition for a declaratory ruling that neither a new Certificate of Environmental Compatibility and Public Need (Certificate) nor a modification of the existing Certificate is required for the proposed construction, maintenance and operation of an on-site horizontal storage module fabrication area at the Millstone Power Station, Rope Ferry Road, Waterford, Connecticut.  Approved 07/21/16.

PETITION NO. 1234 - SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 2.8 Megawatt Solar Photovoltaic Electric Generating facility located at Becton, Dickinson & Company, 7 Grace Way, North Canaan, Connecticut. Approved 07/21/16.

PETITION NO. 1235 - Doosan Fuel Cell America, Inc. Constellation New Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility to be located at Middletown High School, 200 La Rosa Lane, Middletown, Connecticut. Approved 07/21/16.

PETITION NO. 1236 - Doosan Fuel Cell America, Inc. Constellation New Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility to be located at New Britain High School, 110 Mill Street, New Britain, Connecticut.  Approved 07/21/16.

PETITION NO. 1237 - Doosan Fuel Cell America, Inc. Constellation New Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility to be located at Shelton High School, 120 Meadow Street, Shelton, Connecticut. Approved 07/21/16.

PETITION NO. 1238 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the 1779 transmission line traversing the municipalities of Hartford, East Hartford, and South Windsor, Connecticut, and related transmission line structure improvements. Approved 10/27/16.

PETITION NO. 1239 – Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the planned addition of an impressed current cathodic protection system to the Iroquois pipeline located parallel to Webb Circle, Monroe, Connecticut. Approved 8/4/16.

PETITION NO. 1240 - Wallingford Energy, LLC, on behalf of the Town of Wallingford Electric Division, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the town’s existing Wallingford 13M substation located at 195 East Street in Wallingford and modifications to several existing town-owned 115-kV electric transmission lines including the reconductoring and extension of the 1305 line, the circuit-separation of the 1630 and 1640 lines and the potential re-routing of the 1208 line located in Wallingford, Connecticut.  Approved 08/04/16.


PETITION NO. 1241 - Cellco Partnership d/b/a Verizon Wireless Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the attachment of a telecommunications facility to the northerly façade of an existing building located at 1247 New Haven Road, Naugatuck, Connecticut.  Approved 8/4/16.

PETITION NO. 1242 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing office building located at 330 Market Street, Hartford, Connecticut. Approved 8/4/16.




PETITION NO. 1243 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Ansonia Substation located at 24 Franklin Street and 4 Riverside Drive in Ansonia, Connecticut.  Approved 8/4/16.

PETITION NO. 1244  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing commercial building located at 2985-3017 Berlin Turnpike, Newington, Connecticut. Approved 9/1/16.


PETITION NO. 1245 - T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of an additional rooftop wireless telecommunications facility located at the Connecticut Post Mall, 1201 Boston Post Road, Milford, Connecticut. Approved 9/1/16.

PETITION NO. 1246 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal of one existing 69-kV dead-end wood electric transmission line structure, replacement of two existing 69-kilovolt (kV) wood H-frame tap angle electric transmission line structures (Line 100 and Line 400) with two 3-pole weathering steel angle electric transmission line structures, relocation of the conductors from the existing electric transmission line structures to the proposed electric transmission line structures located at Gales Ferry Substation, 301 Whalehead Road, Ledyard, Connecticut and related transmission line and substation improvements. Semi-annual Status of Construction Report, 07/03/17 Approved 9/6/16.

PETITION NO. 1247 – C-TEC Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a 3.75 MW solar photovoltaic electric generating facility located at 1 Ballard Road 65 Thompson Road, Thompson, Connecticut. Approved 9/1/16.

PETITION NO. 1248 - TRS Fuel Cell, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 3.7 megawatt combined heat and power fuel cell facility to be located at 64 Triangle Street, Danbury, Connecticut. Approved 9/1/16.


PETITION NO. 1249 - Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the planned addition of a launcher and a mainline valve along the existing Iroquois pipeline right of way located off of Canterbury Lane in Newtown, Connecticut, and an above ground receiver and fuel cell generator to power the cathodic protection system along the existing Iroquois pipeline right of way located off of Stonebridge Trail in Newtown, Connecticut.  Approved 9/1/16.

PETITION NO. 1250 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of existing fence sections and the installation of grounding conductor within and outside the fence line at its existing New Congress Substation located at 55 Congress Street in Bridgeport, Connecticut. Approved 10/13/16.

PETITION NO. 1251 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed rebuilding and reconductoring of approximately 3.8 miles of its existing No. 900 69-kV transmission line within existing right of way between Skungamaug Substation and Mansfield Junction in Coventry, Connecticut, and related transmission line structure improvements. Semi-annual Status of Construction Report, 07/03/17 Approved 11/10/16.

PETITION NO. 1252 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing 70-foot tall telecommunications facility with a new 120-foot tall telecommunications facility at property owned by Eversource Energy used as a service center and maintenance yard located at 22 East High Street, East Hampton, Connecticut. Semi-annual Status of Construction Report, 07/03/17 Approved 11/10/16

PETITION NO. 1253 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of an existing commercial building located at 99 Hamilton Avenue, Stamford, Connecticut. Approved 10/27/16.

PETITION NO. 1254 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility to be attached to the existing sign structure on the roof of the Kingdom Alliance Corp. building located at 327 Huntington Street, New London, Connecticut. Approved 11/10/16.


PETITION NO. 1255 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Branford Double-Circuit Tower Split Project that includes modifications to the existing electric transmission line structure No. 4800, installation of a new electric transmission line structure No. 4782 and the separation of two existing 115-kilovolt (kV) electric transmission line circuits located within existing Eversource electric transmission line right of way between Interstate 95 and Eversource’s Branford Substation facility, East Main Street, Branford, Connecticut. Semi-annual Status of Construction Report, 07/03/17 Approved 11/10/16.


PETITION NO. 1256  - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of approximately 8 miles of its existing No. 1620/1975 115-kilovolt electric transmission line structures with new transmission line structures within existing right of way between Haddam Substation and Oxbow Junction in Haddam, Connecticut, and related transmission line structure improvements. Semi-annual Status of Construction Report, 07/03/17 Approved 12/08/16.

PETITION NO. 1257 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing customer-side 400-kW fuel cell with a 440-kW customer-side combined heat and power fuel cell located at the Eastern Connecticut State University Science Building, 83 Windham Street, Willimantic, Connecticut.  Approved 12/8/16.


 

PETITION NO. 1258 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing rooftop telecommunications facility and for the proposed construction, operation and maintenance of an additional rooftop telecommunications facility on an existing medical office building located at 1389 West Main Street, Waterbury, Connecticut. Approved 12/08/16.

PETITION NO. 1259 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Thames River Crossing Structure Replacement Project that includes replacement and re-conductoring of four double-circuit electric transmission line structures along approximately .5 miles of existing Eversource right of way between Montville and Ledyard, Connecticut, and related transmission line structure improvements. Semi-annual Status of Construction Report, 07/03/17 Approved 12/8/16.

PETITION NO. 1260 - Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 400-Kilowatt Fuel Cell Facility to be located at the Frontier building, 2 Washington Street, Norwalk, Connecticut. Approved 12/08/16.

PETITION NO. 1261 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing Verizon Wireless retail store building located at 70 Buckland Road, South Windsor, Connecticut.  Approved 12/8/16.

PETITION NO. 1262 - Doosan Fuel Cell America, Inc. Doosan Energy Solutions America, Inc. declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of 1380-kilowatt customer-side combined heat and power fuel cell facility to be located at the Borough of Naugatuck Waste Water Treatment Plant, 500 Cherry Street Extension, Naugatuck, Connecticut. Approved 2/16/17.

PETITION NO. 1263 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing customer-side 400 kilowatt (kW) fuel cell facility with a 440-kW customer-side fuel cell facility located at Mount Sinai Hospital, 500 Blue Hills Avenue, Hartford, Connecticut. Approved 03/02/17.

PETITION NO. 1264 - Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 400-Kilowatt Fuel Cell Facility to be located at the Frontier building, 25 Butler Street, Meriden, Connecticut. Approved 1/19/17.

PETITION NO. 1265 - Doosan Fuel Cell America Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a customer-side 460-kilowatt fuel cell facility to be located at the Norwich Inn and Spa, 607 West Thames Street, Norwich, Connecticut. Approved 03/16/17.
 

PETITION NO. 1266 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 1840-kilowatt customer-side fuel cell facility to be located at the Waterbury Water Pollution Control Plant, 210 Municipal Road, Waterbury, Connecticut. Approved 2/16/17.

PETITION NO. 1267 - Doosan Fuel Cell America Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a customer-side 460-kilowatt combined heat and power fuel cell facility to be located at the Glastonbury High School, 330 Hubbard Street, Glastonbury, Connecticut. Withdrawn.

PETITION NO. 1268 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 460-kilowatt customer-side combined heat and power fuel cell facility to be located at the Unilever Research and Development Center building, 20 Merritt Boulevard, Trumbull, Connecticut. Approved 03/16/17.

PETITION NO. 1269 - Doosan Fuel Cell America Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a customer-side 920-kilowatt combined heat and power fuel cell facility to be located at the Zygo Corporation, Laurel Brook Road, Middlefield, Connecticut.  Withdrawn.

PETITION NO. 1270 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing customer-side 200-kilowatt fuel cell facility with a 460-kilowatt customer-side combined heat and power fuel cell facility to be located at the Fairfield Wastewater Treatment Facility, 183 Richard White Way, Fairfield, Connecticut. Approved 03/16/17.

PETITION NO. 1271 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of the Hyllier dormitory building located at the University of Hartford, 200 Bloomfield Avenue, West Hartford, Connecticut. Approved 1/19/17.

PETITION NO. 1272 - Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 1.4-Megawatt Fuel Cell Facility to be located at the Frontier building, 310 Orange Street, New Haven, Connecticut. Approved 1/19/17.

PETITION NO. 1273 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on a new approximately 38-foot Eversource-owned utility pole that is not used principally for electric distribution service located in a public right of way adjacent to 264 Metcalf Road, Tolland, Connecticut. Approved 12/22/16. 
 

PETITION NO. 1274 - Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Frontier building, 39 West Street, Danbury, Connecticut. Approved 1/19/17.

PETITION NO. 1275 - Bloom Energy Corporation, as an agent for Stanley Black& Decker, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Stanley Access Technologies building, 65 Scott Swamp Road, Farmington, Connecticut. Approved 2/16/17.

PETITION NO. 1276 - Bloom Energy Corporation, as an agent for Stanley Black& Decker, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Stanley Engineered Fastening building, 4 Shelter Rock Lane, Danbury, Connecticut. Approved 1/19/17.

PETITION NO. 1277 - Bloom Energy Corporation, as an agent for Stanley Black& Decker, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 250-Kilowatt Fuel Cell Facility to be located at the Stanley Black & Decker World Headquarters, 1000 Stanley Drive, New Britain, Connecticut. Approved 2/16/17.

PETITION NO. 1278 - Bloom Energy Corporation, as an agent for Medtronic Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at 20 Middletown Avenue and a Customer-Side 300 Kilowatt Fuel Cell Facility to be located at 195 McDermott Road, both located at the Medtronic campus in North Haven, Connecticut. Approved 2/16/17.

PETITION NO. 1279
- Bloom Energy Corporation, as an agent for The TJX Companies Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 500-Kilowatt Fuel Cell Facility to be located at the TJX building, 1415 Blue Hills Avenue, Bloomfield, Connecticut. Approved 2/16/17.

PETITION NO. 1280 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of an existing commercial building located at 35-37 Danbury Road, Ridgefield, Connecticut. Approved 1/19/17.

PETITION NO. 1281 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 35-kilowatt propane-fueled back-up generator and a 1,000 gallon propane tank at an existing wireless telecommunication facility located at 21 Acorn Road, Branford, Connecticut.  Approved 1/19/17.

PETITION NO. 1282 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a wireless telecommunications facility on the roof of the existing office building located at 208 Harbor Drive, Stamford, Connecticut.  Approved 03/16/17.

PETITION NO. 1283 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Southington Substation located at 315 Belleview Avenue, Southington, Connecticut. Semi-annual Status of Construction Report, 07/03/17 Approved 2/16/17.

PETITION NO. 1284 - Bloom Energy Corporation, as an agent for FedEx Ground, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 250-Kilowatt Fuel Cell Facility to be located at the FedEx Ground building, 40 Kennedy Road, South Windsor, Connecticut. Approved 2/16/17.

PETITION NO. 1285 -
Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on a replacement light pole located at Samuel M. Peretz Park, 221 West Main Street, Niantic (East Lyme), Connecticut. Approved 2/16/17.

PETITION NO. 1286 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed West Brookfield Reliability Project that includes reconductoring of approximately 1.4 miles of its existing No. 1887 115-kilovolt (kV) electric transmission line within existing Eversource electric transmission line right of way between the existing West Brookfield Substation located at 83 Prange Road and the existing West Brookfield Junction near Pocono Road in Brookfield, Connecticut, installation of two 14.4 Megavolt Ampere Reactive (MVAR) capacitor banks at the West Brookfield Substation located at 83 Prange Road, Brookfield, Connecticut and related substation and transmission line structure improvements. Semi-annual Status of Construction Report, 07/03/17 Approved 03/16/17. 

PETITION NO. 1287 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Redding to Wilton Project that includes structure and conductor replacements of approximately 5 miles of its existing No. 1470 115-kilovolt electric transmission line within existing Eversource electric transmission line right of way between the existing Peaceable Substation located at 520 Peaceable Street in Redding, Connecticut and the existing Wilton Substation located at 53 Old Danbury Road in Wilton, Connecticut, and related substation and transmission line structure improvements. Semi-annual Status of Construction Report, 07/03/17 Approved 03/02/17.
 


PETITION NO. 1288 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility to be attached to an existing chimney on the roof of the YWCA building located at 19 Franklin Square, New Britain, Connecticut. Approved 03/16/17.

PETITION NO. 1289 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Green Hill Substation located at 775 Green Hill Road, Madison, Connecticut.  Approved 03/30/17.

PETITION NO. 1290 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility to be attached to an existing facade on the roof of The Pavilion Restaurant building located at 85 Swan Avenue, Old Lyme, Connecticut. Approved 03/16/17.

PETITION NO. 1291 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the Towantic Line Upgrades Project that includes rebuilding and reconductoring approximately 4.4 miles of its existing 115-kilovolt electric transmission lines within existing Eversource right of way between Devon 7R Substation and East Devon Junction both located in the City of Milford, Connecticut; between the West Devon Junction located in the Town of Stratford, Connecticut and Trumbull Junction located in the Town of Trumbull, Connecticut; and between Devon 7R Substation located in the City of Milford, Connecticut and West Devon Junction located in the Town of Stratford, Connecticut and related transmission line structure improvements. Semi-annual Status of Construction Report, 07/03/17 Approved 04/27/17.

PETITION NO. 1292 - Bloom Energy Corporation, as an agent for Digital Realty, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 2 Megawatt Fuel Cell Facility to be located at the Digital Realty building, 80 Merritt Boulevard, Trumbull, Connecticut. Approved 04/27/17.

PETITION NO. 1293  – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements to comply with the updated National Electric Safety Code clearance requirements. Approved 03/30/17.

PETITION NO. 1294  – LSE Canes Venatici LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 2.0 megawatt AC Solar Photovoltaic Electric Generating facility located at East Windsor Tax Assessor Map 037, Block 65, Lot 027A, Wapping Road, East Windsor, Connecticut. (NORCAP North). Approved 05/25/17.

PETITION NO. 1295  – LSE Coma Berenices LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 2.0 megawatt AC Solar Photovoltaic Electric Generating facility located at East Windsor Tax Assessor Map 027, Block 65, Lot 031, 90 Wapping Road, East Windsor, Connecticut. (NORCAP South). Approved 05/25/17.

PETITION NO. 1296 - Bloom Energy Corporation, as an agent for Home Depot, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200 Kilowatt Fuel Cell Facility and a 100 Kilowatt Auxiliary Battery Storage Facility to be located at the Home Depot building, 111 Universal Drive North, North Haven, Connecticut. Approved 05/11/17.

PETITION NO. 1297 - Bloom Energy Corporation, as an agent for Home Depot, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200 Kilowatt Fuel Cell Facility and a 100 Kilowatt Auxiliary Battery Storage Facility to be located at the Home Depot building, 115 Putnam Boulevard, Glastonbury, Connecticut. Approved 05/11/17.

PETITION NO. 1298 - Bloom Energy Corporation, as an agent for Home Depot, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200 Kilowatt Fuel Cell Facility and a 100 Kilowatt Auxiliary Battery Storage Facility to be located at the Home Depot building, 440 Boston Post Road, Orange, Connecticut. Approved 05/26/17.

PETITION NO. 1299 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of the existing commercial building located at 777 Boston Post Road, Darien, Connecticut. Approved 5/30/2017.
 
PETITION NO. 1300 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and relocation of an existing rooftop telecommunications facility installed at the front of the building with a new rooftop telecommunications facility to be installed at the rear of the building located at 1 Circular Avenue, Hamden, Connecticut. Approved 7/20/2017.
 
PETITION NO. 1301 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the Masonicare Health Center building located at 22 Masonic Avenue, Wallingford, Connecticut. Approved 6/22/2017.
 
PETITION NO. 1302 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing West Side Substation located at 52 Columbus Avenue, Middletown, Connecticut.
Approved 7/20/2017.
 
 

PETITION NO. 1303 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of an existing commercial building located at 1069 East Main Street, Stamford Connecticut. Approved 07/20/17.

PETITION NO. 1304 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Stratford 115-kV Transmission Line Upgrade Project consisting of the removal and relocation of northern and southern sections of existing 115-kilovolt (kV) transmission line structures from Connecticut Department of Transportation (ConnDOT) catenary structures within the Metro-North Railroad corridor to new 115-kV transmission line structures to be located within the existing ConnDOT right of way and upgrade of 115-kV conductors extending approximately 1.9 miles from UI’s Baird Substation to just west of the Housatonic River in Stratford, Connecticut, and related substation improvements. Approved 07/20/17.

PETITION NO. 1305 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of a commercial building located at 1280 Hartford Turnpike, Vernon, Connecticut. Approved 7/20/2017.

PETITION NO. 1306 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 597 Farmington Avenue in Bristol, Connecticut. Approved 07/20/17.

PETITION NO. 1307 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing banquet center building located at Ocean Beach Park, 98 Neptune Avenue, New London, Connecticut. Approved 7/20/2017.

 
PETITION NO. 1308 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of two existing radio telecommunications facilities with a new 63.6-foot telecommunications facility on the roof of its existing Danielson Work Center used as a service center and maintenance yard located on property owned by Eversource Energy at 173 Mechanic Street, Killingly, Connecticut. Approved 7/20/2017.
 
PETITION NO. 1309 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a telecommunications facility located at 93 North Airline Road, Wallingford, Connecticut. Approved 7/20/2017.

PETITION NO. 1311 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of the existing Yarnall Athletic Center and Bookstore at Mitchell College located at 40 Debiasi Drive, New London, Connecticut. Approved 8/31/2017
 
PETITION NO. 1314 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed 1555 Line Rebuild Project consisting of the structure and conductor replacements on its existing 115-kilovolt electric transmission line extending approximately 6.6 miles within existing Eversource electric transmission line right-of-way between the existing Bulls Bridge Substation located at 781 Kent Road and the existing Rocky River Junction located off Boardman Road in New Milford, Connecticut. Approved 8/31/2017

  

PETITION NO. 1315 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing community antenna television (CATV) tower located at 7 Colburn Road, Canterbury, Connecticut. Approved 8/31/2017

PETITION NO. 1316 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located 1245 Farmington Avenue, West Hartford, Connecticut. Approved 9/28/2017
 
PETITION NO. 1317 – Broad Street Fuel Cell, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 1.4 megawatt customer-side combined heat and power fuel cell facility to be located adjacent to and south of the Ferris Athletic Center at Trinity College, 300 Summit Street, Hartford, Connecticut.  Approved 09/14/2017
 

PETITION NO. 1318 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 3039 Main Street, Glastonbury, Connecticut. Approved 09/14/2017


PETITION NO. 1319 – New Cingular Wireless, PCS, LLC (AT&T), as agent for American Tower Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed extension of an existing telecommunications facility located at 585 South Main Street, Naugatuck, Connecticut. Approved 9/28/2017


PETITION NO. 1320 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing wireless telecommunications facility located at 36 Hatchetts Hill Road, Old Lyme, Connecticut. Approved 9/28/2017


PETITION NO. 1322 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing utility pole outside of the public right of way located at Mount Southington Ski Area, 396 and 412 Mount Vernon Road, Southington, Connecticut. Approved 9/28/2017

 

PETITION NO. 1324 – Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 1.0 Megawatt AC solar photovoltaic electric generating facilities located at Plainfield Pike Road, Plainfield, Connecticut. Withdrawn 10/04/17

 

 

 