CSC: Pending Matters
Common Elements

Pending Matters

 
The hyperlinks that appear below lead to web pages devoted to record materials relating to matters that are pending before the Siting Council.
 

Please note, the Connecticut Siting Council (Council) is not required to maintain an online data base of Pending Matters.  Due to a high volume of filings, the Council may not be able to keep the information found on these sites up to date.  For complete Pending Matter information, please contact the Council's staff or feel free to view the hard copy of the pertinent file in the Council’s office.  The Council endeavors to keep information up to date for the convenience of the public.

 
The Council's preferred method of service to participants in a matter is via electronic mail.  If a participant prefers to receive hard copies of documents via regular mail, please notify the Council in writing.

If you do not find the matter you are looking for, it is likely that a decision was recently rendered and the matter may be accessed through the Decisions page at the following link Council Decisions.
_____________________________________

DOCKETS
 _____________________________________
 


DOCKET NO. 461A - Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 115-kilovolt (kV) bulk substation located at 290 Railroad Avenue, Greenwich, Connecticut, and two 115-kV transmission circuits extending approximately 2.3 miles between the proposed substation and the existing Cos Cob Substation, Greenwich, Connecticut, and related substation improvements. Reopening of this docket based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).

 

DOCKET NO. 474 - The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Greater Hartford-Central Connecticut Reliability Project that traverses the municipalities of Hartford, West Hartford, and Newington, which consists of (a) construction, maintenance and operation of a new 115-kilovolt (kV) electric transmission line within existing Eversource, Amtrak and public road rights-of-way and associated facilities extending overhead approximately 2.4 miles and underground approximately 1.3 miles between Eversource’s existing Newington Substation in the Town of Newington and existing Southwest Hartford Substation in the City of Hartford; (b) modifications to a .01 mile section within existing Eversource right-of-way of the existing overhead 115-kV electric transmission line connection to the Newington Substation (Newington Tap); and (c) related modifications to Newington Substation and Southwest Hartford Substation.

DOCKET NO. 475 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located adjacent to the maintenance building at the Skungamaug Golf Course, south of Folly Lane, at Coventry Tax Assessor’s Map 006, Block 0026, Lot 0101, Coventry, Connecticut.

DOCKET NO. 476 - Eco-Site, Inc. and T-Mobile Northeast, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 248 Hall Hill Road, Somers, Connecticut.

DOCKET NO. 477 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 46 Cemetery Road, Canterbury, Connecticut.

DOCKET NO. 478 - Eco-Site, Inc. and T-Mobile Northeast, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 63 Woodland Street, Glastonbury, Connecticut.

DOCKET NO. 479 -  Tarpon Towers II, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 380 Horace Street, Bridgeport, Connecticut.

_____________________________________

PETITIONS
_____________________________________

 
PETITION NO. 1310 - Quinebaug Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 50 megawatt AC solar photovoltaic electric generating facility on approximately 561 acres comprised of 29 separate and abutting privately-owned parcels located generally north of Wauregan Road in Canterbury and south of Rukstela Road and Allen Hill Road in Brooklyn, Connecticut.

PETITION NO. 1312 - Candlewood Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 20 megawatt AC (26.5 megawatt DC) solar photovoltaic electric generating facility located on a 163 acre parcel at 197 Candlewood Mountain Road and associated electrical interconnection to Eversource Energy’s Rocky River Substation on Kent Road in New Milford, Connecticut.

PETITION NO. 1313 – DWW Solar II, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 26.4 megawatt AC solar photovoltaic electric generating facility on approximately 289 acres comprised of 5 separate and abutting privately-owned parcels located generally west of Hopmeadow Street (US 202/CT 10), north and south of Hoskins Road, and north and east of  County Road and associated electrical interconnection to Eversource Energy’s North Simsbury Substation west of Hopmeadow Street in Simsbury, Connecticut.

PETITION NO. 1321 - The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing East Shore Substation located at 1 Waterfront Street, New Haven, Connecticut.


PETITION NO. 1323 – Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt AC and two 1.0 Megawatt AC solar photovoltaic electric generating facilities on an approximate 43 acre parcel located at 134 Bilton Road, Somers, Connecticut.

PETITION NO. 1325 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing telecommunications facility on electric transmission line structure No. 9950, owned by Eversource Energy within an existing Eversource Energy electric transmission line right-of-way, located at the Birchwood Condominium Complex, 27 Crows Nest Lane, Danbury, Connecticut.

PETITION NO. 1326 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of an existing commercial building located at 1385 Post Road East, Westport, Connecticut.


PETITION NO. 1327 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 623 Pine Street, Bridgeport, Connecticut. 



PETITION NO. 1328 – Windham Solar LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of one 1-megawatt (MW) and one .99-MW solar photovoltaic electric generating facilities located at 481 Mashamoquet Road, Pomfret, Connecticut.


PETITION NO. 1329 - Doosan Fuel Cell America, Incorporated petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 440 kilowatt fuel cell facility to be located at the West Haven Water Pollution Control Authority Complex, 2 Beach Street, West Haven, Connecticut.


PETITION NO. 1330 - MCM Communications, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a temporary tower facility and associated equipment to be located on Connecticut Water Company property at 1542 Boston Post Road, Westbrook, Connecticut.


PETITION NO. 1331 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of two small cell wireless telecommunications facilities located at Lime Rock Park, 497 Lime Rock Road, Lakeville (Salisbury), Connecticut.


PETITION NO. 1332 – Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side one-megawatt fuel cell facility to be located at the FedEx Ground building, Middle Street, Middletown, Connecticut. 






TOWER SHARE REQUESTS
______________________________________


TS-T-MOBILE-077-171002 - T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 60 Adams Street, Manchester, Connecticut. Town Letter Incomplete Supplemental Modification Design Drawings

 

PETITION NO. 1133 - SUB PETITION FILINGS
______________________________________
 
PE1133-VER-20171004 – Cellco Partnership d/b/a Verizon Wireless sub-petition for a declaratory ruling for approval of an eligible facility request for modifications to an existing telecommunications facility located at 365 Hartford Road, New Britain, Connecticut. City of New Britain Comments and CSC Response Additional Comments from the City of New Britain
 
 

 
 

The following have been acted upon by the Siting Council and await approval of their Development and Management Plans:
______________________________________


DOCKET NO. 453 – American Tower Corporation and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Manchester Tax Assessor Map 133, Block 3700, Lot 701, 701 Lydall Street, Manchester, Connecticut.

 

DOCKET NO. 471 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Hamden Tax Assessor’s Map 2826, Block 24, 208 Kirk Road (a/k/a 1075 Paradise Avenue), Hamden, Connecticut.

DOCKET NO. 472 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Bridgeport Tax Assessor’s Map 85, Block 2805, Lot 29, 541 Broadbridge Road, Bridgeport, Connecticut.

DOCKET NO. 473 - Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 515 Morehouse Road, Easton, Connecticut.

PETITION NO. 1184 - Beacon Falls Energy Park, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 63.3 Megawatt AC fuel cell facility located on Lopus Road, Beacon Falls, Connecticut. 

PETITION NO. 1195 - SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 4.05 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located on municipally-owned property at 1240 Poquonnock Road, Groton, Connecticut. 

PETITION NO. 1220 -Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and one 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located at 1219 and 1240 Voluntown Road, Griswold, Connecticut.

PETITION NO. 1222 - Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and four 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located southeast of Hartford Turnpike and south of Fisk Road, Hampton, Connecticut.

PETITION NO. 1294 – LSE Canes Venatici LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 2.0 megawatt AC Solar Photovoltaic Electric Generating facility located at East Windsor Tax Assessor Map 037, Block 65, Lot 027A, Wapping Road, East Windsor, Connecticut. (NORCAP North).

PETITION NO. 1295 – LSE Coma Berenices LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 2.0 megawatt AC Solar Photovoltaic Electric Generating facility located at East Windsor Tax Assessor Map 027, Block 65, Lot 031, 90 Wapping Road, East Windsor, Connecticut. (NORCAP South).

 
 

OTHER CSC PROCEEDINGS

2016/2017 Connecticut Siting Council Review of the Ten Year Forecast of Connecticut Electric Loads and Resources (2016-2025)
 
LIFE-CYCLE 2017 - Connecticut Siting Council 2017 Analysis of Life-Cycle Costs of Electric Transmission Lines.
______________________________________
 


Content Last Modified on 10/19/2017 11:44:20 AM