The hyperlinks that appear below lead to web pages devoted to record materials relating to matters that are pending before the Siting Council.
 

Please note, the Connecticut Siting Council (Council) is not required to maintain an online data base of Pending Matters.  Due to a high volume of filings, the Council may not be able to keep the information found on these sites up to date.  For complete Pending Matter information, please contact the Council's staff or feel free to view the hard copy of the pertinent file in the Council’s office.  The Council endeavors to keep information up to date for the convenience of the public.

 
The Council's preferred method of service to participants in a matter is via electronic mail.  If a participant prefers to receive hard copies of documents via regular mail, please notify the Council in writing.

If you do not find the matter you are looking for, it is likely that a decision was recently rendered and the matter may be accessed through the Decisions page at the following link Council Decisions.
_____________________________________

APPLICATIONS
 
DOCKET NO. 486 - Tarpon Towers II, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 796 Woodin Street, Hamden, Connecticut.
 

 
PETITIONS
 
PETITION NO. 1278A - Bloom Energy Corporation, as an agent for Medtronic Inc., request to amend its declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Phase II construction, operation and maintenance of a Customer-Side 2000-Kilowatt fuel cell facility to be located at 86 Middletown Road and a second Customer-Side 2000-Kilowatt Fuel Cell Facility to be located at 195 McDermott Road, both located at the Medtronic campus in North Haven, Connecticut.
 
PETITION NO. 1364A - Cellco Partnership d/b/a Verizon Wireless request to amend its declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial and residential building located at 192 Main Street, Norwich, Connecticut.
 
PETITION NO. 1379 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility on the roof of an existing building located at 1270 North High Street (a/k/a State Route 100), East Haven, Connecticut.  Link to Petition No. 1096

PETITION NO. 1380 – LSE Delphinus, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.992-megawatt AC solar photovoltaic electric generating facility on approximately 9.86 acres located generally east of Powder Hill Road north of the intersection with Monroe Road and Abbe Road in Enfield, Connecticut and associated electrical interconnection.

PETITION NO. 1381 – Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 600-kilowatt fuel cell facility and associated equipment to be located at the Hospital for Special Care, 2150 Corbin Avenue, New Britain, Connecticut.
 
PETITION NO. 1382 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1355 Line Rebuild Project consisting of the replacement and reconductoring of approximately 1.38 miles of its existing No. 1355 115-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right-of-way between a location just east of the existing Schwab Junction off of Chimney Hill Road and Colony Substation off of Old Colony Road in Wallingford, Connecticut, and related substation and electric transmission line structure improvements.

PETITION NO. 1383 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 750-kilowatt fuel cell facility and associated equipment to be located at Charlotte Hungerford Hospital, 540 Litchfield Street, Torrington, Connecticut.
 
PETITION NO. 1384 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of electric transmission line structures along approximately 18 miles of its existing No. 1505/1607 115-kilovolt (kV) double-circuit electric transmission line within existing Eversource electric transmission line right-of-way between the existing Tunnel Substation in Preston, the existing Fry Brook Substation in Plainfield and the existing Brooklyn Substation in Brooklyn, Connecticut, traversing Preston, Canterbury, Plainfield and Brooklyn, and related electric transmission structure improvements.
 
PETITION NO. 1385Cobb Road, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.95-megawatt AC solar photovoltaic electric generating facility on approximately 11.16 acres located at 20-1 Short Hills Road, Old Lyme, Connecticut and associated electrical interconnection.

PETITION NO. 1386 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility at an existing Eversource-owned electric transmission line structure (#917) within an existing Eversource electric transmission line right-of-way located at 5 Tall Pines Drive, Weston, Connecticut.


 
TOWER SHARE REQUESTS
 
TS-SPRINT-077-191001 - Sprint Spectrum L.P. (“Sprint”) request for an order to approve tower sharing at an existing telecommunications facility located at 250 Olcott Street, Manchester, Connecticut. Town Letter Incomplete Letter
 
 
 
 

 

PETITION NO. 1133 - SUB PETITION FILINGS
 
 

 
The following have been acted upon by the Siting Council and await approval of their Development and Management Plans:
______________________________________


DOCKET NO. 470B – NTE Connecticut, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 550-megawatt dual-fuel combined cycle electric generating facility and associated electrical interconnection switchyard located  at 180 and 189 Lake Road, Killingly, Connecticut.  Reopening of this application based on changed conditions pursuant to Connecticut General Statutes §4-181a(b).


DOCKET NO. 477 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 46 Cemetery Road, Canterbury, Connecticut.

 
DOCKET NO. 481 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 667, 665, 663 and 663R Main Street, Cromwell, Connecticut.

DOCKET NO. 482 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility on town-owned property behind Lyman Memorial High School located at 917 Exeter Road, Lebanon, Connecticut.

DOCKET NO. 483 - The United Illuminating Company application for a Certificate of Environmental Compatibility and Public Need for the Pequonnock Substation Rebuild Project that entails construction, maintenance, and operation of a 115/13.8-kilovolt (kV) gas insulated replacement substation facility located 700 feet southwest of UI’s existing Pequonnock substation on an approximately 3.7 acre parcel owned by PSEG Power Connecticut, LLC at 1 Kiefer Street, Bridgeport, Connecticut, and related transmission structure and interconnection improvements.

DOCKET NO. 484 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility at one of three locations at 72 Ragged Hill Road, Pomfret, Connecticut.

DOCKET NO. 485 – MCM Holdings, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility at one of two sites: 1542 Boston Post Road or at the end of Kirtland Street, Westbrook, Connecticut.

 
PETITION NO. 1184 - Beacon Falls Energy Park, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 63.3 Megawatt AC fuel cell facility located on Lopus Road, Beacon Falls, Connecticut. 

PETITION NO. 1222 - Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and four 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located southeast of Hartford Turnpike and south of Fisk Road, Hampton, Connecticut.

PETITION NO. 1328  – Windham Solar LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of one 1-megawatt (MW) and one .99-MW solar photovoltaic electric generating facilities located at 481 Mashamoquet Road, Pomfret, Connecticut.

PETITION NO. 1345 – Pawcatuck Solar Center LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 15 MW AC solar photovoltaic electric generating facility on approximately 353 acres comprised of four abutting parcels located east of Pendleton Hill Road, north of the Pawcatuck River and south of Interstate-95 with proposed access from Ella Wheeler Road, and associated electrical interconnection to Eversource Energy’s Shunock Substation west of Pendleton Hill Road in North Stonington, Connecticut.

PETITION NO. 1352 - Nutmeg Solar, LLC, petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 19.6-megawatt AC solar photovoltaic electric generating facility on approximately 162 acres comprised of 9 separate parcels located generally south of Bailey Road and east of Route 191 (Broad Brook Road), and associated electrical interconnection to Eversource Energy’s Scitico Substation at 20 Bailey Road in Enfield, Connecticut.

PETITION NO. 1372 – Derby Fuel Cell, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 14.0-megawatt fuel cell facility and associated equipment to be located at 200 Roosevelt Drive, Derby, Connecticut.