CSC: Pending Proceedings

Pending Proceedings

 
The hyperlinks that appear below lead to web pages devoted to record materials relating to proceedings that are pending before the Siting Council.
 

Please note, the Connecticut Siting Council (Council) is not required to maintain an online data base of Pending Proceedings.  Due to a high volume of filings, the Council may not be able to keep the information found on these sites up to date.  For complete Pending Proceeding information, please contact the Council's staff or feel free to view the hard copy of the pertinent file in the Council’s office.  The Council endeavors to keep information up to date for the convenience of the public.

 
The Council's preferred method of service to participants in a proceeding is via electronic mail.  If a participant prefers to receive hard copies of documents via regular mail, please notify the Council in writing.
_____________________________________

DOCKETS
 _____________________________________
 

DOCKET NO. 466 - The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Frost Bridge to Campville 115-kilovolt (kV) electric transmission line project that traverses the municipalities of Watertown, Thomaston, Litchfield, and Harwinton, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 10.4 miles between Eversource’s existing Frost Bridge Substation in the Town of Watertown and existing Campville Substation in the Town of Harwinton; (b) related modifications to Frost Bridge Substation and Campville Substation; and (c) reconfiguration of a 0.4 mile segment of two existing 115-kV electric transmission lines across the Naugatuck River in the Towns of Litchfield and Harwinton within the same existing right-of-way as the new 115-kV electric transmission line.


DOCKET NO. 465 - The United Illuminating Company application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 115/13.8-kilovolt (kV) replacement substation facility located on an approximately 1.5 acre portion of two adjoining UI-owned parcels directly adjacent to UI’s existing Baird Substation, 1770 Stratford Avenue, Stratford, Connecticut, and related transmission structure and interconnection improvements.


DOCKET NO. 464 - Blue Sky Towers, LLC and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Bridgeport Tax Assessor Map 53, Block 1527, Lot 2, 220 Evergreen Street, Bridgeport, Connecticut.


DOCKET NO. 463 - American Towers, LLC and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at East Lyme Tax Assessor Parcel ID 29.0 45, 351A Boston Post Road, East Lyme, Connecticut.


DOCKET NO. 461 - Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 115-kilovolt (kV) bulk substation located at 290 Railroad Avenue, Greenwich, Connecticut, and two 115-kV underground transmission circuits extending approximately 2.3 miles between the proposed substation and the existing Cos Cob Substation, Greenwich, Connecticut, and related substation improvements.
 
 

 
The following have been acted upon by the Siting Council and await approval of their Development and Management Plans:
______________________________________
 

DOCKET NO. 462 – Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Danbury Tax Assessor’s Map L16, Lot 5, 15 Great Pasture Road, Danbury, Connecticut.

  
DOCKET NO. 453 – American Tower Corporation and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Manchester Tax Assessor Map 133, Block 3700, Lot 701, 701 Lydall Street, Manchester, Connecticut.
 
PETITION NO. 1176 – The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Bridgeport 115-kV transmission line upgrade project consisting of the northern and southern sections of 115-kV lines extending from Congress Substation in the City of Bridgeport to Baird Substation in the Town of Stratford, Connecticut, and related substation improvements.

PETITION NO. 1178 – Fusion Solar Center, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation and maintenance of a ground-mounted 20 megawatt solar photovoltaic electric generating facility located on Potash Hill Road, Sprague, Connecticut.

PETITION NO. 1184 - Beacon Falls Energy Park, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 63.3 Megawatt AC fuel cell facility located on Lopus Road, Beacon Falls, Connecticut. 

PETITION NO. 1195 - SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 4.05 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located on municipally-owned property at 1240 Poquonnock Road, Groton, Connecticut.  Date of Decision. SolarCity/DEEP Comments. Staff Report and Decision Letter.

_____________________________________

PETITIONS
_____________________________________

PETITION NO. 1204 - Bloom Energy Corporation, as an agent for Legrand, S.A., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 500-Kilowatt Fuel Cell Facility to be located at Legrand Wiremold, 60 Woodlawn Street, West Hartford, Connecticut.  Incomplete LetterResponse to Incomplete LetterInterrogatoriesResponse to Interrogatories. Date of Decision LetterRequest for Sound StudySound Study Report.

 

PETITION NO. 1207 - Bloom Energy Corporation, as an agent for Wal-mart Stores, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at Walmart, 450 Providence Road, Brooklyn, Connecticut.  Incomplete LetterSecond Incomplete LetterAbutter's OverviewInterrogatoriesDPH Comments. Corrected Proof of Notice. Response to Interrogatories.

 

PETITION NO. 1208 - Bloom Energy Corporation, as an agent for Wal-mart Stores, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Sam’s Club store, 69 Pavillions Drive, Manchester, Connecticut. Incomplete LetterSecond Incomplete LetterInterrogatoriesDPH CommentsCorrected Text

Letter Regarding Previous Approval.  Response to Interrogatories.

  

PETITION NO. 1211 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of the existing Newtown Youth Academy Sports and Fitness Center building located at 4 Primrose Street, Newtown, Connecticut.

 

PETITION NO. 1213 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the side of the existing Quassy Amusement Park maintenance building located at 2132 Middlebury Road, Middlebury, Connecticut.

 

PETITION NO. 1214 – Groton Fuel Cell 1, LLC petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 5.6 megawatt fuel cell combined heat and power electric generating facility located at the Pfizer Groton campus, 445 Eastern Point Road, Groton, Connecticut.

 

PETITION NO. 1215 – Shagbark Lumber and Farm Supplies, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 1.6 Megawatt Solar Photovoltaic Electric Generating facility located at 21 Mount Parnassus Road, a/k/a Route 434, East Haddam, Connecticut.  Set 1 Interrogatories.

 

PETITION NO. 1216 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Long Mountain Switching Station located at Long Mountain Road, New Milford, Connecticut and the reconductoring of approximately 5.3 miles of its existing No. 398 345-kV transmission line from Long Mountain Switching Station to the New York/Connecticut state line  in New Milford, Sherman, and Kent, Connecticut, and related transmission line structure improvements.


TOWER SHARE REQUESTS
______________________________________
 
TS-CING-034-160202 – New Cingular Wireless PCS, LLC (AT&T) request for an order to approve the shared used of an existing telecommunications facility located at 303 Boxwood Lane, Danbury, Connecticut.
 
TS-VER-027-151228 Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 21 East Main Street, Clinton, Connecticut.  Revised Structural Analysis.
____________________________________
 
OTHER CSC PROCEEDINGS
______________________________________
 
2016/2017 Connecticut Siting Council Review of the Ten Year Forecast of Connecticut Electric Loads and Resources (2016-2025)

______________________________________
 
 


Content Last Modified on 2/10/2016 3:33:01 PM