CSC: Pending Proceedings

Pending Proceedings

 
The hyperlinks that appear below lead to web pages devoted to record materials relating to proceedings that are pending before the Siting Council.
 

Please note, the Connecticut Siting Council (Council) is not required to maintain an online data base of Pending Proceedings.  Due to a high volume of filings, the Council may not be able to keep the information found on these sites up to date.  For complete Pending Proceeding information, please contact the Council's staff or feel free to view the hard copy of the pertinent file in the Council’s office.  The Council endeavors to keep information up to date for the convenience of the public.

 
The Council's preferred method of service to participants in a proceeding is via electronic mail.  If a participant prefers to receive hard copies of documents via regular mail, please notify the Council in writing.
_____________________________________

DOCKETS
 _____________________________________

DOCKET NO. 459 - Message Center Management, Inc. and New Cingular Wireless PCS, LLC (AT&T) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Glastonbury Tax Assessor Map E3, Block 0820, Lot E0002, Seven J’s Farm, Candlewood Road, Glastonbury, Connecticut.

DOCKET NO. 458 - Florida Tower Partners LLC d/b/a North Atlantic Towers Application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation, of a telecommunications facility at one of two locations at Bethel Tax Assessor’s Map 65, Block 57, Lot 122, 62-64 Codfish Hill Road, Bethel, Connecticut.
 
DOCKET NO. 456 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Plymouth Tax Assessor Map 054/065/016A-1, 33 Keegan Road, Plymouth, Connecticut.
 
DOCKET NO. 454 - Tower Holdings, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Farmington Tax Assessor Parcel ID Maps 25 and 26, Lots 3A and 3B, 199 Brickyard Road, Farmington, Connecticut.
 

 
The following dockets have been acted upon by the Siting Council and await approval of their Development and Management Plans:
______________________________________
 
DOCKET NO. 455 Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Southington Tax Assessor Map/Lot 066053, 99 East Street, Southington, Connecticut.
 
DOCKET NO. 453 – American Tower Corporation and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Manchester Tax Assessor Map 133, Block 3700, Lot 701, 701 Lydall Street, Manchester, Connecticut.
 
DOCKET NO. 452 - Homeland Towers, LLC and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Salisbury Tax Assessor Map 16 Lot 5, 250 Canaan Road, Salisbury, Connecticut.

DOCKET NO. 451 - Homeland Towers, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at the Cheshire Wastewater Treatment Plant, Cheshire Tax Assessor Map 38, Lot 180, 1325 Cheshire Street, Cheshire, Connecticut.


DOCKET NO. 449 - Message Center Management Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Redding Tax Assessor Map 23, Lot 72, Redding Ridge Fire Department, 186 Black Rock Turnpike, Redding, Connecticut.


DOCKET NO. 448 - Cellco Partnership d/b/a Verizon Wireless Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Orange Tax Assessor Map 77, Block 3, Lot 1, 831 Derby Milford Road, Orange, Connecticut.

 
DOCKET NO. 421 – T-Mobile Northeast LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility located at 158 Edison Road, Trumbull, Connecticut.
 
DOCKET NO. 192B - CPV Towantic, LLC Motion to Reopen and Modify the June 23, 1999 Certificate of Environmental Compatibility and Public Need based on changed conditions pursuant to Connecticut General Statutes §4-181a(b) for the construction, maintenance and operation of a 785 MW dual-fuel combined cycle electric generating facility located north of the Prokop Road and Towantic Hill Road intersection in the Town of Oxford, Connecticut.
 
_____________________________________

PETITIONS
_____________________________________

PETITION NO. 1120  The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Hawthorne Substation located at 180 Hawthorne Drive, Fairfield, Connecticut.

  

PETITION NO. 1135 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and expansion of an existing light pole for the installation of telecommunications antennas and associated equipment at Penders Field, Longbrook Park, located at Glendale Road, Stratford, Connecticut.  Date for Decision.

 

PETITION NO. 1150 – SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 3.1 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located on Brush Hill Road in Bozrah, Connecticut.

 

PETITION NO. 1151 – The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal and replacement of the existing 115-kV transmission line structures in the Connecticut Department of Transportation right-of-way outside of Milvon substation located at 772 Bridgeport Avenue, Milford, Connecticut.  Protective Order Documents.  Approval of Protective OrderSigned Protective OrderUI Interrogatory Responses.

 

PETITION NO. 1152 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary telecommunications facility located at East Lyme Tax Assessor Map 30, Lot 1, Ancient Highway, East Lyme, Connecticut. 

 

PETITION NO. 1153 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Sandy Hook Substation and associated transmission lines located at 13 Farmery Road, Newtown, Connecticut.  Abutters List & Map.

 

PETITION NO. 1154 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Haddam Substation and associated 345-kV and 115-kV transmission lines located at 1384 Saybrook Road, Haddam, Connecticut.

 

PETITION NO. 1155 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 19 Main Street, Old Saybrook, Connecticut.

 

PETITION NO. 1156 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing 120-foot tall telecommunications facility with a new 150-foot telecommunications facility located at property owned by Eversource Energy used as a service center and maintenance yard, 2 Tindall Avenue, Norwalk, Connecticut.  Signed Abutter Letter.  Norwalk Mailing List.

 

PETITION NO. 1157 Eversource Energy and The United Illuminating Company joint petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission substation remediation activities to comply with the North American Electric Reliability Corporation (NERC) Reliability Standards for Critical Infrastructure Protection.

 

PETITION NO. 1158 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 398 Somers Road, Ellington, Connecticut.

 

PETITION NO. 1159 - Lodestar Energy LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 2.0 MW AC Solar Photovoltaic Electric Generating facility located at 1005 North Street, Suffield, Connecticut.

 

PETITION NO. 1160 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing industrial building located at 278 Oakwood Drive, Glastonbury, Connecticut.


TOWER SHARE REQUESTS
______________________________________
 
 
____________________________________
 
OTHER CSC PROCEEDINGS
______________________________________
 
2014/2015 Connecticut Siting Council Review of the Ten Year Forecast of Connecticut Electric Loads and Resources (2014-2023)
______________________________________
 
 
 


Content Last Modified on 5/27/2015 9:19:31 AM