CSC: Pending Proceedings

Pending Proceedings

 
The hyperlinks that appear below lead to web pages devoted to record materials relating to proceedings that are pending before the Siting Council.
 

Please note, the Connecticut Siting Council (Council) is not required to maintain an online data base of Pending Proceedings.  Due to a high volume of filings, the Council may not be able to keep the information found on these sites up to date.  For complete Pending Proceeding information, please contact the Council's staff or feel free to view the hard copy of the pertinent file in the Council’s office.  The Council endeavors to keep information up to date for the convenience of the public.

 
The Council's preferred method of service to participants in a proceeding is via electronic mail.  If a participant prefers to receive hard copies of documents via regular mail, please notify the Council in writing.
_____________________________________

DOCKETS
 _____________________________________

DOCKET NO. 459 - Message Center Management and New Cingular Wireless PCS, LLC (AT&T) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Glastonbury Tax Assessor Map E3, Block 0820, Lot E0002, Seven J’s Farm, Candlewood Road, Glastonbury, Connecticut.

DOCKET NO. 458 - Florida Tower Partners LLC d/b/a North Atlantic Towers Application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation, of a telecommunications facility at one of two locations at Bethel Tax Assessor’s Map 65, Block 57, Lot 122, 62-64 Codfish Hill Road, Bethel, Connecticut.

DOCKET NO. 457 - New Cingular Wireless PCS, LLC (AT&T) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Monroe Tax Assessor’s Map 107, Parcel 8.02, 30 Cobblers Hill Court, Monroe, Connecticut

DOCKET NO. 456 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Plymouth Tax Assessor Map 054/065/016A-1, 33 Keegan Road, Plymouth, Connecticut.

DOCKET NO. 455 Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Southington Tax Assessor Map/Lot 066053, 99 East Street, Southington, Connecticut. 

DOCKET NO. 454 - Tower Holdings, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Farmington Tax Assessor Parcel ID Maps 25 and 26, Lots 3A and 3B, 199 Brickyard Road, Farmington, Connecticut.

DOCKET NO. 453 – American Tower Corporation and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Manchester Tax Assessor Map 133, Block 3700, Lot 701, 701 Lydall Street, Manchester, Connecticut.

DOCKET NO. 192B - CPV Towantic, LLC Motion to Reopen and Modify the June 23, 1999 Certificate of Environmental Compatibility and Public Need based on changed conditions pursuant to Connecticut General Statutes §4-181a(b) for the construction, maintenance and operation of a 785 MW dual-fuel combined cycle electric generating facility located north of the Prokop Road and Towantic Hill Road intersection in the Town of Oxford, Connecticut.

 


 
The following dockets have been acted upon by the Siting Council and await approval of their Development and Management Plans:
______________________________________
 
DOCKET NO. 452 - Homeland Towers, LLC and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Salisbury Tax Assessor Map 16 Lot 5, 250 Canaan Road, Salisbury, Connecticut.

DOCKET NO. 451 - Homeland Towers, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at the Cheshire Wastewater Treatment Plant, Cheshire Tax Assessor Map 38, Lot 180, 1325 Cheshire Street, Cheshire, Connecticut.


DOCKET NO. 449 - Message Center Management Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Redding Tax Assessor Map 23, Lot 72, Redding Ridge Fire Department, 186 Black Rock Turnpike, Redding, Connecticut.


DOCKET NO. 448 - Cellco Partnership d/b/a Verizon Wireless Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Orange Tax Assessor Map 77, Block 3, Lot 1, 831 Derby Milford Road, Orange, Connecticut.

 
DOCKET NO. 421 – T-Mobile Northeast LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility located at 158 Edison Road, Trumbull, Connecticut.
_____________________________________

PETITIONS
_____________________________________

PETITION NO. 1120  The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Hawthorne Substation located at 180 Hawthorne Drive, Fairfield, Connecticut.  

 

PETITION NO. 1135 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and expansion of an existing light pole for the installation of telecommunications antennas and associated equipment at Penders Field, Longbrook Park, located at Glendale Road, Stratford, Connecticut.  Date for Decision.

 

PETITION NO. 1140 Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed reconductoring of a portion of an existing 115-kV transmission line extending from Barbour Hill Substation in South Windsor to Manchester Substation in Manchester, Connecticut and modifications to Barbour Hill Substation and Manchester Substation.  Filing Part 1 of 3.  Filing Part 2 of 3.  Filing Part 3 of 3.

 

PETITION NO. 1144 Bloom Energy Corporation, as an agent for Home Depot USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 104 Danbury Road, New Milford, Connecticut.

 

PETITION NO. 1145 Bloom Energy Corporation, as an agent for Home Depot USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 816 Hartford Turnpike, Waterford, Connecticut.

 

PETITION NO. 1146 Bloom Energy Corporation, as an agent for Home Depot USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 1580 Litchfield Turnpike, New Hartford, Connecticut. 

Revised Abutters List.  Revised Abutter's Notification.

 

PETITION NO. 1147 Bloom Energy Corporation, as an agent for Home Depot USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 1932 Norwich-New London Turnpike, Montville, Connecticut. 

Revised Abutters List.

 

PETITION NO. 1148 Bloom Energy Corporation, as an agent for Home Depot USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 600 Connecticut Avenue, Norwalk, Connecticut.  Incomplete Notice.

Revised Abutters List.

 

PETITION NO. 1149 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 109 Federal Road, Danbury, Connecticut.

 

PETITION NO. 1150 – SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 3.1 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located on Brush Hill Road in Bozrah, Connecticut. Filing Part 1 of 2.  Filing Part 2 of 2.

 

PETITION NO. 1151 – The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal and replacement of the existing 115-kV transmission line structures in the Connecticut Department of Transportation right-of-way outside of Milvon substation located at 772 Bridgeport Avenue, Milford, Connecticut.  Protective Order Documents.

 

PETITION NO. 1152 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary telecommunications facility located at East Lyme Tax Assessor Map 30, Lot 1, Ancient Highway, East Lyme, Connecticut.  Filing Part 1 of 2.  Filing Part 2 of 2.


TOWER SHARE REQUESTS
______________________________________
______________________________________
 
OTHER CSC PROCEEDINGS
______________________________________
 
2014/2015 Connecticut Siting Council Review of the Ten Year Forecast of Connecticut Electric Loads and Resources (2014-2023)
______________________________________
 
 
 


Content Last Modified on 4/15/2015 1:47:01 PM