CSC: Pending Matters

Pending Matters

 
The hyperlinks that appear below lead to web pages devoted to record materials relating to matters that are pending before the Siting Council.
 

Please note, the Connecticut Siting Council (Council) is not required to maintain an online data base of Pending Matters.  Due to a high volume of filings, the Council may not be able to keep the information found on these sites up to date.  For complete Pending Matter information, please contact the Council's staff or feel free to view the hard copy of the pertinent file in the Council’s office.  The Council endeavors to keep information up to date for the convenience of the public.

 
The Council's preferred method of service to participants in a matter is via electronic mail.  If a participant prefers to receive hard copies of documents via regular mail, please notify the Council in writing.

If you do not find the matter you are looking for, it is likely that a decision was recently rendered and the matter may be accessed through the Decisions page at the following link Council Decisions.
_____________________________________

DOCKETS
 _____________________________________
 




DOCKET NO. 470 - NTE Connecticut, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 550-megawatt dual-fuel combined cycle electric generating facility and associated electrical interconnection switchyard located at 180 and 189 Lake Road, Killingly, Connecticut.


 

_____________________________________

PETITIONS
_____________________________________

 

PETITION NO. 1262 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 1380-kilowatt customer-side combined heat and power fuel cell facility to be located at the Borough of Naugatuck Waste Water Treatment Plant, 500 Cherry Street Extension, Naugatuck, Connecticut.

PETITION NO. 1263 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing customer-side 400 kilowatt (kW) fuel cell facility with a 440-kW customer-side fuel cell facility located at Mount Sinai Hospital, 500 Blue Hills Avenue, Hartford, Connecticut.

PETITION NO. 1264 - Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 400-Kilowatt Fuel Cell Facility to be located at the Frontier building, 25 Butler Street, Meriden, Connecticut.

PETITION NO. 1265 - Doosan Fuel Cell America Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a customer-side 460-kilowatt fuel cell facility to be located at the Norwich Inn and Spa, 607 West Thames Street, Norwich, Connecticut.

PETITION NO. 1266 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 1840-kilowatt customer-side fuel cell facility to be located at the Waterbury Water Pollution Control Plant, 210 Municipal Road, Waterbury, Connecticut.

PETITION NO. 1268 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 460-kilowatt customer-side combined heat and power fuel cell facility to be located at the Unilever Research and Development Center building, 20 Merritt Boulevard, Trumbull, Connecticut.

PETITION NO. 1270 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing customer-side 200-kilowatt fuel cell facility with a 460-kilowatt customer-side combined heat and power fuel cell facility to be located at the Fairfield Wastewater Treatment Facility, 183 Richard White Way, Fairfield, Connecticut.

PETITION NO. 1271 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of the Hyllier dormitory building located at the University of Hartford, 200 Bloomfield Avenue, West Hartford, Connecticut.

PETITION NO. 1272 - Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 1.4-Megawatt Fuel Cell Facility to be located at the Frontier building, 310 Orange Street, New Haven, Connecticut.

PETITION NO. 1274 - Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Frontier building, 39 West Street, Danbury, Connecticut.

PETITION NO. 1275 - Bloom Energy Corporation, as an agent for Stanley Black & Decker, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Stanley Access Technologies building, 65 Scott Swamp Road, Farmington, Connecticut.

PETITION NO. 1276 - Bloom Energy Corporation, as an agent for Stanley Black & Decker, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Stanley Engineered Fastening building, 4 Shelter Rock Lane, Danbury, Connecticut.

PETITION NO. 1277 - Bloom Energy Corporation, as an agent for Stanley Black & Decker, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 250-Kilowatt Fuel Cell Facility to be located at the Stanley Black & Decker World Headquarters, 1000 Stanley Drive, New Britain, Connecticut.

PETITION NO. 1278 - Bloom Energy Corporation, as an agent for Medtronic Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at 20 Middletown Avenue and a Customer-Side 300 Kilowatt Fuel Cell Facility to be located at 195 McDermott Road, both located at the Medtronic campus in North Haven, Connecticut.

PETITION NO. 1279 - Bloom Energy Corporation, as an agent for The TJX Companies Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 500-Kilowatt Fuel Cell Facility to be located at the TJX building, 1415 Blue Hills Avenue, Bloomfield, Connecticut.

PETITION NO. 1280 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of an existing commercial building located at 35-37 Danbury Road, Ridgefield, Connecticut.

PETITION NO. 1281 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 35-kilowatt propane-fueled back-up generator and a 1,000 gallon propane tank at an existing wireless telecommunication facility located at 21 Acorn Road, Branford, Connecticut.

PETITION NO. 1282 - New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a wireless telecommunications facility on the roof of the existing office building located at 208 Harbor Drive, Stamford, Connecticut.

PETITION NO. 1283 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Southington Substation located at 315 Belleview Avenue, Southington, Connecticut.

PETITION NO. 1284 - Bloom Energy Corporation, as an agent for FedEx Ground, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 250-Kilowatt Fuel Cell Facility to be located at the FedEx Ground building, 40 Kennedy Road, South Windsor, Connecticut.

PETITION NO. 1285 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on a replacement light pole located at Samuel M. Peretz Park, 221 West Main Street, Niantic (East Lyme), Connecticut.



TOWER SHARE REQUESTS
 
______________________________________
 

TS-T-MOBILE-068-161118 - T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 38 Maple Street, Kent, Connecticut.  Incomplete LetterResponse to Incomplete Letter  Second Incomplete LetterResponse to Second Incomplete Letter.

TS-T-MOBILE-125-161214 - T-Mobile Northeast LLC request for an order to approve tower sharing at an existing telecommunications facility located at 70 Herb Road, Sharon, Connecticut.

 


 
PETITION NO. 1133 - SUB PETITION FILINGS
______________________________________
 
PE1133-VER-20170109 – Cellco Partnership d/b/a Verizon Wireless sub-petition for a declaratory ruling for approval of an eligible facility request for modifications to an existing telecommunications facility located at 401 Lopus Road, Beacon Falls, Connecticut.

 
The following have been acted upon by the Siting Council and await approval of their Development and Management Plans:
______________________________________


DOCKET NO. 453 – American Tower Corporation and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Manchester Tax Assessor Map 133, Block 3700, Lot 701, 701 Lydall Street, Manchester, Connecticut.


DOCKET NO.  463A – American Towers, LLC and New Cingular Wireless PCS, LLC amended application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 351A Boston Post Road, East Lyme, Connecticut or for the construction, maintenance and operation of a telecommunications facility at an alternative site located at 2 Arbor Crossing, East Lyme, Connecticut pursuant to Connecticut General Statutes §4-181a(a).

 

DOCKET NO. 467 - Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Brookfield Tax Assessor Map E10, Lot 014, 100 Pocono Road, Brookfield, Connecticut.


DOCKET NO. 468 - The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Southwest Connecticut Reliability Project that traverses the municipalities of Bethel, Danbury, and Brookfield, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 3.4 miles between Eversource’s existing Plumtree Substation in the Town of Bethel to its existing Brookfield Junction in the Town of Brookfield; (b) reconfiguration of two existing 115-kV double-circuit electric transmission lines at Eversource’s existing Stony Hill Substation in the Town of Brookfield; and (c) related substation modifications.


DOCKET NO. 469 – Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Killingly Tax Assessor’s Map 143, Lot 6, 520 Bailey Hill Road, Killingly, Connecticut.

 
PETITION NO. 1184 - Beacon Falls Energy Park, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 63.3 Megawatt AC fuel cell facility located on Lopus Road, Beacon Falls, Connecticut. 

PETITION NO. 1195 - SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 4.05 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located on municipally-owned property at 1240 Poquonnock Road, Groton, Connecticut. 

PETITION NO. 1220 -Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and one 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located at 1219 and 1240 Voluntown Road, Griswold, Connecticut.

PETITION NO. 1222 - Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and four 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located southeast of Hartford Turnpike and south of Fisk Road, Hampton, Connecticut.

PETITION NO. 1224  - Woods Hill Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 17.61 Megawatt AC Solar Photovoltaic Electric Generating facility located at 90 and 101 Woods Hill Road, Pomfret, Connecticut.

PETITION NO. 1247 - C-TEC Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a 3.75 MW solar photovoltaic electric generating facility located at 1 Ballard Road, Thompson, Connecticut.

 
OTHER CSC PROCEEDINGS
_____________________________________
 
2016/2017 Connecticut Siting Council Review of the Ten Year Forecast of Connecticut Electric Loads and Resources (2016-2025)

______________________________________
 



























Content Last Modified on 1/12/2017 1:15:23 PM