CSC: Pending Matters

Pending Matters

 
The hyperlinks that appear below lead to web pages devoted to record materials relating to matters that are pending before the Siting Council.
 

Please note, the Connecticut Siting Council (Council) is not required to maintain an online data base of Pending Matters.  Due to a high volume of filings, the Council may not be able to keep the information found on these sites up to date.  For complete Pending Matter information, please contact the Council's staff or feel free to view the hard copy of the pertinent file in the Council’s office.  The Council endeavors to keep information up to date for the convenience of the public.

 
The Council's preferred method of service to participants in a matter is via electronic mail.  If a participant prefers to receive hard copies of documents via regular mail, please notify the Council in writing.

If you do not find the matter you are looking for, it is likely that a decision was recently rendered and the matter may be accessed through the Decisions page at the following link Council Decisions.
_____________________________________

DOCKETS
 _____________________________________
 

DOCKET NO. 463 - American Towers, LLC and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at East Lyme Tax Assessor Parcel ID 29.0 45, 351A Boston Post Road, East Lyme, Connecticut.


DOCKET NO. 467 - Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Brookfield Tax Assessor Map E10, Lot 014, 100 Pocono Road, Brookfield, Connecticut.


DOCKET NO. 468 - The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Southwest Connecticut Reliability Project that traverses the municipalities of Bethel, Danbury, and Brookfield, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 3.4 miles between Eversource’s existing Plumtree Substation in the Town of Bethel to its existing Brookfield Junction in the Town of Brookfield; (b) reconfiguration of two existing 115-kV double-circuit electric transmission lines at Eversource’s existing Stony Hill Substation in the Town of Brookfield; and (c) related substation modifications.


DOCKET NO. 469 – Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Killingly Tax Assessor’s Map 143, Lot 6, 520 Bailey Hill Road, Killingly, Connecticut.


DOCKET NO. 470 – NTE Connecticut, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 550-megawatt dual-fuel combined cycle electric generating facility and associated electrical interconnection switchyard located at 180 and 189 Lake Road, Killingly, Connecticut.


 

_____________________________________

PETITIONS
_____________________________________

PETITION NO. 1238 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the 1779 transmission line traversing the municipalities of Hartford, East Hartford, and South Windsor, Connecticut, and related transmission line structure improvements.

PETITION NO. 1244  - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing commercial building located at 2985-3017 Berlin Turnpike, Newington, Connecticut.

PETITION NO. 1245 - T-Mobile Northeast LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of an additional rooftop wireless telecommunications facility located at the Connecticut Post Mall, 1201 Boston Post Road, Milford, Connecticut.

PETITION NO. 1246Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal of one existing 69-kV dead-end wood electric transmission line structure, replacement of two existing 69-kilovolt (kV) wood H-frame tap angle electric transmission line structures (Line 100 and Line 400) with two 3-pole weathering steel angle electric transmission line structures, relocation of the conductors from the existing electric transmission line structures to the proposed electric transmission line structures located at Gales Ferry Substation, 301 Whalehead Road, Ledyard, Connecticut and related transmission line and substation improvements.

PETITION NO. 1247 – C-TEC Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a 3.75 MW solar photovoltaic electric generating facility located at 1 Ballard Road, Thompson, Connecticut.

PETITION NO. 1248 - TRS Fuel Cell, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 3.7 megawatt combined heat and power fuel cell facility to located at 64 Triangle Street, Danbury, Connecticut.

PETITION NO. 1249 - Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the planned addition of a launcher and a mainline valve along the existing Iroquois pipeline right of way located off of Canterbury Lane in Newtown, Connecticut, and an above ground receiver and fuel cell generator to power the cathodic protection system along the existing Iroquois pipeline right of way located off of Stonebridge Trail in Newtown, Connecticut.

PETITION NO. 395A - T-Mobile Northeast LLC (T-Mobile) request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to relocate an existing T-Mobile facility attached to an Eversource electric transmission line structure (#2997) onto an approved replacement electric transmission line structure (#2997) within the existing Eversource right-of-way located in the parking lot of the Wilton Railroad Station near the intersection of Route 7 and Route 33 (Old Station Road a/k/a 15 Old Danbury Road) in Wilton, Connecticut.

PETITION NO. 764A - T-Mobile Northeast LLC (T-Mobile) request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to relocate an existing T-Mobile facility attached to an Eversource transmission line structure (#1814) onto an approved replacement electric transmission line structure (#1814) within the existing Eversource right-of-way located at 437 Hobart Street, Southington, Connecticut.

 


TOWER SHARE REQUESTS
 
______________________________________
TS-T-MOBILE-121-160712 - T-Mobile Northeast LLC request for an order to approve tower sharing at an existing telecommunications facility located at 160 Witch Meadow Road, Salem, Connecticut.

TS-T-MOBILE-121-160721 - T-Mobile Northeast LLC request for an order to approve tower sharing at an existing telecommunications facility located at 27 Maynard Road, Salem, Connecticut.

TS-T-MOBILE-062-160818 - T-Mobile Northeast LLC request for an order to approve tower sharing at an existing telecommunications facility located at 150 Willow Street, Hamden, Connecticut.

TS-EVER-086-160823 – Eversource Energy request for an order to approve tower sharing at an existing telecommunications facility located at 911 Route 32 (Norwich New London Turnpike), Montville, Connecticut.
 

 
PETITION NO. 1133 - SUB PETITION FILINGS
______________________________________

PE1133-VER-20160805 – Cellco Partnership d/b/a Verizon Wireless sub-petition for a declaratory ruling for approval of an eligible facility request for modifications to an existing telecommunications facility located at 168 Catoona Lane, Stamford, Connecticut.
 
 

 
The following have been acted upon by the Siting Council and await approval of their Development and Management Plans:
______________________________________
 

DOCKET NO. 466 - The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Frost Bridge to Campville 115-kilovolt (kV) electric transmission line project that traverses the municipalities of Watertown, Thomaston, Litchfield, and Harwinton, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 10.4 miles between Eversource’s existing Frost Bridge Substation in the Town of Watertown and existing Campville Substation in the Town of Harwinton; (b) related modifications to Frost Bridge Substation and Campville Substation; and (c) reconfiguration of a 0.4 mile segment of two existing 115-kV electric transmission lines across the Naugatuck River in the Towns of Litchfield and Harwinton within the same existing right-of-way as the new 115-kV electric transmission line.

 

DOCKET NO. 465 - The United Illuminating Company application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 115/13.8-kilovolt (kV) replacement substation facility located on an approximately 1.5 acre portion of two adjoining UI-owned parcels directly adjacent to UI’s existing Baird Substation, 1770 Stratford Avenue, Stratford, Connecticut, and related transmission structure and interconnection improvements.


DOCKET NO. 462 – Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Danbury Tax Assessor’s Map L16, Lot 5, 15 Great Pasture Road, Danbury, Connecticut.
  
DOCKET NO. 453 – American Tower Corporation and New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Manchester Tax Assessor Map 133, Block 3700, Lot 701, 701 Lydall Street, Manchester, Connecticut
 
PETITION NO. 1178 – Fusion Solar Center, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation and maintenance of a ground-mounted 20 megawatt solar photovoltaic electric generating facility located on Potash Hill Road, Sprague, Connecticut.

PETITION NO. 1184 - Beacon Falls Energy Park, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 63.3 Megawatt AC fuel cell facility located on Lopus Road, Beacon Falls, Connecticut. 

PETITION NO. 1195 - SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction and operation of a 4.05 Megawatt Community Shared Solar Photovoltaic Electric Generating facility located on municipally-owned property at 1240 Poquonnock Road, Groton, Connecticut. 

PETITION NO. 1215 - Shagbark Lumber and Farm Supplies, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 1.6 Megawatt Solar Photovoltaic Electric Generating facility located at 21 Mount Parnassus Road, a/k/a Route 434, East Haddam, Connecticut. 

PETITION NO. 1217 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed separation of the existing 1779/1777 115 kilovolt (kV) electric transmission lines for 1.6 miles within existing right of way from Bloomfield Substation to Bloomfield Junction;  proposed separation of the existing 1751/1777 115kV electric transmission lines for 5.3 miles within existing right of way from Bloomfield Junction to North Bloomfield Substation; modifications to the existing overhead 1779 115 kV electric transmission line to loop into the Rood Avenue Substation via underground cables; including related transmission line structure improvements; and modifications to the Bloomfield Substation, 40 Crestview Drive and North Bloomfield Substation, 2 Hoskins Road both in Bloomfield, Connecticut and modifications to the Rood Avenue Substation located at 275 Rood Avenue, Windsor, Connecticut.

PETITION NO. 1218 - PSEG Power Connecticut LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a new 485 megawatt (MW) dual fuel combined-cycle electric generating facility at the existing Bridgeport Harbor Station located at 1 Atlantic Street, Bridgeport, Connecticut.

PETITION NO. 1220 -Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and one 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located at 1219 and 1240 Voluntown Road, Griswold, Connecticut.

PETITION NO. 1222 - Windham Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of three 2.0 Megawatt and four 1.0 Megawatt Solar Photovoltaic Electric Generating facilities located southeast of Hartford Turnpike and south of Fisk Road, Hampton, Connecticut.

PETITION NO. 1224  - Woods Hill Solar, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 17.61 Megawatt AC Solar Photovoltaic Electric Generating facility located at 90 and 101 Woods Hill Road, Pomfret, Connecticut.

PETITION NO. 1227 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of electric transmission line structures within approximately .8 miles of existing right of way along its existing No. 1975 115-kV transmission line traversing the municipalities of Middlefield, Durham and Middletown, Connecticut, and related transmission line structure improvements.

PETITION NO. 1234 - SolarCity Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 2.8 Megawatt Solar Photovoltaic Electric Generating facility located at Becton, Dickinson & Company, 7 Grace Way, North Canaan, Connecticut.

 
OTHER CSC PROCEEDINGS
_____________________________________
 
2016/2017 Connecticut Siting Council Review of the Ten Year Forecast of Connecticut Electric Loads and Resources (2016-2025)

______________________________________
 
 


Content Last Modified on 8/24/2016 9:23:19 AM