CSC: Petition No. 1217 - Eversource/BloomfieldtoWindsor
Petitions

 
PETITION NO. 1217 -  Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed separation of the existing 1779/1777 115 kilovolt (kV) electric transmission lines for 1.6 miles within existing right of way from Bloomfield Substation to Bloomfield Junction;  proposed separation of the existing 1751/1777 115kV electric transmission lines for 5.3 miles within existing right of way from Bloomfield Junction to North Bloomfield Substation; modifications to the existing overhead 1779 115 kV electric transmission line to loop into the Rood Avenue Substation via underground cables; including related transmission line structure improvements; and modifications to the Bloomfield Substation, 40 Crestview Drive and North Bloomfield Substation, 2 Hoskins Road both in Bloomfield, Connecticut and modifications to the Rood Avenue Substation located at 275 Rood Avenue, Windsor, Connecticut.
 
PETITION FILING
 
PROCEDURAL CORRESPONDENCE
 
DECISION
 
DEVELOPMENT & MANAGEMENT PLAN SUB STATION
 
            Volume One 07/29/2016
             Volume Two 07/29/2016
 
 
DEVELOPMENT & MANAGEMENT PLAN TRANSMISSION LINE
 
Monthly Construction Reports
 


Content Last Modified on 10/5/2017 8:58:31 AM