CSC: PE 1255 - Eversource -Branford

PETITION NO. 1255 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Branford Double-Circuit Tower Split Project that includes modifications to the existing electric transmission line structure No. 4800, installation of a new electric transmission line structure No. 4782 and the separation of two existing 115-kilovolt (kV) electric transmission line circuits located within existing Eversource electric transmission line right of way between Interstate 95 and Eversource’s Branford Substation facility, East Main Street, Branford, Connecticut.
 
PETITION
 
PROCEDURAL CORRESPONDENCE
 
DECISION
 


Content Last Modified on 6/14/2017 9:34:31 AM